TenderDekho Logo
Active GEM

Delhi Home Department Wire Rope Slings Tender West Delhi 110008 IS 2762 (V3) Certified 2026

Bid Publish Date

02-Oct-2026, 2:19 pm

Bid End Date

26-Oct-2026, 2:00 pm

Progress

Issue02-Oct-2026, 2:19 pm
AwardPending

Key Highlights

  • • IS 2762 conformance required for V3 wire rope slings
  • • ATC documents contain final specification and any special clauses
  • • Safety and insurance requirements including workmen compensation and PPE
  • • Scope limited to supply of goods; no installation services

Tender Overview

The opportunity concerns the supply of Wire rope slings and sling legs (V3) conforming to IS 2762 for the Home Department Delhi, located in West Delhi, 110008. The procurement is a goods supply contract with no BOQ items published, indicating a potentially bespoke quantity scope. The bid emphasizes safety, with required compliance to workmen compensation, insurance, public liability, and PPE usage for operations in high-voltage environments. The scope explicitly states the bid price should include all cost components, and the client references a final specification in its ATC documents. Bidders should prepare to meet equipment compliance and safety standards relevant to high-risk handling in public sector settings.

Technical Specifications & Requirements

  • Category: Wire rope slings and sling legs (V3)
  • Standard/Conformance: IS 2762 (V3)
  • Key location: West Delhi, Delhi 110008
  • Product context: Supply-only of the listed goods; no installation implied
  • Quality & safety: Provisions for workmen compensation, insurance, public liability, property damage, and PPE adherence for Extra High Voltage environments
  • ATC/Final specification: The ATC document forms the final specification for tender compliance
  • Brand/OEM constraints: Not explicitly stated; follow IS 2762 V3 and buyer ATC requirements
  • Delivery/uptake considerations: Not specified in tender data; refer to ATC for final scope details

Terms, Conditions & Eligibility

  • Scope: Only supply of goods (no installation services)
  • Safety compliance: Mandatory safety, PPE, and high-voltage work procedures
  • EMD/Financials: Not disclosed in the available data; bidder must review ATC for exact amounts
  • Documents: Ensure submission of standard bid documents per ATC and IS 2762 conformance
  • ATC finalization: Read the ATC document as the definitive specification
  • Warranty/Support: Not specified in the current data; check ATC terms

Key Specifications

  • Product: Wire rope slings and sling legs

  • Standard: IS 2762 (V3)

  • Category: V3 slings

  • Location: West Delhi, Delhi 110008

  • Scope: Supply of Goods only

  • Safety: Workmen compensation, PPE, insurance, public liability

Terms & Conditions

  • EMD amount not disclosed in data; verify in ATC

  • Final specification lies in Buyer ATC document

  • Delivery terms: not specified; refer ATC for timeline

Important Clauses

Payment Terms

Not specified in the provided data; check ATC for advance/milestone terms

Delivery Schedule

Delivery timeline to be defined in ATC; bidder must align with West Delhi location requirements

Penalties/Liquidated Damages

Not disclosed in current data; ATC may specify LD for delays or non-conformance

Bidder Eligibility

  • Experience in supplying IS 2762 conforming sling products

  • Financial capability demonstrated by audited statements

  • Ability to comply with PPE and EHV safety provisions

Advertisement

Tender Data

Bid Details

Quantity

70

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

OEM Avg. Turnover

1

Past Performance

30 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Wire rope slings and sling legs (V3) conforming to IS 2762 (Q3)

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

14

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

West

Delivery Pincodes

110015

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sachin Rana110015,Delhi Fire Service, Head Quarters, Connaught PlaceWestDelhi1100157090-

Authority Records

HOME DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9978125.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

Workshop, Headquarters

Grievance Contact

[email protected]

Categories 7

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates showing similar supply of wire rope slings

4

Financial statements (last 2-3 years)

5

EMD/Security deposit documents (as per ATC)

6

Technical bid documents demonstrating IS 2762 (V3) conformity

7

OEM authorizations or dealership certificates (if applicable)

Frequently Asked Questions

Key insights about DELHI tender market

What documents are required for IS 2762 sling tender in Delhi 2026?

Bidders must submit GST certificate, PAN, experience certificates for similar supply, financial statements, EMD documents, technical compliance certificates, and OEM authorizations as per ATC. Ensure IS 2762 (V3) conformity evidence and PPE/safety compliance filings are included. Review ATC for any additional bid-specific documents.

How to bid for IS 2762 V3 wire rope slings in West Delhi?

Register with the issuing authority, obtain the ATC final specification, and prepare a goods-supply bid with IS 2762 (V3) compliance. Include EMD submission details, supplier qualifications, and safety documentation. Ensure delivery to West Delhi 110008 and align with PPE and high-voltage safety requirements.

What is the eligibility criteria for Delhi sling procurement 2026?

Eligibility requires prior supply of IS 2762 compliant slings, demonstrable financial stability, GST registration, PAN, and relevant OEM authorizations if applicable. Bidders must show capacity to meet workmen compensation and public liability insurance requirements specified in ATC.

What standards are required for sling products in this tender?

Products must conform to IS 2762 with V3 classification as per the tender's ATC. The final specification is contained in the ATC document, which must be read as the binding technical requirement for compliance and testing.

When is the delivery deadline for West Delhi sling supply?

The exact delivery schedule is defined in the ATC final specification. Bidders should prepare to coordinate with West Delhi 110008 logistics and ensure PPE and EHV safety protocols are in place from order date onward.

What is the payment term for Delhi sling procurement?

Payment terms are specified in the ATC; bidders should anticipate typical public sector terms (possible milestone or post-delivery payment). Ensure all invoicing aligns with delivery verification and compliance documentation required by the Home Department.

How to verify ATC final specifications for IS 2762 slings?

Access the ATC document linked to the tender to verify final IS 2762 (V3) requirements, any OEM constraints, safety mandates, and any unique clauses. Ensure your bid aligns exactly with the ATC's final specification before submission.

Advertisement