TenderDekho Logo
Closed GEM

BSNL DOT Jagdalpur Attending Site on Call Basis Tender 2026 for Electrical & AC Spares – 57 Items, ₹571345 Estimated Value

Bid Publish Date

26-Oct-2026, 1:31 pm

Bid End Date

12-Nov-2026, 2:00 pm

EMD

₹11,427

Value

₹5,71,345

Generate Docs

Progress

Issue26-Oct-2026, 1:31 pm
Corrigendum09-Nov-2026
AwardPending

Tender Overview

Organization: Bharat Sanchar Nigam Limited Portal (BSNL) under the Department of Telecommunications. Product/Service: Attending site on call basis up to 200 KM including electrical components (MCBs, MCCBs, isolators, fuses), LED fixtures, tubes, capacitors, ballast, AC PCB/ motors, SITC services, and related installation/ commissioning tasks. Estimated Value: ₹571,345 with EMD of ₹11,427. Location: Jagdalpur, NBA (Chhattisgarh region) with multi-distance service ranges from 0–200 KM. Scope: On-site attendance and service delivery across multiple site bands, including SITC, repairs, replacements, and testing.

Technical Specifications & Requirements

  • No formal standalone technical specs published; scope includes: MCBs (6–32 A, C‑series, 10KA), Isolators (63–100 A, 4-pole), MCCBs (63–100 A), LED fixtures (18W, 9W), 436W T8 FTL tubes, electronic ballasts, capacitors (46/36–50 mfd), 1.5 TR AC components (PCB, motors, rewinding), refrigerants (R22, 410A) top-ups, SITC of timer switches, ML contactors, and dismantling/installation work within 0–200 KM bands.
  • Delivery terms include on-site installation, testing, and commissioning as per ATC; period and updates governed by option clause allowing ±25% quantity changes.
  • Experience/Compliance: Must meet generic vendor criteria and provide evidence of 3 years of similar government supply history; GST responsibility borne by bidder with actual GST applicability.
  • Quality/Standards: No explicit IS/ISO numbers stated; ensure non-obsolete items with OEM support for the specified electrical components in a government context.

Terms, Conditions & Eligibility

  • Option Clause: Quantity may increase/decrease by up to 25% at contract award; extended delivery calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days.
  • Delivery/Installation: On-site delivery and commissioning at ATC addresses; adherence to delivery timelines remains critical.
  • Financial Standing: No liquidation or bankruptcy; provide an undertaking to this effect.
  • Submissions: GST, PAN, experience certificates, and evidence of prior government/PSU supply; OEM authorizations where required.
  • Warranty/Penalties: Not specified; standard procurement risk applies per buyer terms.

Key Specifications

  • Electrical components: MCBs 6–32 A, C series, 10KA

  • Isolators: 63 A to 100 A, 4-pole

  • MCCBs: 63 A and 100 A, 4-pole

  • LED fixtures: 18 W, 9 W; LED bulbs 18 W

  • T8 tubes: 436 W with electronic ballast

  • Capacitors: 46 mfd / 50 mfd for ceiling fans; 2.54 mfd for specific capacitors

  • AC components: PCB for indoor/outdoor, motors, rewinding; refrigerants R22 and 410A

  • SITC: timer switches, ML contactors (4-pole), AC dismantling/installation (1.5 TR capacity)

Terms & Conditions

  • EMD: ₹11,427 must accompany bid; GST is bidder's responsibility

  • Delivery: on-site installation and commissioning per ATC; option clause enables 25% quantity variation

  • Experience: minimum 3 years in similar govt/PSU supply; OEM authorizations where needed

Important Clauses

Payment Terms

GST payable by bidder; payment terms aligned to ATC with delivery/completion milestones; no advance clear specification in the tender

Delivery Schedule

Delivery starts after order; delivery period adaptable per option clause with minimum 30 days extension for increased quantities

Penalties/Liquidated Damages

Penalties are implied under standard procurement terms; exact LD rates not specified in provided data

Bidder Eligibility

  • Not under liquidation, court receivership, or similar proceedings

  • 3 years of regular manufacturing/supply of similar category products to Govt/PSU

  • Non-obsolete products with at least 7 years residual market life or OEM support

