TenderDekho Logo
GEM

Tender Notice for 1 A Copper Bus Bar Size 1 X 1by8 With insulated by PVC color markings kindly refer the attach ment in DINDIGUL, TAMIL NADU

Bid Publish Date

30-Apr-2026, 1:11 pm

Bid End Date

21-May-2026, 2:00 pm

Value

₹3,00,000

Progress

Issue30-Apr-2026, 1:11 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

174

Category

1 A Copper Bus Bar Size 1 X 1by8 With insulated by PVC color markings kindly refer the attach ment file

Bid Type

Single Packet Bid

Categories 100

Public procurement opportunity for Gandhigram Rural Institute Deemed To Be University 1 A Copper Bus Bar Size 1 X 1by8 With insulated by PVC color markings kindly refer the attach ment in DINDIGUL, TAMIL NADU. Quantity: 174 issued by. Submission Deadline: 21-05-2026 14: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF EDUCATIONHIGHER EDUCATION DEPARTMENT
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9275045.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Air Force COPPER BUSBAR procurement 1570x750x10MM for Military Aircraft - ISI/IS standards 2025

Indian Air Force

Posted: 5 December 2025
Closed: 15 December 2025
GEM

COPPER BUSBAR FOR ELECTRICAL PURPOSE OF SIZE: 280 MM (W) x 6 MM (T) x 3000 MM (L) . CONFORMING TO I

Yantra India Limited

Posted: 20 January 2025
Closed: 4 February 2025
GEM

Contract Bidding Open For SUPPLY OF COPPER BUS BAR ASSEMBLY in BENGALURU URBAN, KARNATAKA

N/A

BENGALURU URBAN, KARNATAKA

Posted: 14 August 2025
Closed: 22 August 2025
EPROCURE

Electrolytic Tough Pitched Copper Flat Bus bars 3500 mm L X 100 mm W X 10 mm T (See specifictions)

Central Power Research Institute (cpri) Bangalore Karnataka

Posted: 27 September 2024
Closed: 16 December 2024
GEM

Tin Plated Copper Bus Bar 100mmx3mmx25 mm with M6 tap holes,Tin Plated Copper Bus Bar 240mmx3mmx25m

Iti Limited

BANGALORE, KARNATAKA

Posted: 14 June 2025
Closed: 5 July 2025
GEM

Bill of Quantities (BOQ) 174 Items Sign in for GEM prices

#1

1 A Copper Bus Bar Size 1 X 1by8 With insulated by PVC color markings kindly refer the attach ment file

As per the specification by the Quotation

1 job Delivery: 15 days
#2

2 Aluminum Bus Bar Size 1 X 1by8 With insulated by PVC color markings Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#3

3.Bus bar Insulator - SM 35 Include with Bolt nut Vassar and fixing charge Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#4

4 L 250 x W 150 x Thickness 2 point 5 mm Hylam Sheet Fabric base mechanical grade Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#5

5 The panel board overall made by 18 Gauge metal sheets only Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#6

6 Trench Excavation or digging and refilling charges Only Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#7

7 Trench refilling charges Only Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#8

8 Cable Laying Charges Only Size up to 35 Sqmm Refer description of work Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#9

9 Sand Cushioning the cable protective covering with bricks and Refilling the trench as required Up to 35 Sqmm refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#10

10 Cable Laying Charges Only Size from 35 Sqmm to 95 Sqmm Refer description of work

As per the specification by the Quotation

1 job Delivery: 15 days
#11

11Sand Cushioning the cable protective covering and Refilling the trench From 35 to 95 Sqmm please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#12

12 Cable Laying Charges Only Size From 95 Sq.mm to 185 Sq.mm please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#13

13 Sand Cushioning the cable protective covering and Refilling the trench From 95 Sq.mm to 185 Sq.mm please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#14

14 Cable Laying Charges Only From 185 Sq.mm to 400 Sq.mm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#15

15 Sand Cushioning the cable protective covering and Refilling the trench.From 185 Sq.mm to 400 Sq.mm please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#16

