TenderDekho Logo
GEM

Rural Development Department Bihar Drinking Water ATM Tender 2026 Version 2 with IS/RO Standards

Bid Publish Date

30-Jan-2026, 12:39 pm

Bid End Date

09-Feb-2026, 1:00 pm

Progress

Issue30-Jan-2026, 12:39 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Single Packet Bid

Key Highlights

  • Water ATM Version 2 with IS/RO based purification chain and chiller included
  • Payment acceptance: Coin, Card, RFID/NFC, Mobile Wallet
  • In-built chiller with 15°C output and specified tank capacities
  • UV disinfection, CIP, pH/Anti-scaling dosing, and multi-stage filtration
  • Enclosure: MS frame, anti-skid flooring, grills/mesh protection
  • On-site installation, commissioning, training included; NABL/ILAC test reports on demand
  • Option clause allows ±25% quantity variation at contracted rates
  • Warranty: storage tanks, electrical motors, filters, and system as specified

Tender Overview

Rural Development Department Bihar invites bids for a Drinking Water ATM / Water Vending Machine (Version 2) to serve water dispensing points across designated sites in Bihar, India. The order scope centers on a comprehensive Water ATM system with coin, card, RFID/NFC, and mobile wallet payment acceptance, and a purification train capable of delivering treated water at a controlled flow rate. Key differentiators include an in-built chiller delivering water at approximately 15°C, a multi-stage filtration train, UV disinfection, and full on-site installation, commissioning, and training. The tender emphasizes a robust enclosure, front-end display capabilities showing water purity metrics, and loT-ready monitoring, with a strong focus on water quality transparency and user payment options.

Technical Specifications & Requirements

  • Water purification capacity (LPH), water source details, and outlet water quality metrics.
  • Payment acceptance: Coin, Card, RFID/NFC, Mobile Wallet integration.
  • In-built chiller unit for 15°C water; chiller tank capacity and material details required.
  • Filtration: Multi Media Filter Vessels, RO membrane system with anti-scalant dosing pump, pH correction dosing, and high/low pressure protection.
  • Display: Touch Screen, Backlit, showing TDS, pH, temperature and water purity parameters.
  • Enclosure: MS frame, anti-skid surrounding tiles, litter space, and enclosure protection with grills/mesh.
  • Certificates and tests: central govt / NABL / ILAC lab test reports on demand; installation, trial run, and training included.

Terms, Conditions & Eligibility

  • Delivery terms subject to option clause allowing ±25% quantity variation and potential rate-locked pricing.
  • Warranty provisions cover storage tanks, electrical motors, filters, and overall system for specified periods.
  • On-site installation, commissioning, and user training included in scope; test reports to be furnished on demand.
  • EMD amount and exact statutory terms to be aligned with tender documents; standard procurement terms apply.
  • Accessibility for maintenance, spare parts, and warranty support across Bihar sites.
  • Compliance with stated standards, test certificates, and OEM authorizations required for bidders.

Key Specifications

  • Water purification capacity (LPH) and method (RO + UV) with anti-scalant dosing

  • Payment acceptance modes: Coin, Card, RFID/NFC, Mobile Wallet

  • Chiller: in-built, 15°C output, chiller tank capacity and material

  • Display: Touch Screen, Backlit, showing TDS, pH, temperature

  • Enclosure: MS frame, anti-skid tiles, grill/mesh protection, litter space

  • Test reports: NABL/ILAC lab conformity; warranty and commissioning

Terms & Conditions

  • EMD amount and payment terms to be disclosed in tender documents

  • Delivery window and option clause allowing ±25% quantity variation

  • Warranty periods for storage tanks, motors, filters, and overall system

  • On-site installation, commissioning, and training included

  • Submission of OEM authorizations and test reports on demand

Important Clauses

Payment Terms

Standard procurement terms; EMD as specified; contract payments per delivery milestones

Delivery Schedule

Delivery period and option clause permitting up to 25% quantity variation at contracted rates