Advertisement

Authority & Contact

Office Name

Bsnl Electrical Zone Chhattisgarh Raipur

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

328

Category

100 A Four Pole MCCB

Bid Type

Two Packet Bid

Bid Validity

150 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

18

OEM Avg. Turnover

2

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Attending site on call basis upto 20 Kms local sites Jagdalpur NBA , Attending site on call basis 21 kms to 50 Kms , Attending site on call basis 51 kms to 100 Kms , Attending site on call basis 101 kms to 150 Kms , Attending site on call basis 151 kms to 200 kms , MCBs Single pole 6 to 32 Amp C series 10KA New , MCBs SPN 06 to 32 Amp C series 10KA New , MCBs TP 06 to 32 Amp C series 10KA New , MCBs TPN 06 to 32 Amp C series 10KA New , MCB Isolator 63 Amp Tripple pole , MCB Isolator 40 Amp 4 pole , MCB Isolat or 100 Amp 4 pole , MCB Isolator 63 Amp 4 pole , 18 Watt LED light fixtures New , 18 Watt LED BULBS New , 9 Watt LED light fixtures New , 436W T8 FTL tubes , Electronic Ballast suitable for T8 FTL , Universal Starter FSU , 2.54 mfd capacitor for ceiling fan , 63A Four Pole MCCB , 100 A Four Pole MCCB , 63A Four Pole on load change over switch , 100 A Four Pole on load change over switch , Neutral link , 63 Amp kit kat Fuse , 100 Amp kit kat fuse , 200 Amp kit kat fuse , Refrigerant R22 Gas Top up Charging , Refrigerant 410 A Gas Top up Charging , PCB for Inverter AC Indoor Outdoor set New , PCB for conventional AC New , Thermostat , Flair nuts 38 , Flair nuts 58 , Indoor senser , Outdoor senser , Control card of indoor unit , Indoor unit motor New , Outdoor unit motor New , Outdoor unit motor shaft bushing bearing , 46mfd Capacitor , 36 50 mfd Capacitor , Outdoor unit Indoor unit motor rewinding , Servicing of 1.5TR Split AC units , extra copper refrigerent piping 1.5 TR Split AC , Replacement of 1.5 TR Rotary scroled compressor suitable for split AC , Repairing of a Printed Circuit Board PCB indoor outdoor of Inverter Conventional 1.5 TR Split AC , Dismantling of existing Split AC , upto 50 KMS , upto 100 KMS , upto 150 KMS , Installation Testing and Commissioning , SITC of timer switch , SITC of 4 pole ML 1.5 Contactor , 4 way 4 plus 12 Double door , 8 way 4 plus 24 Double door

Advisory Bank

PUNJAB NATIONAL BANK

ePBG Percentage

0.05%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

375

Delivery Locations

1

Delivery Cities

Raipur

Delivery Pincodes

492001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ramanand Sahu492001,Office of The Executive Engineer[Electrical] , BSNL Electrical Divison, 1st Floor, Old TRA Building,, Fafadih Telephone Exchange Campus Raipur C.G. 492001RaipurChhattisgarh4920015375-

Authority Records

MINISTRY OF COMMUNICATIONSTELECOMMUNICATIONS DEPARTMENTBHARAT SANCHAR NIGAM LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10081422.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 57 Items Sign in for GEM prices

#1

Attending site on call basis upto 20 Kms local sites Jagdalpur NBA

Attending site on call basis for repairs of Electromechanical Services ie EA set Split AC pump set and light Fan etc in Telephone Exchange by 1 no skilled and 1no unskilled technician as per distance mentioned below with necessary Tand P etc as requiredNote 1 The visit will be made as per instruction of the Engineerincharge 2 If any site attended only 1 visit may be considered for payments till rectification of faults 3 If the agency will visit the site for attending the particular defects in any EMS he has to check the other EMS for its healthyness

5 job Delivery: 375 days
#2

Attending site on call basis 21 kms to 50 Kms

Attending site on call basis for repairs of Electromechanical Services ie EA set Split AC pump set and light Fan etc in Telephone Exchange by 1 no skilled and 1no unskilled technician as per distance mentioned below with necessary Tand P etc as required Note 1 The visit will be made as per instruction of the Engineerincharge 2 If any site attended only 1 visit may be considered for payments till rectification of faults 3 If the agency will visit the site for attending the particular defects in any EMS he has to check the other EMS for its healthyness