16 UG Cable laying Work. up to 35 sq mm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#17

17 UG Cable laying Work 35 sqmm to 95 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#18

18 UG Cable laying Work 95 sqmm to 185 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#19

19 UG Cable laying Work 185 sqmm to 400 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#20

20 End Termination Charges 3and half X Up to 16 sq. mm Each or Below Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#21

21 End Termination Charges 3and half X 25 sq. mm 28mm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#22

22 End Termination Charges 3 and half X 35 sq mm 32mm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#23

23 End Termination Charges 3 and half X 50 sq mm 35 mm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#24

24 End Termination Charges 3and half X 70 sqmm 38mm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#25

25 End Termination Charges 3 and half X 95 sqmm 45 mm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#26

26 End Termination Charges 3 and half X 120 sqmm 45 mm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#27

27 End Termination Charges 3and half X 150 sqmm 50 mm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#28

28.End Termination Charges 3 and half X 185 sq. mm 57mm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#29

29 End Termination Charges 3 and half X 225 sqmm 62mm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#30

30 End Termination Charges 3 and half X 240 sqmm 62mm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#31

31 End Termination Charges 3and half X 300 sq. mm 70 mm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#32

32 End Termination Charges 3and half X 400 sqmm 82mm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#33

33UG Cable Joining Work labor charges only 3 and half X 25 sqmm Each or below Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#34

34 UG Cable Joining Work labor charges only 3 and half X 35 sqmm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#35

35 UG Cable Joining Work labor charges only 3and half X 50 sqmm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#36

36 UG Cable Joining Work labor charges only 3 and half X 70 sqmm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#37

37 UG Cable Joining Work labor charges only 3and half X 95 sqmm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#38

38 UG Cable Joining Work labor charges only 3and half X 120 sqmm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#39

39 UG Cable Joining Work labor charges only 3and half X 150 sqmm Each Refer description of work

As per the specification by the Quotation

1 job Delivery: 15 days
#40

40 UG Cable Joining Work labor charges only 3 and half X 185 sqmm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#41

41 UG Cable Joining Work labor charges only 3 and half X 225 sqmm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#42

42 UG Cable Joining Work labor charges only 3 and half X 240 sqmm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#43

43 UG Cable Joining Work labor charges only 3 and Half X 300 sqmm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#44

44 UG Cable Joining Work labor charges only 3and half X 400 sqmm Each Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#45

45 RCC Cable Root Marker H 24 inchX W 8 inch X Thickness 4 inch

As per the specification by the Quotation

1 job Delivery: 15 days
#46

46 RCC Pipes for Road crossing 1feet Dia X 6 inch Length

As per the specification by the Quotation

1 job Delivery: 15 days
#47

47 RCC Pipes for Road crossing Half inch Dia X 6 feet Length

As per the specification by the Quotation

1 job Delivery: 15 days
#48

48 RCC Pipes for Road crossing 9 inch Dia X 6 feet Length

As per the specification by the Quotation

1 job Delivery: 15 days
#49

49 UG Cable EB Service related Work Up to 16 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#50

50 UG Cable EB Service related Work Above 16 to up to 35 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#51

51 UG Cable EB Service related Work Above 35 Sqmm up to 95 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#52

52 UG Cable EB Service related Work Above 95 Sqmm up to 185 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#53

53 HIMAST 12 MTR Light pole Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#54

54 OpenWiring for light point fan point exhaust fan point call bell point Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#55

55.Concealed Wiring for light point fan point exhaust fan point call bell point Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#56

56.Wiring for twin control light point with Open Wiring Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#57

57 Wiring for twin control light point Concealed Wiring Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#58

58 Wiring for light or power plug Open wiring with 2 X 4or 6or 10 sq. mm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#59

59 Wiring for light or power plug concealed wiring with 2 X 4 or 6 or 10 sq. mm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#60

60 Wiring for light or power plug with 4 X 4 or 6 or 10 sq. mm Open Wiring Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#61

61 Wiring for light or power plug with 4 X 4 or 6 or 10 sqmm copper conductor Concealed Wiring please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#62

62 Wiring for Separate circuit for Air Condition Point Open Wiring Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#63

