TenderDekho Logo
Active GEM

Osmanabad District Panchayats Outdoor Slide V3 Tender 2026 Maharashtra - Supply Installation Testing & Training per Terms

Bid Publish Date

17-Nov-2026, 9:40 am

Bid End Date

27-Nov-2026, 10:00 am

Progress

Issue17-Nov-2026, 9:40 am
AwardPending

Tender Overview

The opportunity is issued by Osmanabad District Panchayats, operating under the Department Of Panchayati Raj, for the procurement of an Outdoor Slide (V3) (Q4). The bid covers supply, installation, testing, commissioning of goods, and operator training along with any statutory clearances if required. The buyer retains a right to vary quantities by up to 25% during and after contract award at contracted rates, and to extend delivery timelines accordingly. The scope is complemented by a commitment to maintain delivery timelines aligned with the option clause and extended periods. This tender targets suppliers capable of turnkey delivery and post-installation support, including installation and training.

Technical Specifications & Requirements

  • Product: Outdoor Slide (V3) (Q4) as the main procurement category
  • Scope of supply: Supply, installation, testing, commissioning, operator training, and providing statutory clearances if any
  • Delivery flexibility: Quantity can be increased up to 25% during contract and currency of contract; delivery period adjustments follow the option clause formula
  • Turnover criteria: Mandatory minimum average annual turnover over the last three years; includes both bidder and OEM turnover requirements with documentary evidence from audited statements or CA/Cost Accountant certificates
  • OEM requirements: OEM turnover criteria applies to the offered product; requires relevant financial proof for OEM operations
  • The tender lacks detailed itemized BOQ specifications but emphasizes turnkey delivery, compliance, and post-delivery support

Terms, Conditions & Eligibility

  • Delivery/commercial terms: Turnover-based eligibility for both bidder and OEM; option-based quantity variation up to 25%; delivery period calculations based on original and extended periods with minimum 30 days
  • Scope clause: Bid price must include all costs for supply, installation, testing, commissioning, and operator training; statutory clearances if applicable
  • Liability: Sub-contracting and assignment require prior written consent; ultimate liability remains with the primary seller
  • Documentation: Bidders must provide audited balance sheets or CA/Cost Accountant certificates demonstrating turnover; balance evidence should cover the last three financial years
  • General: Tender requires compliance with the stated terms; no concrete delivery date or EMD amount is provided in the data
  • Note: No BOQ items are listed; the emphasis is on turnkey capability and compliance with turnover criteria

Key Specifications

  • Product/service names: Outdoor Slide (V3) (Q4); procurement category for public outdoor play equipment

  • Quantities/values: No explicit quantities or estimated values provided

  • EMD/values: Not specified in tender data

  • Experience: Turnover criteria for bidder and OEM; three-year turnover evidence required

  • Quality/standards: No explicit standards listed; emphasis on statutory clearances if any and turnkey delivery

  • Delivery/installation: Scope includes supply, installation, testing, commissioning, and operator training

  • Warranty/AMC: Not specified in tender data

Terms & Conditions

  • Option clause permits ±25% quantity adjustment at contract placement and during currency with calculated delivery time and minimum 30 days

  • Turnover criteria require three-year average annual turnover evidence; separate bidder and OEM turnover requirements

  • Scope demands turnkey delivery including installation, testing, commissioning, operator training, and any statutory clearances

Important Clauses

Payment Terms

Not specified in provided data

Delivery Schedule

Delivery time is linked to original and extended periods with a minimum 30 days for additional time; quantity variations may extend delivery accordingly

Penalties/Liquidated Damages

Not specified in provided data

Bidder Eligibility

  • Three-year average annual turnover evidence for bidder

  • Three-year average annual turnover evidence for OEM of the offered product

  • Audited balance sheets or CA/Cost Accountant certificates indicating turnover details

Advertisement

Tender Data

Bid Details

Quantity

12

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

1

Past Performance

80 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Outdoor Slide (V3) (Q4)

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Osmanabad

Delivery Pincodes

413501

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Eknath Bhupal Mane413501,GRAMPANCHAYAT OFFICE SANJATQ AND DIST DHARASHIVOsmanabadMaharashtra4135011215-

Authority Records

PANCHAYATI RAJ DEPARTMENTDISTRICT PANCHAYATS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-10173956.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Sanja 184318

Grievance Contact

[email protected]

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Authorization Certificate

5

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for outdoor slide tender in Osmanabad 2026?

Bidders should prepare turnover evidence, audited financials for the last three years, and CA/Cost Accountant certificates. The tender requires turnkey delivery: supply, installation, testing, commissioning, operator training, and statutory clearances if any. Ensure OEM turnover proof and prior similar project experience is demonstrated.

What documents are required for the Osmanabad slide procurement bid?

Submit GST registration, PAN, audited balance sheets or CA certificates showing turnover, turnover evidence for OEM, EMD details if applicable, technical compliance statements, and OEM authorizations. Include proof of experience in similar playground equipment projects and turnover thresholds for both bidder and OEM.

What are the key scope elements for the Outdoor Slide V3 tender?

Scope includes supply, installation, testing, commissioning, operator training, and providing any statutory clearances if required. The price should cover all components, accessories, and service charges; delivery timelines depend on the option clause with minimum 30 days extension rules.

What is the delivery timeline for quantity adjustments in this tender?

Delivery time can extend when quantities change, based on (Extended quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The buyer may increase quantity by up to 25% during the contract period.

What turnover data is required for bidders and OEMs?

Bidders must provide average annual turnover for the last three financial years ending 31st March, verified by audited statements or CA/Cost Accountant certificates. If the entity is <3 years old, turnover is calculated on completed years after incorporation.

Are there any specific standards or certifications for this tender?

The data does not specify particular standards; however, bidders must provide statutory clearance details if applicable and comply with baseline turnover and turnkey delivery requirements. OEM turnover proof is required, along with experience in similar projects.

What happens if quantities are increased under the option clause?

If the option is exercised, the order quantity may rise by up to 25% at contracted rates. The delivery period extension is calculated using the stated formula, ensuring minimum 30 days for added time.

What if there are no BOQ items listed for this tender?

In the absence of BOQ items, bidders must align with the stated turnkey scope: supply, installation, testing, commissioning, training, and any statutory clearances, while meeting turnover and OEM requirements and the option-based quantity adjustments.