3 job Delivery: 375 days
#3

Attending site on call basis 51 kms to 100 Kms

Attending site on call basis for repairs of Electromechanical Services ie EA set Split AC pump set and light Fan etc in Telephone Exchange by 1 no skilled and 1no unskilled technician as per distance mentioned below with necessary Tand P etc as required Note 1 The visit will be made as per instruction of the Engineerincharge 2 If any site attended only 1 visit may be considered for payments till rectification of faults 3 If the agency will visit the site for attending the particular defects in any EMS he has to check the other EMS for its healthyness

2 job Delivery: 375 days
#4

Attending site on call basis 101 kms to 150 Kms

Attending site on call basis for repairs of Electromechanical Services ie EA set Split AC pump set and light Fan etc in Telephone Exchange by 1 no skilled and 1no unskilled technician as per distance mentioned below with necessary Tand P etc as required Note 1 The visit will be made as per instruction of the Engineerincharge 2 If any site attended only 1 visit may be considered for payments till rectification of faults 3 If the agency will visit the site for attending the particular defects in any EMS he has to check the other EMS for its healthyness

6 job Delivery: 375 days
#5

Attending site on call basis 151 kms to 200 kms

Attending site on call basis for repairs of Electromechanical Services ie EA set Split AC pump set and light Fan etc in Telephone Exchange by 1 no skilled and 1no unskilled technician as per distance mentioned below with necessary Tand P etc as required Note 1 The visit will be made as per instruction of the Engineerincharge 2 If any site attended only 1 visit may be considered for payments till rectification of faults 3 If the agency will visit the site for attending the particular defects in any EMS he has to check the other EMS for its healthyness

2 job Delivery: 375 days
#6

MCBs Single pole 6 to 32 Amp C series 10KA New

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

15 nos Delivery: 375 days
#7

MCBs SPN 06 to 32 Amp C series 10KA New

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

15 nos Delivery: 375 days
#8

MCBs TP 06 to 32 Amp C series 10KA New

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

10 nos Delivery: 375 days
#9

MCBs TPN 06 to 32 Amp C series 10KA New

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

4 nos Delivery: 375 days
#10

MCB Isolator 63 Amp Tripple pole

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

2 nos Delivery: 375 days
#11

MCB Isolator 40 Amp 4 pole

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

2 nos Delivery: 375 days
#12

MCB Isolat or 100 Amp 4 pole

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

5 nos Delivery: 375 days
#13

MCB Isolator 63 Amp 4 pole

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

5 nos Delivery: 375 days
#14

18 Watt LED light fixtures New

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

30 nos Delivery: 375 days
#15

18 Watt LED BULBS New

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

20 nos Delivery: 375 days
#16

9 Watt LED light fixtures New

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

4 nos Delivery: 375 days
#17

436W T8 FTL tubes

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

60 nos Delivery: 375 days
#18

Electronic Ballast suitable for T8 FTL

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

10 nos Delivery: 375 days
#19

Universal Starter FSU

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

10 nos Delivery: 375 days
#20

2.54 mfd capacitor for ceiling fan

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

10 nos Delivery: 375 days
#21

63A Four Pole MCCB

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

2 nos Delivery: 375 days
#22

100 A Four Pole MCCB

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

2 nos Delivery: 375 days
#23

63A Four Pole on load change over switch

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

2 nos Delivery: 375 days
#24

100 A Four Pole on load change over switch

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

2 nos Delivery: 375 days
#25

Neutral link

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

2 nos Delivery: 375 days
#26

63 Amp kit kat Fuse

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

3 nos Delivery: 375 days
#27

100 Amp kit kat fuse

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

3 nos Delivery: 375 days
#28

200 Amp kit kat fuse

Supply and fixing of the following items Job of superior make for repairs of existing MCB DB light fixtures and ceiling fan ic testing and commissioning etc complete as reqd