Penalties/Liquidated Damages

LD provisions to be specified in contract; ensure timely delivery and performance milestones

Bidder Eligibility

  • Experience in supplying water purification ATM/water vending systems

  • Demonstrated ability to install and commission complete water treatment enclosures

  • Financial capability to support project roll-out in Bihar, with corroborating statements

Documents 3

GeM-Bidding-8906810.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - SUBSTATION; Switch

Uttar Pradesh Power Corporation Limited (uppcl)

MUZAFFARNAGAR, UTTAR PRADESH

Posted: 20 January 2026
Closed: 5 February 2026
GEM

Rural Development Department Bihar Drinking Water ATM Tender 2026 East Champaran - ISI/AAA/TRTL/RO+UV Water Vending 2026

Rural Development Department

EAST CHAMPARAN, BIHAR

Posted: 25 January 2026
Closed: 5 February 2026
GEM

Professional Training Services (Version 2) - online; Weekdays

Indian Army

EAST SIKKIM, SIKKIM

Posted: 22 January 2026
Closed: 4 February 2026
GEM

Hqids Department of Military Affairs Magnetic Lock Repair Tender 2026 for Shoe Rack & Cupboards - Service Provider

Hqids

SOUTH ANDAMAN, ANDAMAN & NICOBAR

Posted: 1 February 2026
Closed: 4 February 2026
GEM

Indian Navy Repair, Maintenance & Installation Tender Goa 2026 for 04 Ton Tower AC and Window Roller Shade - Prebid Goa 2026

