HORIZONTAL ROPE CLUSTER 6 ROPE SET IN A SINGLE HORIZONTAL ROPE CLUSTER FOR MALE,HORIZONTAL ROPE CLU
Indo Tibetan Border Police (itbp)
PANCHKULA, HARYANA
Progress
Quantity
1318
Category
HORIZONTAL ROPE CLUSTTER 06 rope set in a single horizontal rope clustter
Bid Type
Two Packet Bid
Public procurement opportunity for Indo Tibetan Border Police (itbp) HORIZONTAL ROPE CLUSTTER 06 rope set in a single horizontal rope clustter, HORIZONTAL ROPE 2nd type, VERTICAL ROPE CLUSTTER 28 rope set in a single vertical rope cluster 07 rope in each side, HYPER EXTENSION 12mt length and 1 20mtr height Distance of two vertical pole 75mt and 17 nos of vertical pole and one 12 mt length horizontal pole in a single hyper extension set, WALL BAR 09mtr length and 5 33 mtr height Distance between two vertical pole 0 45 mt and 13 nos of vertical pole 17 nos of horizontal pole between two vertical pole, CHIN UP BAR 06 30mtr length and 06 20mtr width total 25 nos of vertical pole in a single chin up bar, Coarse sand, Fine sand, coarse aggregate 20mm good quality in cu feet in PANCHKULA, HARYANA. Quantity: 1318 issued by. Submission Deadline: 23-01-2025 13: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
HORIZONTAL ROPE CLUSTTER 06 rope set in a single horizontal rope clustter , HORIZONTAL ROPE 2nd type , VERTICAL ROPE CLUSTTER 28 rope set in a single vertical rope cluster 07 rope in each side , HYPER EXTENSION 12mt length and 1 20mtr height Distance of two vertical pole 75mt and 17 nos of vertical pole and one 12 mt length horizontal pole in a single hyper extension set , WALL BAR 09mtr length and 5 33 mtr height Distance between two vertical pole 0 45 mt and 13 nos of vertical pole 17 nos of horizontal pole between two vertical pole , CHIN UP BAR 06 30mtr length and 06 20mtr width total 25 nos of vertical pole in a single chin up bar , Coarse sand , Fine sand , coarse aggregate 20mm good quality in cu feet
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indo Tibetan Border Police (itbp)
PANCHKULA, HARYANA
Power Grid Corporation Of India Limited
KURNOOL, ANDHRA PRADESH
Uranium Corporation Of India Limited
EAST SINGHBHUM, JHARKHAND
Indian Army
Ajmer, RAJASTHAN
Power Grid Corporation Of India Limited
KURNOOL, ANDHRA PRADESH
Tender Results
Loading results...
HORIZONTAL ROPE CLUSTTER 06 rope set in a single horizontal rope clustter
Pole specification Diameter Minimum 5inch Height above G L 2 59 mtr Depth below G L 90mtr Distance between 02 vertical pole in same row 1 80 mtr Distance between 02 vertical pole in adjacent row 11 00 mtr Total Nos of Pole 06 Nos in each Row & total 12 nos in both row Supporting material Each Vertical pole should be supported by 3 nos 40 x 40 x 4 mm MS Angle Inclined length for 02 nos long length has at least of 3 10 mtr & for 01 no short length support should be at least 1 80 mtr joined with 40x40x4 mm MS Angle Angle should be embedded in ground by 1 2 4 1 Cement 2 coarse sand 4 coarse aggregate 20 mm size position cement concrete Pole Foundation Pole should be embedded in ground by 1 2 4 1 Cement 2 coarse sand 4 coarse aggregate 20 mm size position cement concrete upto minimum depth of 0 90 meter with anchorage at bottom Finishing Iron work should be finished with enamel paint as required after application of metal primer to give an even & smooth shade as required Base specification Height above G L Brick base of dimension 10 50 x0 75 x0 75 mtr Height below G L Brick base of dimension 10 50 x0 75 x0 45 mtr Foundation 1 4 8 1 Cement 4 coarse sand 8 coarse aggregate 20 mm size position cement concrete below base 10 50 x0 75 x0 10 meter Finishing Outer surface of base above G L should be plaster with 15 mm thick 1 4 1 Cement 4 Fine sand & finished with exterior paint Finishing Enamel Paint on iron work & exterior paint on brick base color as required Rope specification Manila rope having circumference 102 mm Minimum length of main horizontal rope pully to pully is 11 00 mtr with end support length 2 55 mtr height 02 nos Vertical rope on each horizontal rope Total nos of vertical rope 2 x 6 12 nos Other requirement Pully system for rope on top of each pole Hook for rope support Ground should be clear & leveled Abbreviations G L Ground level dia diameter mtr Meter