63 Wiring for Separate circuit for Air Condition Point Wiring Concealed Wiring Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#64

64 Wiring for circuit or sub main wiring 2X1dot5 Sqmm plus 1X1dot5 Sqmm Earth wire Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#65

65 Wiring for circuit or sub main wiring 4X1 dot 5Sqmm plus X1dot5 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#66

66 Wiring for circuit or sub main wiring2 X 2dot5 Sqmm plus 1X1dot5 Sqmm Earth wire Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#67

67 Wiring for circuit or sub main wiring 4 X 2dot5Sqmm plus 1X1dot5 Sqmm Earth wire Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#68

68 Wiring for circuit or submain wiring 2 X 4 Sqmm plus 1 X 1dot5 Sqmm Earth wire Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#69

69 Wiring for circuit or sub main wiring 4 X 4 Sqmm plus 1 X 1dot5 Sqmm Earth wire Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#70

70 Wiring for circuit or sub main wiring 4 X 6 Sqmm plus 2 X 6 Sqmm. Earth wire Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#71

71 Wiring for circuit or sub main wiring 4 X 10 Sqmm plus 2 X 6 Sqmm Earth wire Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#72

72 Wiring for circuit or sub main wiring 4 X 16 Sqmm plus 2 X 6 Sqmm Earth wire Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#73

73 Installation LED fitting of all types complete with all accessories Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#74

74 Installation Street light LED fitting of all types, complete with all accessories Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#75

75 Installation of ceiling fan Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#76

76 Installation of Wall Mount fan Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#77

77 Service Board and Main board Wiring 1 Phase

As per the specification by the Quotation

1 job Delivery: 15 days
#78

78 Service Board and Main board Wiring 3 Phase

As per the specification by the Quotation

1 job Delivery: 15 days
#79

79 Wire Running charges for Above 5 Meters 2 X 1dot5 Sqmm plus 1 X 1dot5 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#80

80 Wire Running charges for Above 5 Meters 4 X 1dot 5 Sqmm plus 1 X 1dot5 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#81

81 Wire Running charges for Above 5 Meters 2 X 2dot5 Sqmm plus 1 X 1dot 5 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#82

82 Wire Running charges for Above 5 Meters 4 X 2dot5 Sqmm plus 1 X 1dot5 Sq.mm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#83

83 Wire Running charges for Above 5 Meters 2 X 4 Sqmm plus 1 X 1dot5 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#84

84 Wire Running charges for Above 5 Meters 4 X 4 Sqmm plus 1 X 1dot5 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#85

85 Wire Running charges for Above 5 Meters 4 X 6 Sqmm plus 1 X 1 dot 5 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#86

86 Wire Running charges for Above 5 Meters 4 X 10 Sqmm plus 1 X 1dot 5 Sqmm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#87

87 Wire Running charges for Above 5 Meters 4 X 16 Sqmm plus 1 X 1dot5 Sq.mm Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#88

88 Replacing Charge of following 2Way or 4Ways surface or recess mounting vertical type TPN MCB DB please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#89

89 Fixing Charge of following 2Way or 4Ways surface or recess mounting vertical type TPN MCB DB please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#90

90 Replacing Charge of vertical type TPN MCB DB 8 Way please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#91

91 Fixing Charge of vertical type TPN MCB DB 8 Way please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#92

92 Replacing Charge of vertical type TPN MCB DB 12 Way please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#93

93 Fixing Charge of vertical type TPN MCB DB 12 Way please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#94

94 Replacing Charge of vertical type TPN MCB DB 16 Way please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#95

95 Fixing Charge of vertical type TPN MCB DB 16 Way please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#96

96 Replacing Charge of vertical type TPN MCB DB 24 Way please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#97

97 Fixing Charge of vertical type TPN MCB DB 24 Way please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#98

98 Replacing Of ExFan on the Surface connection testing Commissioning Etc as required please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#99

99 Fixing Of ExFan on the Surface connection testing Commissioning Etc as required please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#100

100 Replacing 1way or 2 way 6A piano type switch or socket on the existing switch box or cover please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#101