Indian Navy

SOUTH GOA, GOA

Posted: 1 February 2026
Closed: 4 February 2026
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Coin / Card Acceptor / Quantity of Dispensing Water Number of Dispensing points 1, 2, 3, 4, 5, 6 Or higher
Coin / Card Acceptor / Quantity of Dispensing Water Water Dispensing using coin acceptor Yes, No
Coin / Card Acceptor / Quantity of Dispensing Water Coins accepted for payment Re.1, Rs. 2, Rs. 5, Rs.10, Rs. 20, NA
Coin / Card Acceptor / Quantity of Dispensing Water Water Dispensing using RFID/NFC card Yes, No
Coin / Card Acceptor / Quantity of Dispensing Water Mobile Wallet accepted for payment Yes, No
CAPACITY / TYPE / WATER SOURCE / OUTLET WATER QUALITY Purification Capacity of Water ATM (LPH) 20, 50, 100, 150, 200, 250, 300, 500, 1000, 2000 Or higher
CAPACITY / TYPE / WATER SOURCE / OUTLET WATER QUALITY Type of Operation Manual, Semi-Automatic, Automatic with Multi-Processor Integrated Control System and remotely conrolled web based Server system Or higher
CAPACITY / TYPE / WATER SOURCE / OUTLET WATER QUALITY Water Source Municipal Tap water, Surface Water, Borewell Water
TECHNOLOGY Technology Reverse Osmosis (RO), Ultra Filtration (UF), UF+RO, Nano Filtration (NF), CDI
TECHNOLOGY Anti scalant dosing pump Yes, No
TECHNOLOGY pH Correction Dosing Pump Yes, No
CONSTRUCTIONAL Raw water Storage capacity (Indicate '0' for direct connection to continuous Tap Water source) 0, 100, 200, 500, 1000, 2000, 3000, 5000, 8000, 10000 Or higher
CONSTRUCTIONAL Raw water Storage Tank Material of Construction Concrete, Mild Steel, Stainless Steel, FRP, HDPE, Poly Propylene (PP)
CONSTRUCTIONAL Location of the Raw Water Storage Tank Inside the ATM Enclosure, Under Ground, NA for Tap Water, Outside the ATM Enclosure
CONSTRUCTIONAL Treated water Storage capacity 10-20, 21-50, 51-100, 101-150, 151-200, 201-250, 251-300, 301-350, 351-400, 401-500, 501-600, 601-700, 701-800, 801-1000 Or higher
CONSTRUCTIONAL Treated water Storage Tank Material of Construction Stainless Steel 316 Gr, Stainless Steel 304 Gr, HDPE, PP Or higher
CONSTRUCTIONAL Equipped with an in-built chiller unit for providing continuous cold water of temperature around 15 degree Celcius Yes, No
CONSTRUCTIONAL In-built Chiller Tank Capacity (Liter) 10-20, 21-50, 51-100, 101-150, 151-200, 201-250, 251-300, 301-350, 351-400, 401-500, 501-600, 601-700, 701-800, 801-1000, NA Or higher
CONSTRUCTIONAL Chiller Tank Material of Construction Stainless Steel 316 Gr, Stainless Steel 304 Gr, NA Or higher
CONSTRUCTIONAL Number of Filtration steps 5, 7, 9
CONSTRUCTIONAL Provided with suitable vending place for filling container of 20 liters capacity Yes, No
DISPLAY Display of water purity parameters Yes, No
DISPLAY Display Type LED, LCD, TFT, NA Or higher
DISPLAY Backlit Display Yes, No
DISPLAY Touch Screen Display Yes, No
DISPLAY Display Size (Characters x Lines) 4 x 2 (4 Ch x 2 lines), 8 x 2 (8 Ch x 2 lines), 16 x 2 (16 Ch x 2 lines), 20 x 2 (20 Ch x 2 lines), 7" Tablet, NA
DISPLAY Display of oulet water TDS level Yes, No
DISPLAY Display of outlet water pH level Yes, No
DISPLAY Display of outlet water Temperature Yes, No
Inlet / Feed Pump to feed water from raw water storage tank to filter Inlet / Feed Pump Type Horizontal Centrifugal, Vertical Centrifugal, NA for Tap water
Inlet / Feed Pump to feed water from raw water storage tank to filter Number of Inlet / Feed Pumps 1, 2, NA
Multi Media Filter Vessels for First stage filtration for suspended particles Material Of Construction for Multi Media Filter Vessels FRP, Steel, PP Or higher
Multi Media Filter Vessels for First stage filtration for suspended particles Number of Multi Media Filter Vessels 2, 1 Or higher
Multi-Port Valve to control filtration and backwash for media filter having sand & carbon Type of Multi-Port Valve Manual, Automatic, NA
Multi-Port Valve to control filtration and backwash for media filter having sand & carbon Multi-Port Valve Material of Construction ABS, PP, NA
Multi-Port Valve to control filtration and backwash for media filter having sand & carbon Number of Multi-Port Valves 1, 2, NA
Anti scalent Dosing Pump to inhibit scaling of hardness salt and silica on RO Membranes, doze pH and Cl as per water quality Type of Anti scalent Dosing Pump Electronic diaphragm, NA
Anti scalent Dosing Pump to inhibit scaling of hardness salt and silica on RO Membranes, doze pH and Cl as per water quality Material Of Construction for Anti scalent Dosing Pump PP, ABS, NA