HORIZONTAL ROPE 2nd type
Inclined Pole specification Inclined support 08 Nos MS Channel 5 x2 5 x6 mm having total 4 05 mtr minimum length & should be embedded in ground by 1 2 4 1 Cement 2 coarse sand 4 coarse aggregate 20 mm size position cement concrete Horizontal Pole specification Dia 100 mm Ms Round Pipe Medium Qty & Length Total 02Nos 3 05 mtr long on Top 01No for each side total 1 x 2 2 nos Distance between horizontal pole 11 00 mtr Finishing Iron work should be finished with enamel paint as required after application of metal primer to give an even & smooth shade as required Rope specification Manila rope having circumference 102mm Minimum length of rope is 18 00x2no 36mtr Other requirement Guest plate in both side of horizontal pole to support Welding & fitting accessories Ground should be clear & leveled Abbreviation G L Ground level dia diameter mtr Meter
VERTICAL ROPE CLUSTTER 28 rope set in a single vertical rope cluster 07 rope in each side
Size Outer size from pole to pole 6 40 x 6 40mtr Side & Roof accessories Opened from sides & covered on roof with 0 50mm thick 120gm zink coated PGI sheet roofing with self screw or j hook 500 600mm wide Ridge of plain sheet on top Roof should be extended at least 0 90mtr from vertical pole in each side with complete accessories 04Nos MS Channel 5 x2 5 x6mm top purlin on vertical pole as Tie beam in 04 sides MS Hollow pipe 3 x1 5 x5mm in top runner & truss part as per drawing Pole specification Diameter of vertical pole Minimum 5inch Height above G L of vertical pole 7 65mtr Depth below G L of vertical pole 0 90mtr Distance between 02 vertical pole in same row 6 40mtr Distance between 02 vertical pole in adjacent row 6 40mtr Total Nos of of vertical pole 02Nos in 01 Row & total 04nos in both rows Supporting material Each Vertical pole should be supported by 01no Medium 3inch dia MS round hollow pipe of minimum 6 50 mtr length It should be properly embedded in ground by 1 2 4 1Cement 2 coarse sand 4 coarse aggregate 20mm size Position cement concrete with anchorage at bottom Finishing Iron work should be finished with enamel paint as required after application of metal primer to give an even & smooth shade Rope specification Manila rope having circumference 102mm Minimum length of rope is 7 65mtr Total nos of vertical rope 7x4 28nos Other requirement Heavy duty hook for roop 07Nos in each side Total nos 7x4 28nos Ground should be clear & leveled Abbreviation G L Ground level dia diameter mtr Meter
HYPER EXTENSION 12mt length and 1 20mtr height Distance of two vertical pole 75mt and 17 nos of vertical pole and one 12 mt length horizontal pole in a single hyper extension set
HYPER EXTENSION Refer drawing 3 1 Size Length 12 00 mtr x height 1 20 mtr Thigh support specification Vertical pole Diameter 17 Nos of Minimum 65mm Diameter Height above G L 1 20mtr Depth below G L 0 60mtr Distance between 02 vertical pole in same row 0 75mtr Total Nos of Pole 17Nos in single row Supporting material 3 20mm thick Gusset plate size 0 25x0 25mtr on each pole Total 17x1 17nos Good quality Foam matt L 40feet xB 8 inch x h 2 inch with necessary required fittings complete Good quality Wooden plank 40feet xB 8 inch x h 2 inch with necessary required fittings complete Pole Foundation Pole should be embedded in ground by 1 2 4 1Cement 2 coarse sand 4 coarse aggregate 20mm size position cement concrete upto minimum depth of 0 90meter with anchorage at bottom Finishing Iron & wood work should be finished with enamel paint as required after application of primer to give an even & smooth shade as required Ankle support specification Vertical pole Diameter 09 Nos of Minimum 40mm Diameter Horizontal pole 02Nos 40mm dia Horizontal pole Height above G L 1st pole at 0 60mtr & 2nd pole at 0 90mtr Depth below G L 0 60mtr Distance between 02 vertical pole in same row 1 50mtr Total Nos of Pole 09Nos in single row Pole Foundation Pole should be embedded in ground by 1 2 4 1Cement 2 coarse sand 4 coarse aggregate 20mm size position cement concrete upto minimum depth of 0 60meter with anchorage at bottom Finishing Iron & wood work should be finished with enamel paint as required after application of primer to give an even & smooth shade as required Other requirement Welding & fitting accessories Ground should be clear & leveled Abbreviation G L Ground level dia diameter mtr Meter
