TenderDekho Logo
Active GEM

Open Tender for Roller Blind (V2) in PUNE, MAHARASHTRA

Bid Publish Date

31-Aug-2026, 4:26 pm

Bid End Date

03-Sep-2026, 5:00 pm

Location

PUNE , MAHARASHTRA

Progress

Issue31-Aug-2026, 4:26 pm
AwardPending

A tender has been published for Na Roller Blind (V2) (Q3) in PUNE, MAHARASHTRA. Quantity: 33 by. Submission Deadline: 03-09-2026 17: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

33

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

5

OEM Avg. Turnover

3

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Roller Blind (V2) (Q3)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Pune

Delivery Pincodes

411007

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Soma Dhanamma411007,VAMNICOM BHAVAN,Near Savitribai Phule Pune University, Ganeshkhind Road, PunePuneMaharashtra4110073315-

Authority Records

MINISTRY OF COOPERATION

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9778618.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Na

Department

NA

Office Name

Pune

Grievance Contact

[email protected]

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
GENERIC Mounting arrangement Bracket systems – to install functional roller blind mechanism
GENERIC Types of roller blind Sun screen roller blind
GENERIC Shading solution Single roller blind – utilise one layer of fabric (called outer layer)
GENERIC Operating mechanism Side winders (that lock the manually adjustable blinds at different levels with the internal ratchet and tension adjusted by spring inside the tube)
GENERIC Roller blind fitting option Outside mount (Arc fit) – that fits over the window frame
GENERIC Outside mount (Arc fit) – that fits over the window frame Flat
Mechanism material Control unit made up of High strength reinforced plastic Polyester reinforced plastic
Mechanism material Installation Bracket made up of Mild steel and Zinc plated
Mechanism material Inner diameter(id) of roller tube 38 mm
Mechanism material Wall thickness of roller tube 1 mm
Mechanism material End plug material Polyester reinforced plastic
Mechanism material Finish of exposed portion Glossy
Motor Specification Speed N.A
Motor Specification Control N.A
Motor Specification Maximum Power consumption N.A
Fabric Details Fabric material Polyester, Cotton, Silk, PVC, Fiberglass, Polyester + Viscose
Fabric Details Fabric Patterns Plain
Dimension Width of the Blind 8 ft
Dimension Height of the Blind 10 ft
Warranty Warranty period in number of years (for mechanism only) 1, 2, 3 Or higher
Certifacation/ Test Report Availability of Test Report From Central Govt/Nabl/Ilac Accredited Lab to Prove Conformity to Specification Yes
Certifacation/ Test Report Copies of Test reports and certifications to be furnished to buyer on demand at the time of supplies Yes

Explore More Opportunities

Quick Access