TenderDekho Logo
Active GEM

Indian Oil Corporation Limited BHEL make 6.6KV & 33KV VCBs Tender 2026 Rajasthan

Bid Publish Date

24-Sep-2026, 10:36 am

Bid End Date

28-Oct-2026, 3:00 pm

Generate Docs

Progress

Issue24-Sep-2026, 10:36 am
Corrigendum21-Oct-2026
AwardPending

Key Highlights

  • • Brand/OEM requirement: BHEL make VCBs (6.6KV and 33KV) with OEM authenticity
  • • Technical standards: expect IS/IEC high-voltage equipment compliance, ISI certifications may be required
  • • Special clause: quantity variation up to 25% during contract; delivery extension formula
  • • Eligibility: OEM authorization, GSTN, PAN, financial solvency; prior experience in high-voltage switchgear preferred

Tender Overview

Indian Oil Corporation Limited issues a procurement tender for BHEL make 6.6KV and 33KV Vacuum Circuit Breakers (VCBs). The opportunity involves supply of high-voltage switchgear components under government e-procurement, with a potential quantity variation clause of up to 25% and contract-time extension provisions. Although the BOQ shows zero items, bidders should prepare for multi-item scope aligned with BHEL VCB specifications and IOC’s project requirements. The tender emphasizes supplier readiness to scale within contracted rates and adhere to delivery timelines triggered from the original delivery order date. Unique terms include the option to adjust order quantity and compute delivery extensions based on a defined formula, ensuring alignment with project scheduling and inventory planning.

Technical Specifications & Requirements

  • Product category: BHEL make 6.6KV and 33KV Vacuum Circuit Breakers (VCBs)
  • Standards/compatibility: Specification references not provided; bidders should anticipate IS standards for high-voltage switchgear and OEM-aligned VCBs
  • Quantity: Not disclosed in BOQ; tender allows quantity variation up to 25% of bid quantity during contract and currency
  • Delivery terms: Delivery period extends from last date of original delivery order; extended duration calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum 30 days; extension may be further adjusted up to original delivery period
  • Documentation: ATC uploaded by buyer; refer to FI file for additional bidder requirements
  • Certifications: OEM-specific approvals likely required (BHEL/OEM), ISI/IS standards may apply to high-voltage equipment
  • Performance: Not specified; bidders should prepare for high-reliability, OEM-backed VCBs and after-sales support
  • Warranty/AMC: Not specified; verify with ATC and contract terms

Terms, Conditions & Eligibility

  • Quantity variation rights: up to 25% increase/decrease at contracted rates
  • Delivery: linked to original delivery order date; extended period formula with minimum 30 days
  • EMD/Security: Not specified in available data; verify in ATC
  • Payment terms: Not specified; confirm in ATC and draft contract
  • Documentation: Submit ATC, OEM authorizations, and standard corporate docs; GST/PAN/experience certificates likely required
  • Penalties: Standard L/D terms not shown; check final ATC for penalties and performance bonds

Key Specifications

  • Product: BHEL make 6.6KV and 33KV Vacuum Circuit Breakers (VCBs)

  • Quantities: Not disclosed; subject to 25% variation at bid and contract levels

  • Delivery: From last date of original delivery order; extended duration formula with minimum 30 days

  • Standards/Compliance: OEM-specific approvals; IS/IEC high-voltage standards likely required

  • Quality: OEM-backed VCBs with appropriate warranty and service support

  • Documentation: ATC file indicates additional bidder requirements

Terms & Conditions

  • Quantity variation up to 25% during contract

  • Delivery extensions computed as (Increased quantity ÷ Original quantity) × Original delivery period with 30-day minimum

  • ATC and OEM authorizations required for bid submission

Important Clauses

Payment Terms

Payment terms to be defined in ATC; bidders must align with IOC contract norms and provide documentation accordingly

Delivery Schedule

Delivery starts from the last date of the original delivery order; extended delivery time computed via specified formula