WALL BAR 09mtr length and 5 33 mtr height Distance between two vertical pole 0 45 mt and 13 nos of vertical pole 17 nos of horizontal pole between two vertical pole
Wall Bar Refer drawing 4 1 Size Length 9 00 mtr x height 5 33 mtr Pole specification vertical pole 13 Nos MS Channel 100 x 50 x 6 mm 0 45 mtr Height above G L of vertical pole 4 43 mtr Depth below G L of vertical pole 0 90 mtr Total Nos of Pole 13 Nos in single Row Supporting material Vertical pole should be supported by MS Flat 100x6mm on top Pole Foundation Pole should be embedded in ground by 1 2 4 1Cement 2 coarse sand 4 coarse aggregate 20mm size position cement concrete upto minimum depth of 0 90meter with anchorage at bottom Finishing Iron work should be finished with enamel paint as required after application of metal primer to give an even & smooth shade as required Other requirement 17 nos 40mm round G I pipe with threaded end for socket & at 0 23mtr spacing Bottom 1st pipe at 0 30mtr Flat should be at a distance of 0 45mtr from last 40mm dia pole on top G I socket on each side of 40mm round G I pipe Total qty 17x2 34nos Hole for crossing of 40mm round G I pipe Welding & fitting accessories Ground should be clear & leveled Abbreviation G L Ground level dia diameter mtr Meter
CHIN UP BAR 06 30mtr length and 06 20mtr width total 25 nos of vertical pole in a single chin up bar
Size Length 6 20 mtr x width 6 20 x height 3 15 mtr Pole specification vertical pole 25 Nos G I Round medium pipe 50 mm Height above G L of vertical pole 3 15 mtr Depth below G L of vertical pole 0 75 mtr Total Nos of Pole 25 Nos Supporting material G I Round sheet 6 dia & 3 mm thick on each vertical pole Total 25x2 50nos Horizontal pole on top 30mm Medium Dia 25Nos G I Round Pipe 6 20mtr longPole Foundation Pole should be embedded in ground by 1 2 4 1Cement 2 coarse sand 4 coarse aggregate 20mm size position cement concrete up to minimum depth of 0 75meter with anchorage at bottom Finishing Iron work should be finished with enamel paint as required after application of metal primer to give an even & smooth shade as required Flooring size 7 35x7 35mtr 1 2 4 1Cement 2 coarse sand 4 coarse aggregate 20mm size Cement concrete flooring 0 125mtr thick Other requirement 02 Nos G I Round Pipe 30mm Medium 0 10mtr long support in 6 G I Round sheet Welding & fitting accessories Ground should be clear & leveled Abbreviation G L Ground level dia diameter mtr Meter
Coarse sand
coarse aggregate 20mm good quality in cu feet
Fine sand
COARSE SAND GOOD QUALITY
coarse aggregate 20mm good quality in cu feet
FINE SAND GOOD QUALITY
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | HORIZONTAL ROPE CLUSTTER 06 rope set in a single horizontal rope clustter | Pole specification Diameter Minimum 5inch Height above G L 2 59 mtr Depth below G L 90mtr Distance between 02 vertical pole in same row 1 80 mtr Distance between 02 vertical pole in adjacent row 11 00 mtr Total Nos of Pole 06 Nos in each Row & total 12 nos in both row Supporting material Each Vertical pole should be supported by 3 nos 40 x 40 x 4 mm MS Angle Inclined length for 02 nos long length has at least of 3 10 mtr & for 01 no short length support should be at least 1 80 mtr joined with 40x40x4 mm MS Angle Angle should be embedded in ground by 1 2 4 1 Cement 2 coarse sand 4 coarse aggregate 20 mm size position cement concrete Pole Foundation Pole should be embedded in ground by 1 2 4 1 Cement 2 coarse sand 4 coarse aggregate 20 mm size position cement concrete upto minimum depth of 0 90 meter with