101 Fixing 1way or 2 way 6A piano type switch or socket on the existing switch box or cover please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#102

102 Replacing piano type switch or socket on the existing switch box or cover 20 amps switch Socket please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#103

103 Fixing piano type switch or socket on the existing switch box or cover 20 amps switch Socket please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#104

104 Replacing Electronic type regulator on the existing switch box or cover please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#105

105 Fixing Electronic type regulator on the existing switch box or cover please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#106

106 Replacing Charge 5A Ceiling Rose on the Existing Junction Box or wooden Block Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#107

107 Fixing Charge 5A Ceiling Rose on the Existing Junction Box or wooden Block Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#108

108 Replacing 5A Brass Batten or angle Holder including Connection Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#109

109 Fixing 5A Brass Batten or angle Holder including Connection Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#110

110 Replacing TPN disconnector fuse switch unit inside the existing panel board 63A please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#111

111 Fixing TPN disconnector fuse switch unit inside the existing panel board 63A please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#112

112 Replacing TPN disconnector fuse switch unit inside the existing panel board 125 or 100A please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#113

113 Fixing TPN disconnector fuse switch unit inside the existing panel board 125 or 100A please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#114

114 Replacing TPN disconnector fuse switch unit inside the existing panel board 160A please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#115

115 Fixing TPN disconnector fuse switch unit inside the existing panel board 160A please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#116

116 Replacing TPN disconnector fuse switch unit inside the existing panel board 200A please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#117

117 Fixing TPN disconnector fuse switch unit inside the existing panel board 200A please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#118

118 Replacing TPN disconnector fuse switch unit inside the existing panel board 400A please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#119

119 Fixing TPN disconnector fuse switch unit inside the existing panel board 400A please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#120

120 Replacing 4P Change over switch unit inside the existing panel board 63A Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#121

121 Fixing 4P Change over switch unit inside the existing panel board 63A Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#122

122 Replacing 4P Change over switch unit inside the existing panel board Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#123

123 Fixing 4P Change over switch unit inside the existing panel board 100 or 125 or 160A Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#124

124 Replacing 4P Change over switch unit inside the existing panel board 200A Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#125

125 Fixing 4P Change over switch unit inside the existing panel board 200A Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#126

126 Replacing 4P Change over switch unit inside the existing panel board 400A Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#127

127 Fixing 4P Change over switch unit inside the existing panel board 400A Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#128

128 Replacing 4P Change over switch With Enclosure 63 or 100 or 160 A Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#129

129 Fixing 4P Change over switch With Enclosure 63 or 100 or 160 A Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#130

130 Replacing 4P Change over switch With Enclosure 200A Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#131

131 Fixing 4P Change over switch With Enclosure 200A Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#132

132Fixing single pole 5 amps to 32 amps rating Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#133

133 Replacing single pole 5 amps to 32 amps rating Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#134

134 Replacing Double pole 5 amps to 32 amps rating Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#135

135 Fixing Double pole 5 amps to 32 amps rating Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#136

136 Replacing Triple pole 4 pole Replacing Charge 5 amps to 63 or 100A rating Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#137

137 Fixing Triple pole 4 pole Replacing Charge 5 amps to 63 or 100A rating Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#138

138 Replacing double pole Isolater 40 Amps Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#139

139 Fixing double pole Isolater 40 Amps Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#140

140 Replacing double pole Isolater 63 Amps Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#141

141 Fixing double pole Isolater 63 Amps Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#142

142 Replacing Four pole Isolater 40 Amps Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#143

143 Fixing Four pole Isolater 40 Amps Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#144

144 Replacing Four pole Isolater 63 Amps Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#145

145 Fixing Four pole Isolater 63 Amps Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#146

146 Replacing 16or25or32Amps TP MCB Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#147

147 Fixing 16 or 25 or 32A TP MCB Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#148

148 Replacing 20A 240 volts, SPN industrial type Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#149

149 Fixing 20A 240 volts, SPN industrial type Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#150

150.Replacing capacity rising mains 200 amps Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#151

151.Fixing capacity rising mains 200 amps Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#152

