TenderDekho Logo
GEM

Tender Notice for Sheave pulley Assy fitted with friction insert as per drawing attached, Make: ABB in EAST SINGHBHUM, JHARKHAND

Bid Publish Date

28-Jun-2025, 10:06 am

Bid End Date

26-Jul-2025, 3:00 pm

EMD

₹2,15,557

Progress

Issue28-Jun-2025, 10:06 am
Corrigendum19-Jul-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 3

Uranium Corporation Of India Limited has released a public tender for Sheave pulley Assy fitted with friction insert as per drawing attached, Make: ABB in EAST SINGHBHUM, JHARKHAND. Quantity: 1. Submission Deadline: 26-07-2025 15: 00: 00. Download documents and apply online.

Documents 5

GeM-Bidding-8019874.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Shaft for Sheave Pulley 400 mm Dia

Nmdc Limited

DANTEWADA, CHHATTISGARH

Posted: 24 August 2025
Closed: 3 September 2025
GEM

00010 M5504997126 SHEAVE PULLEY, 20 MM, 420 PCD

Ntpc Limited

NALANDA, BIHAR

Posted: 10 December 2024
Closed: 31 December 2024
GEM

30T BOTTOM BLOCK, DWN: 036.213. 00.012,SHEAVE F 30T BOTM BLK, DWN: 036.213. BF. 020,UPPER PULLEY BL

Bokaro Steel Plant

BOKARO, JHARKHAND

Posted: 3 June 2025
Closed: 13 June 2025
GEM

THIMBLE TYPE FRICTION WEDGE WINDING ROPE SKIP ATTACHMENT LH AS PER DRAWING NO. M-204.,THIMBLE TYPE

Hindustan Copper Limited

JHUNJHUNU, RAJASTHAN

Posted: 10 April 2025
Closed: 5 June 2025
GEM

BOTTOM PULLEY BLOCK ASSY, DWN: 3709.01. 400

Bokaro Steel Plant

BOKARO, JHARKHAND

Posted: 25 April 2025
Closed: 9 May 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

19-Jul-2025