anchorage at bottom Finishing Iron work should be finished with enamel paint as required after application of metal primer to give an even & smooth shade as required Base specification Height above G L Brick base of dimension 10 50 x0 75 x0 75 mtr Height below G L Brick base of dimension 10 50 x0 75 x0 45 mtr Foundation 1 4 8 1 Cement 4 coarse sand 8 coarse aggregate 20 mm size position cement concrete below base 10 50 x0 75 x0 10 meter Finishing Outer surface of base above G L should be plaster with 15 mm thick 1 4 1 Cement 4 Fine sand & finished with exterior paint Finishing Enamel Paint on iron work & exterior paint on brick base color as required Rope specification Manila rope having circumference 102 mm Minimum length of main horizontal rope pully to pully is 11 00 mtr with end support length 2 55 mtr height 02 nos Vertical rope on each horizontal rope Total nos of vertical rope 2 x 6 12 nos Other requirement Pully system for rope on top of each pole Hook for rope support Ground should be clear & leveled Abbreviations G L Ground level dia diameter mtr Meter | 3 | nos | qmbtc | 30 | |
| 2 | HORIZONTAL ROPE 2nd type | Inclined Pole specification Inclined support 08 Nos MS Channel 5 x2 5 x6 mm having total 4 05 mtr minimum length & should be embedded in ground by 1 2 4 1 Cement 2 coarse sand 4 coarse aggregate 20 mm size position cement concrete Horizontal Pole specification Dia 100 mm Ms Round Pipe Medium Qty & Length Total 02Nos 3 05 mtr long on Top 01No for each side total 1 x 2 2 nos Distance between horizontal pole 11 00 mtr Finishing Iron work should be finished with enamel paint as required after application of metal primer to give an even & smooth shade as required Rope specification Manila rope having circumference 102mm Minimum length of rope is 18 00x2no 36mtr Other requirement Guest plate in both side of horizontal pole to support Welding & fitting accessories Ground should be clear & leveled Abbreviation G L Ground level dia diameter mtr Meter | 1 | nos | qmbtc | 30 | |
| 3 | VERTICAL ROPE CLUSTTER 28 rope set in a single vertical rope cluster 07 rope in each side | Size Outer size from pole to pole 6 40 x 6 40mtr Side & Roof accessories Opened from sides & covered on roof with 0 50mm thick 120gm zink coated PGI sheet roofing with self screw or j hook 500 600mm wide Ridge of plain sheet on top Roof should be extended at least 0 90mtr from vertical pole in each side with complete accessories 04Nos MS Channel 5 x2 5 x6mm top purlin on vertical pole as Tie beam in 04 sides MS Hollow pipe 3 x1 5 x5mm in top runner & truss part as per drawing Pole specification Diameter of vertical pole Minimum 5inch Height above G L of vertical pole 7 65mtr Depth below G L of vertical pole 0 90mtr Distance between 02 vertical pole in same row 6 40mtr Distance between 02 vertical pole in adjacent row 6 40mtr Total Nos of of vertical pole 02Nos in 01 Row & total 04nos in both rows Supporting material Each Vertical pole should be supported by 01no Medium 3inch dia MS round hollow pipe of minimum 6 50 mtr length It should be properly embedded in ground by 1 2 4 1Cement 2 coarse sand 4 coarse aggregate 20mm size Position cement concrete with anchorage at bottom Finishing Iron work should be finished with enamel paint as required after application of metal primer to give an even & smooth shade Rope specification Manila rope having circumference 102mm Minimum length of rope is 7 65mtr Total nos of vertical rope 7x4 28nos Other requirement Heavy duty hook for roop 07Nos in each side Total nos 7x4 28nos Ground should be clear & leveled Abbreviation G L Ground level dia diameter mtr Meter | 3 | nos | qmbtc | 30 | |