152.Replacing TPN tap off box 16 or 32 or 63 or 100 Amps TPN Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#153

152 Fixing TPN tap off box 16 or 32 or 63 or 100 Amps TPN Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#154

154 Earthing with G.I. earth plate 600 mmX600mmX6 mm thick including accessories Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#155

155 Earthing with Copper earth plate 600mmX600mmX6mm thick including accessories Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#156

156 Earthing with GI Earth pipe 1 meter long, 40mm DIA including accessories Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#157

157 Earthing with GI Earth pipe 2 meters long , 40mm DIA including accessories Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#158

158 Earthing with GI Earth pipe 3 meter long 40mm DIA including accessories Detailed specification please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#159

159 Laying earth connection from earth electrode with 4mm Dia copper wire in 15 mm dia GI pipe please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#160

160 Laying earth connection from earth electrode with 25mmX5mm copper or GI Flat Strip GI pipe please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#161

161 Fixing 4mm DIA copper wire on surface or in recess for loop earthing along conduit or Sub main or cable as required

As per the specification by the Quotation

1 job Delivery: 15 days
#162

162 Laying zero point 5 mm Telephone line wiring in surface or recessed PVC conduit,

As per the specification by the Quotation

1 job Delivery: 15 days
#163

163 Drawing LAN Cable or Co-axial TV cable RG6 grade 0.7mm solid copper conductor in the existing surface or recessed steel or PVC conduit

As per the specification by the Quotation

1 job Delivery: 15 days
#164

164 Labour rate for Electrical Helper

As per the specification by the Quotation

1 job Delivery: 15 days
#165

165 Labour Rate for Excavator

As per the specification by the Quotation

1 job Delivery: 15 days
#166

166 UPS and Battery Dismantling Charges including Battery to UPS and UPS to Feeding Terminal point terminating Wires Switches Sockets etc Up To 3 KVA

As per the specification by the Quotation

1 job Delivery: 15 days
#167

167 UPS and Battery installation Charges including Battery to UPS and UPS to Feeding Terminal point terminating Wires Switches Sockets etc Up To 3KVA

As per the specification by the Quotation

1 job Delivery: 15 days
#168

168 UPS and Battery installing Charges including Battery to UPS Above 3KVA to 5KVA please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#169

169 UPS and Battery Dismantling Charges including Battery to UPS Above 3KVA to 5KVA please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#170

170 UPS and Battery installing Charges including Battery to UPS Above 5KVA to 10KVA please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#171

171 UPS and Battery Dismantling Charges including Battery to UPS Above 5KVA to 10KVA please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#172

172 UPS and Battery installing Charges including Battery to UPS Above 10KVA please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#173

173 UPS and Battery Dismantling Charges including Battery to UPS Above 10KVA please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days
#174

174 GI 3 inches 6mtr street light pole supply and installtion please refer the Data sheet in the attachment

As per the specification by the Quotation

1 job Delivery: 15 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM Authorization Certificate

2

Additional Doc 4 (Requested in ATC)

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Similar Tenders

5 found

Contract Bidding Open For COPPER BUS BAR in BENGALURU URBAN, KARNATAKA

ITI Limited

📍 BENGALURU URBAN, KARNATAKA

Est: ₹1.1 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View EPROCURE

160 X 10 mm EC grade copper bus bar as per annexure attached,125 X 10 mm EC grade copper bus bar as

Directorate Of Purchase And Stores

📍 TUTICORIN, TAMIL NADU

EMD: ₹3.4 L
⏰ Deadline: 2 months left
🛒 Type: Goods
View GEM
Urgent

ETP Copper bus bar

Directorate Of Purchase And Stores

📍 INDORE, MADHYA PRADESH

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM

Busbar Connector Aluminum Pipe to Conductor Current Capacity 800A,Voltage Grade 33kV,PAD Connector

Central Coalfields Limited

📍 CHATRA, JHARKHAND

EMD: ₹30,800
Est: ₹15.4 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

INSULATOR BUSBAR

Bharat Heavy Electricals Limited (bhel)

📍 BANGALORE, KARNATAKA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Chat with us