3 nos Delivery: 375 days
#29

Refrigerant R22 Gas Top up Charging

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

5 job Delivery: 375 days
#30

Refrigerant 410 A Gas Top up Charging

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

5 job Delivery: 375 days
#31

PCB for Inverter AC Indoor Outdoor set New

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

5 job Delivery: 375 days
#32

PCB for conventional AC New

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

4 nos Delivery: 375 days
#33

Thermostat

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

1 nos Delivery: 375 days
#34

Flair nuts 38

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

3 nos Delivery: 375 days
#35

Flair nuts 58

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

2 nos Delivery: 375 days
#36

Indoor senser

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

2 nos Delivery: 375 days
#37

Outdoor senser

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

2 nos Delivery: 375 days
#38

Control card of indoor unit

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

2 nos Delivery: 375 days
#39

Indoor unit motor New

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

5 nos Delivery: 375 days
#40

Outdoor unit motor New

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

5 nos Delivery: 375 days
#41

Outdoor unit motor shaft bushing bearing

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

2 nos Delivery: 375 days
#42

46mfd Capacitor

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

4 nos Delivery: 375 days
#43

36 50 mfd Capacitor

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

5 nos Delivery: 375 days
#44

Outdoor unit Indoor unit motor rewinding

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

1 job Delivery: 375 days
#45

Servicing of 1.5TR Split AC units

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

8 job Delivery: 375 days
#46

extra copper refrigerent piping 1.5 TR Split AC

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

5 mtrs Delivery: 375 days
#47

Replacement of 1.5 TR Rotary scroled compressor suitable for split AC

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

2 job Delivery: 375 days
#48

Repairing of a Printed Circuit Board PCB indoor outdoor of Inverter Conventional 1.5 TR Split AC

Supply and fixing of the following items/ Job of superior make for repairs of existing 1.5TR Split AC units i/c testing and commissioning etc complete as reqd

3 job Delivery: 375 days
#49

Dismantling of existing Split AC

Dismantling of existing Split AC units from TE bldg/BTS site including all associated item i/c removing screws , refrigerant pipes, cables connection & assocceries etc complete as reqd.

3 job Delivery: 375 days
#50

upto 50 KMS

Transportation of 1.5 TR split AC units ( upto 2 nos ) from one TE / BTS site to another T E / BTS site i/c loading and nloading etc complete as required.

2 job Delivery: 375 days
#51

upto 100 KMS

Transportation of 1.5 TR split AC units ( upto 2 nos ) from one TE / BTS site to another T E / BTS site i/c loading and nloading etc complete as required.

1 job Delivery: 375 days
#52

upto 150 KMS

Transportation of 1.5 TR split AC units ( upto 2 nos ) from one TE / BTS site to another T E / BTS site i/c loading and nloading etc complete as required.

1 job Delivery: 375 days
#53

Installation Testing and Commissioning

Installation, Testing and Commissioning of 1.5 TR capacity split A/C units complete with indoor units & out door units i/c Brazing the joints, pressure testing,vaccumizing , detecting of leakages and its rectification, i/c servicing indoor and outdoor units etc. as reqd.

3 job Delivery: 375 days
#54

SITC of timer switch

SITC of timer switch suitable for operation of single phase supply for ON/OFF operation of Splt AC i/c connectios , testing and commissioning etc as required. Make - L&T (GIC)

3 job Delivery: 375 days
#55

SITC of 4 pole ML 1.5 Contactor

SITC of 4 pole ML 1.5 Contactor with 230 Volt operating coil for switching ON and OFF of 1.5 TR split AC unit i/c connections , testing and commissioning etc as required. Make - L&T

3 job Delivery: 375 days
#56

4 way 4 plus 12 Double door

Supplying and fixing of following ways surface recess mounting vertical type 415 volts TPN MCB distribution board of sheet steel dust protected duly powder painted inclusive of 200 amps tinned copper bus bar common neutral link earth bar din bar for mounting MCBs but without MCBs and incomer as required Note Vertical type MCB TPDB is normally used where 3 phase outlets are required

1 nos Delivery: 375 days
#57

8 way 4 plus 24 Double door

Supplying and fixing of following ways surface recess mounting vertical type 415 volts TPN MCB distribution board of sheet steel dust protected duly powder painted inclusive of 200 amps tinned copper bus bar common neutral link earth bar din bar for mounting MCBs but without MCBs and incomer as required Note Vertical type MCB TPDB is normally used where 3 phase outlets are required