| 4 | HYPER EXTENSION 12mt length and 1 20mtr height Distance of two vertical pole 75mt and 17 nos of vertical pole and one 12 mt length horizontal pole in a single hyper extension set | HYPER EXTENSION Refer drawing 3 1 Size Length 12 00 mtr x height 1 20 mtr Thigh support specification Vertical pole Diameter 17 Nos of Minimum 65mm Diameter Height above G L 1 20mtr Depth below G L 0 60mtr Distance between 02 vertical pole in same row 0 75mtr Total Nos of Pole 17Nos in single row Supporting material 3 20mm thick Gusset plate size 0 25x0 25mtr on each pole Total 17x1 17nos Good quality Foam matt L 40feet xB 8 inch x h 2 inch with necessary required fittings complete Good quality Wooden plank 40feet xB 8 inch x h 2 inch with necessary required fittings complete Pole Foundation Pole should be embedded in ground by 1 2 4 1Cement 2 coarse sand 4 coarse aggregate 20mm size position cement concrete upto minimum depth of 0 90meter with anchorage at bottom Finishing Iron & wood work should be finished with enamel paint as required after application of primer to give an even & smooth shade as required Ankle support specification Vertical pole Diameter 09 Nos of Minimum 40mm Diameter Horizontal pole 02Nos 40mm dia Horizontal pole Height above G L 1st pole at 0 60mtr & 2nd pole at 0 90mtr Depth below G L 0 60mtr Distance between 02 vertical pole in same row 1 50mtr Total Nos of Pole 09Nos in single row Pole Foundation Pole should be embedded in ground by 1 2 4 1Cement 2 coarse sand 4 coarse aggregate 20mm size position cement concrete upto minimum depth of 0 60meter with anchorage at bottom Finishing Iron & wood work should be finished with enamel paint as required after application of primer to give an even & smooth shade as required Other requirement Welding & fitting accessories Ground should be clear & leveled Abbreviation G L Ground level dia diameter mtr Meter | 4 | nos | qmbtc | 30 | |
| 5 | WALL BAR 09mtr length and 5 33 mtr height Distance between two vertical pole 0 45 mt and 13 nos of vertical pole 17 nos of horizontal pole between two vertical pole | Wall Bar Refer drawing 4 1 Size Length 9 00 mtr x height 5 33 mtr Pole specification vertical pole 13 Nos MS Channel 100 x 50 x 6 mm 0 45 mtr Height above G L of vertical pole 4 43 mtr Depth below G L of vertical pole 0 90 mtr Total Nos of Pole 13 Nos in single Row Supporting material Vertical pole should be supported by MS Flat 100x6mm on top Pole Foundation Pole should be embedded in ground by 1 2 4 1Cement 2 coarse sand 4 coarse aggregate 20mm size position cement concrete upto minimum depth of 0 90meter with anchorage at bottom Finishing Iron work should be finished with enamel paint as required after application of metal primer to give an even & smooth shade as required Other requirement 17 nos 40mm round G I pipe with threaded end for socket & at 0 23mtr spacing Bottom 1st pipe at 0 30mtr Flat should be at a distance of 0 45mtr from last 40mm dia pole on top G I socket on each side of 40mm round G I pipe Total qty 17x2 34nos Hole for crossing of 40mm round G I pipe Welding & fitting accessories Ground should be clear & leveled Abbreviation G L Ground level dia diameter mtr Meter | 4 | nos | qmbtc | 30 | |
| 6 | CHIN UP BAR 06 30mtr length and 06 20mtr width total 25 nos of vertical pole in a single chin up bar | Size Length 6 20 mtr x width 6 20 x height 3 15 mtr Pole specification vertical pole 25 Nos G I Round medium pipe 50 mm Height above G L of vertical pole 3 15 mtr Depth below G L of vertical pole 0 75 mtr Total Nos of Pole 25 Nos Supporting material G I Round sheet 6 dia & 3 mm thick on each vertical pole Total 25x2 50nos Horizontal pole on top 30mm Medium Dia 25Nos G I Round Pipe 6 20mtr longPole Foundation Pole should be embedded in ground by 1 2 4 1Cement 2 coarse sand 4 coarse aggregate 20mm size position cement concrete up to minimum depth of 0 75meter with anchorage at bottom Finishing Iron work should be finished with enamel paint as required after application of metal primer to give an even & smooth shade as required Flooring size 7 35x7 35mtr 1 2 4 1Cement 2 coarse sand 4 coarse aggregate 20mm size Cement concrete flooring 0 125mtr thick Other requirement 02 Nos G I Round Pipe 30mm Medium 0 10mtr long support in 6 G I Round sheet Welding & fitting accessories Ground should be clear & leveled Abbreviation G L Ground level dia diameter mtr Meter | 3 | nos | qmbtc | 30 | |