Penalties/Liquidated Damages

LD terms to be clarified in ATC; ensure coverage for delays in high-voltage equipment supply

Bidder Eligibility

  • OEM authorized to supply BHEL make 6.6KV and 33KV VCBs

  • Demonstrated experience in high-voltage switchgear procurement

  • Financial solidity evidenced by audited statements

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Single Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

Yes

Tech Clarification Time

5 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Mediation Clause

Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

BHEL make 6.6KV and 33KV VCB's

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Vadodara

Delivery Pincodes

391320

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
SOUMEN HAZRA391320,P.O Jawaharnagar 391320VadodaraGujarat3913201120-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASINDIAN OIL CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9933876.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Iocl- Gujarat Refinery

Grievance Contact

[email protected]

Corrigendum Updates

3 Updates
#1

Update

21-Oct-2026

Extended Deadline

28-Oct-2026, 9:30 am

Opening Date

29-Oct-2026, 9:30 am

#2

Update

14-Oct-2026

Extended Deadline

21-Oct-2026, 9:30 am

Opening Date

22-Oct-2026, 9:30 am

#3

Update

07-Oct-2026

Extended Deadline

14-Oct-2026, 9:30 am

Opening Date

15-Oct-2026, 9:30 am

Advertisement

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar high-voltage switchgear supply

4

Financial statements (audited) for the last 3 years

5

EMD/Security deposit as specified in ATC

6

Technical bid documents and OEM authorization

7

IS/IEC compliance certificates and OEM quality approvals

8

Any additional bidder documents specified in the ATC upload

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid for IOC high voltage VCB tender in Rajasthan 2026

Bidders must register on GEM, obtain OEM authorization for BHEL make 6.6KV and 33KV VCBs, submit ATC, GST, PAN, experience certificates, audited financials, and EMD as specified. Ensure IS/IEC compliance and provide OEM warranties; delivery terms follow the original order date with a 25% quantity variation clause. Final submission hinges on ATC confirmation.

What documents are required for BHEL VCB IOC procurement 2026

Submit GST certificate, PAN, experience certificates for switchgear supplies, audited financials for three years, EMD/security, OEM authorization, technical bid documents, IS/IEC compliance certificates, and any ATC-specified documents. Ensure the OEM is authorized to supply BHEL make 6.6KV and 33KV VCBs.

What are the delivery terms for IOC 6.6KV VCB tender

Delivery begins from the last date of the original delivery order. If quantity increases up to 25%, the extended delivery time is (Increased ÷ Original) × Original period, with a minimum of 30 days. The purchaser may extend to the original delivery period at contracted rates.

What standards and certifications are expected for VCBs in IOC bid

Bidders should anticipate OEM-specific approvals for BHEL VCBs and IS/IEC compliance. ISI or equivalent certifications may be required to demonstrate high-voltage equipment reliability and safety. OEM warranties and after-sales support are typically mandatory.

How is the EMD amount handled for IOC VCB procurement

The EMD amount is not shown in available data; verify in the ATC. Typically, EMD is submitted via online payment or demand draft as specified, and is refundable subject to bid outcome per GEM rules.

What is the scope of quantity variation for IOC VCB tender

The buyer reserves the right to vary the quantity up to 25% during placement and currency of the contract. The variation must be at the contracted rates, with delivery timelines adjusted per the defined formula.

When will IOC share the full specification for BHEL VCBs

Full technical specifications will be published in the ATC uploaded by IOC. Bidders should review the ATC for exact model numbers, voltage ratings, current ratings, operating mechanisms, and warranty terms before submission.

What is the contracting entity for supply of VCBs in 2026

The contracting organization is Indian Oil Corporation Limited. The procurement category involves BHEL make 6.6KV and 33KV VCBs, with ATC documenting bidder obligations and OEM requirements; ensure alignment with GEM portal processes.

Advertisement