Anti scalent Dosing Pump to inhibit scaling of hardness salt and silica on RO Membranes, doze pH and Cl as per water quality Number of Anti scalent Dosing Pumps 1, 2, NA
pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals Type of pH Correction Pump Electronic diaphragm, NA
pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals Material Of Construction for pH Correction Dosing Pump PP, ABS, NA
pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals Number of pH Correction Dosing Pumps 1, 2, 3, NA
pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals Dosing Tank Material of Construction LLDPE, HDPE, NA
High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes Type of High Pressure Pump Vertical Centrifugal Pump, NA
High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes Material Of Construction for High Pressure Pump PP, SS, NA
High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes Number of High Pressure Pumps 1, 2, 3, NA Or higher
High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes Low pressure switch for Protection of HP pump from burn-out Yes, NA
RO Pressure Vessel Type of RO Pressure Vessel Membrane housing mounted on skid - End port type, NA
RO Pressure Vessel Material Of Construction for RO Pressure Vessel FRP, SS, NA
RO Pressure Vessel Number of RO Pressure Vessels 1, 2, 3, 4, NA Or higher
Ultra Violet (UV) System to disinfect water, kill bacteria and micro-organisms Material Of Construction for UV System SS, ABS, NA
Ultra Violet (UV) System to disinfect water, kill bacteria and micro-organisms Number of UV Systems 1, 2, NA Or higher
Ultra Violet (UV) System to disinfect water, kill bacteria and micro-organisms Number of UV Lights 1, 2, 3, 4, 5, 6, NA Or higher
Ultra Violet (UV) System to disinfect water, kill bacteria and micro-organisms Total UV Power 12 Watts, 16 Watts, 48 Watts, NA
CIP (Clean-In-Place)Tank to mix / Dilute chemicals for membrane cleaning and permeate back wash CIP Tank Yes, No
CIP (Clean-In-Place)Tank to mix / Dilute chemicals for membrane cleaning and permeate back wash CIP Tank Material of Construction HDPE, FRP, LLDPE, NA
CIP (Clean-In-Place)Tank to mix / Dilute chemicals for membrane cleaning and permeate back wash Number of CIP Tanks 1, 2, NA Or higher
Power Source Power Source AC Power Supply, AC & DC (for dispensing only) Power Supply
Power Source Power Supply 230 ±10 V AC, 415 ±10 V AC
Power Source Battery back-up time (Hours) 6, 8, 10, 12, 14, 16, 18, 20, 22, 24 Or higher
Water ATM - Enclosure Structure Rigid structure made of MS frame, Rigid structure made of SS frame(3),, Rigid structure made of G.I. frame Or higher
Water ATM - Enclosure Thickness of the frame of structure (mm) 2.5, 2 Or higher
Water ATM - Enclosure Material of Construction of Side Panels of Water ATM Stainless Steel Sheet, Galvanized Steel Sheet Or higher
Water ATM - Enclosure Side Panel Sheet Thickness (mm) 0.6, 0.8, 1, 1.2 Or higher
Water ATM - Enclosure PUF insulation of Side Panels of Water ATM With, Without Or higher
Water ATM - Enclosure PUF insulation of the door of Water ATM With, Without Or higher
Water ATM - Enclosure Provision for in-built litter space Yes, No
Water ATM - Enclosure Covered area of treatment plant enclosure (Square Foot) 2-5, 5.1-10, 10.1-15, 15.1-20, 20.1-30, 30.1-40, 40.1-50, 50.1-60, 60.1-70, 70.1-80, 80.1-90, 90.1-100, 100.1-110, 110.1-120 Or higher
Water ATM - Enclosure Shape of the Water ATM housing Cubical, Cuboidal, Hexagonal, Cylindrical
Water ATM - Enclosure Top Canopy of the Water ATM housing Flat, Sloped, Dome
Water ATM - Enclosure Headroom for the Water ATM enclosure (Foot) 7.1-8.0, 8.1-9.0, 9.1-10.0 Or higher
Water ATM - Enclosure Floor area around the Water ATM enclosure covered with anti-skid tiles Yes, No
Water ATM - Enclosure Water ATM enclosure protected with enclosed MS grill / mesh Yes, No
Installation & Commissioning / Warranty Trial Run and Training provided (inclusive in the Scope of Supply) (Days) 5, 10 Or higher
Installation & Commissioning / Warranty Warranty for storage Tanks (Year) 1, 2, 3, 4, 5 Or higher
Installation & Commissioning / Warranty Warranty for electrical motors (Year) 1, 2, 3 Or higher
Installation & Commissioning / Warranty Warranty for the filters (Year) 1, 2, 3 Or higher
Installation & Commissioning / Warranty Warranty for the system (Year) 1, 2, 3 Or higher
Test Reports Availability of Test Report from Central Govt /NABL/ILAC accredited lab to prove confirmity to specification Yes, No
Test Reports All the test reports and certificates shall furnish by the supplier to the buyer/consignee on demand Yes, No