| 7 | Coarse sand | coarse aggregate 20mm good quality in cu feet | 1,000 | cufeet | qmbtc | 30 | |
| 8 | Fine sand | COARSE SAND GOOD QUALITY | 100 | cufeet | qmbtc | 30 | |
| 9 | coarse aggregate 20mm good quality in cu feet | FINE SAND GOOD QUALITY | 200 | cufeet | qmbtc | 30 |
Discover companies most likely to bid on this tender
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about HARYANA tender market
The eligibility requirements include being a registered entity, demonstrating financial stability through past turnover figures, and providing experience documentation. Significant consideration is also given to MSME classification and any exemption requests must be supported with appropriate documentation.
The documents required from the seller include Experience Criteria, Bidder Turnover, and a Certificate as requested in the Technical Compliance (ATC). Additional documentation may be necessary if bidders seek exemptions from experience or turnover requirements.
Bidders must ensure registration through the prescribed electronic portal, following specific guidelines that facilitate the submission of documents in compliant formats. Full details are documented within the tender outline.
All documents are to be submitted electronically in indicated formats which commonly include PDF, JPEG, and Word documents. Specific guidelines on accepted formats will be included in the tender documentation.
The technical specifications include detailed configurations for horizontal and vertical rope clusters, hyper extensions, wall bars, chin-up bars, and required aggregates. Bidders must adhere to the specifications closely to ensure quality and performance standards are met.
Yes, all items must meet established quality standards, and adherence to these standards will be a critical part of the evaluation process. Bidders are responsible for ensuring their products comply with these specifications.
Bidders are required to comply with all national procurement standards and specific criteria outlined in the tender documentation, including relevant laws pertaining to safety and quality in manufacturing.
The EMD required for this tender is fixed at 300. Bidders must submit this deposit to demonstrate financial commitment and ensure their participation in the bidding process.
Following bid award, successful bidders are typically required to submit a performance guarantee. The specific amount and conditions will be outlined in the final agreement following evaluations.
Payment terms generally frame the structure of milestone payments, contingent upon successful delivery and acceptance of goods. Detailed expectations will be defined in the contractual agreement post-evaluation.
Price evaluation will consider the total cost of ownership, including unit pricing, compliance, and delivery timelines, to ensure the best value proposition is secured for the Central Armed Police Forces.
All submissions must be made electronically through the designated tender platform, ensuring adherence to the defined submission guidelines.
The specific timelines will be outlined in the tender documentation provided at the initial notice. Bidders should maintain readiness to comply with shifting timelines as necessitated by the bidding process.
Benefits for Micro, Small, and Medium Enterprises (MSEs) include reduced eligibility criteria and preferential treatment in the evaluation process, recognizing their potential for innovation and value creation in government procurement.
Startups may also avail of provisions that support their participation in government tenders, enhancing access to procurement opportunities tailored to their capabilities.
Compliance with policies such as 'Make in India' fosters local content and procurement rules. Bidders are encouraged to highlight their alignment with such initiatives in their proposals.
Goa Shipyard Limited
📍 SOUTH GOA, GOA
Indian Navy
Indian Navy
📍 MUMBAI, MAHARASHTRA
Indian Army
📍 SONITPUR, ASSAM
Directorate Of Horticulture,kashmir
📍 ANANTHNAG, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS