Bid Publish Date
19-Sep-2026, 5:40 pm
Bid End Date
29-Sep-2026, 6:00 pm
Location
Progress
The Iisco Steel Plant of Steel Authority of India Limited (SAIL-ISP) seeks procurement of a Monkey Repellent Kit for delivery at Bardhaman, West Bengal 713101. The scope is limited to supply of goods with no BOQ items listed. Prospective bidders should prepare to comply with GST requirements and vendor-code processes, including PAN, GSTIN, cancelled cheque, and EFT mandate. The procurement emphasizes post-receipt inspection by SAIL-ISP and GST invoice verification in the GeM portal. Clarity on estimated value or EMD is not provided, signaling a potentially small- to mid-scale supply. Bidders should verify ATC terms and ensure readiness for on-site inspection where applicable. This tender reflects a standard supply contract within SAIL-ISP’s security-related or operational consumable category, with a focus on timely delivery and proper documentation. Unique aspects include GST-based reimbursement and specified inspection at consignee site. The lack of BOQ items suggests a generic scope aligned to a specific product category rather than a multi-line tender. The procurement approach is straightforward for suppliers with ready Monkey Repellent Kit stock and established GST compliance. Keywords: tender in Bardhaman, SBI procurement family alignment, ISI/AAA-trTL brand alignment not explicit, supply contract in West Bengal, 2026 window.
Monkey Repellent Kit
Location: Bardhaman, West Bengal
Scope: Supply of Goods only
Inspection: Post Receipt Inspection by SAIL-ISP
GST handling: Reimbursement as actuals or as per applicable rates (whichever lower), subject to quoted GST
GST registration active
PAN card available
Financial capability to supply goods without installation
Ability to comply with GeM invoice/upload requirements
Quantity
6
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Monkey Repellent Kit (Q3)
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Paschim Bardhaman
Delivery Pincodes
713325
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sanjoy Kumar Maji | 713325,Materials Management Dept. IISCO Steel Plant Burnpur | Paschim Bardhaman | West Bengal | 713325 | 6 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
PAN Card
GSTIN
Cancelled Cheque
EFT Mandate (certified by Bank)
Key insights about WEST BENGAL tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT Mandate; upload GST invoice and GST portal payment confirmation on GeM; comply with post-receipt inspection by SAIL-ISP; ensure supply-only scope and GST treatment as actuals or lower rate. Confirm ATC terms and ensure timely delivery.
Required documents include PAN Card, GSTIN, cancelled cheque, and EFT Mandate certified by bank. Ensure GST registration is active, and prepare GST invoice documentation for GeM portal submission; these are conditional for bidder code creation and bid submission.
Delivery terms are not explicitly stated; bidders should confirm delivery timelines in ATC. Payment terms are not detailed; GST invoice submission is required via GeM; GST reimbursement follows actuals or applicable rates up to the quoted percentage, subject to terms.
Post Receipt Inspection is conducted at the consignee site by SAIL-ISP; no pre-dispatch inspection is indicated in ATC. Ensure ready stock and documentation to pass on-site verification; provide quality certificates if requested during acceptance.
The tender is issued by Iisco Steel Plant, a unit of Steel Authority of India Limited (SAIL-ISP), for supply of Monkey Repellent Kit in Bardhaman, West Bengal 713101; it follows GeM portal submission with certificate uploads.
No explicit standards or brand requirements are stated in the provided ATC; bidders should verify if ATC imposes brand or specification constraints and ensure kit meets general safety and quality norms for security equipment.