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card copy

3

Experience certificates for similar Water ATM / vending projects

4

Audited financial statements for the last 2-3 years

5

EMD submission document (amount as specified in terms) and payment details

6

Technical bid documents including OEM authorizations (if applicable)

7

Test reports/certifications from Central Govt / NABL / ILAC accredited labs

8

Delivery and installation capability statements

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for the Bihar water ATM tender 2026?

Bidders must submit GST, PAN, experience certificates, financials, EMD, OEM authorizations, and NABL/ILAC test reports. Ensure compliance with coin/card/RFID payments, RO+UV treatment, 15°C chiller, and on-site installation. Prepare technical bid with detailed BOQ, enclosure specs, and warranty terms.

What documents are required for the drinking water ATM procurement in Bihar?

Required documents include GST registration, PAN, audited financial statements, prior project experience in water ATM systems, EMD receipt, OEM authorization (if applicable), and product test certificates from NABL/ILAC labs. Submit installation capability proof and maintenance plan for Bihar rollout.

What are the essential technical specifications for the water ATM Version 2?

Key specs include RO-based purification with anti-scalant dosing, UV disinfection, multi-media filtration, 15°C chiller, touch screen display showing TDS/pH/temperature, MS enclosure, and dual power backups. Payment acceptance spans Coin/Card/RFID/Mobile Wallet; installation and training included.

What is the expected delivery and installation timeline in Bihar?

Delivery terms allow up to 25% quantity variation; final delivery schedule follows contract milestones. On-site installation and trial run are included, with training for operators. Specific dates will be clarified in the purchase order and delivery plan.

What are the warranty requirements for the water ATM system in this tender?

Warranty covers storage tanks, electrical motors, and filters, with overall system warranty specified in contract. Exact warranty durations to be confirmed in the terms, typically 1–5 years for major components; ensure service support across Bihar.

Which standards and test reports are required for compliance?

Bidders must provide NABL/ILAC accredited lab test reports showing conformity to water quality and safety standards. Central government test reports must be available on demand; OEM authorizations and compliance with IS/RO/UV specifications should be demonstrated.

What payment methods must the water ATM support in this procurement?

Tenders require acceptance of Coin, Card, RFID/NFC, and Mobile Wallet payments. The bidder should confirm integration with existing payment gateways, ensure secure transaction handling, and provide maintenance for payment module in Bihar installations.

What installation and training process is included in the Bihar tender?

The scope includes on-site installation, commissioning, and operator training. Trial run is included in the scope of supply. The bidder must provide a detailed training plan, manuals, and post-installation support across Bihar.

Similar Tenders

5 found

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - 2264336; Substatio

Uttar Pradesh Power Corporation Limited (uppcl)

📍 BANDA, UTTAR PRADESH

EMD: ₹23,000
Est: ₹22.6 L
⏰ Deadline: 2 months left
🛒 Type: Service
View GEM

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - 2509196; Substatio

Uttar Pradesh Power Corporation Limited (uppcl)

📍 BANDA, UTTAR PRADESH

EMD: ₹26,000
Est: ₹25.1 L
⏰ Deadline: 2 months left
🛒 Type: Service
View GEM

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - 2262193; Substatio

Uttar Pradesh Power Corporation Limited (uppcl)

📍 BANDA, UTTAR PRADESH

EMD: ₹23,000
Est: ₹22.6 L
⏰ Deadline: 2 months left
🛒 Type: Service
View GEM

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - 1980904; Substatio

Uttar Pradesh Power Corporation Limited (uppcl)

📍 BANDA, UTTAR PRADESH

EMD: ₹20,000
Est: ₹19.8 L
⏰ Deadline: 2 months left
🛒 Type: Service
View GEM

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - 2593003; Substatio

Uttar Pradesh Power Corporation Limited (uppcl)

📍 BANDA, UTTAR PRADESH

EMD: ₹26,000
Est: ₹25.9 L
⏰ Deadline: 2 months left
🛒 Type: Service
View GEM