1 nos Delivery: 375 days
Advertisement

Categories 102

AGITATORS PLATFORM SCALE INVERTER APFC PANEL SWITCHES AND RELAY DISTRIBUTION BOARD ISDN STANDALONE AC PIR CHOKES COMPRESSOR TUBE AND FITTING ARNO STARTING CONTACTOR AIR COOLED ENGINE ELECTRICAL PRODUCTS SWITCH YARD DISTRIBUTION?BOX BEARINGS BUSHINGS AND GEARS AMPS SWITCHING APPARATUS HARDWARE AND FASTENERS GEYSER JOINTING OF PIPE SILVER TIP WELDING BRAZING AND SOLDERING SERVICES DISCRETE COMPONENTS SOLAR PV PLANT PIPING CIRCUIT PROTECTION DEVICE MCCB ACCUMULATOR BLADDERS ELECTRICAL SUBSTATION STATIC CONVERTERS SPEED DRIVE SYSTEM WATER PIPE LINE SOLAR CHARGER WATER CONDUCTOR SYSTEM FIRE WATER LINE WATER SUPPLY TRANSPORTATION COOLER CAPACITOR LIGHT AND BULBS POWER SOLAR CHARGING CB BOX REFRIGERATION SYSTEM ALCOHOLS SOLAR FENCE ELECTRICAL CARD AND ELECTRONIC CARD AC PIPES NEON LAMP HYBRID POWER SYSTEM HIGH TENSION PANEL MACHINERY REPAIRS PRINTED CIRCUIT BOARD TUBE LIGHT AIR CONDITIONER SERVICES SOLAR CELLS TELEPHONE EXCHANGE FITMENT BRAZE RINGS ELECTRONIC PRODUCTS AND APPLIANCES LED LIGHT CHANGE OVER SWITCH PRESSURE GAUGE AROMATIC SPIRIT BALLAST PLAIN BEARING ELECTRICAL CONDENSER TECHNICAL SERVICES NUTS VERTICAL COOLER ANIMAL LABORATORY EQUIPMENT WATER LEVEL RECORDER ALCOHOL ETHYL FUME HOODS DISTRIBUTION PANEL BRONZE PIPE ENT SET WORM GEAR TURBINE PUMPS SOLAR PHOTOVOLTAIC SYSTEM BUSHING FLUORESCENT LAMP TUBES AND PIPES TRANSITION METALS ELECTROMECHANICAL SERVICES STARTER MACHINE RECTIFIERS ESCRAP WATER COOLED ENGINE SCREWS TIMER LOW TENSION PANEL PIPES TEA KETTLE FAN BAR SLEEVE BEARING SWITCH SUPPLY

Corrigendum Updates

1 Update
#1

Update

09-Nov-2026

Extended Deadline

12-Nov-2026, 8:30 am

Opening Date

13-Nov-2026, 8:30 am

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates showing supply to government/PSU in similar category (3 years prior to bid opening)

4

Financial statements or turnover proof

5

EMD payment proof (₹11,427) and bank details

6

Technical bid documents and OEM authorizations (where applicable)

7

Any installation/commissioning certifications if scope includes SITC

8

Tax invoices, GST details and any compliance certificates

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid in BSNL Jagdalpur on-site service tender 2026?

Bidders must meet eligibility criteria including 3 years of govt/PSU supply experience, provide GST/PAN, and submit EMD ₹11,427. Include OEM authorizations where necessary and ensure non-obsolete items with 7 years of market life. Deliver on-site services and SITC as per ATC and option clause.

What documents are required for the BSNL electrical spares bid 2026?

Submit GST certificate, PAN, experience contracts/curchase orders with govt/PSU, financial statements, EMD proof, OEM authorizations, technical bid, and relevant installation/commissioning certificates. Ensure all documents reflect Jagdalpur location and ATC terms.

Which items are covered under the Jagdalpur tender electrical scope 2026?

Scope includes MCBs 6–32 A, C series 10KA; Isolators 63–100 A 4-pole; MCCBs 63–100 A; LED fixtures 18/9 W; 436 W T8 tubes with electronic ballast; capacitors; AC PCB/motors; R22/R410A refrigerants; SITC components; dismantling and installation tasks within 0–200 KM bands.

What are the delivery and quantity variation terms in this BSNL tender?

Up to 25% quantity variation is allowed at award and during currency, with delivery time adjusted using the formula (increased/original) × original period, minimum 30 days. Delivery begins after order and ATC-specific directions.

What are the EMD and payment terms for the Jagdalpur bid 2026?

EMD amount is ₹11,427. GST is bidder’s responsibility; payment terms follow ATC. Ensure submission of EMD proof with bid; payment arrangements will align to contract terms and delivery/completion milestones.

What eligibility criteria ensure bids pass for govt/PSU electrical supplies in Jagdalpur?

Bidder must not be under liquidation, provide 3 years of govt/PSU supply experience for similar products, present contracts showing yearly activity, and prove OEM authorization for critical components; non-obsolete product with at least 7 years residual market life.

Where can I find installation and SITC requirements for this tender?

SITC requirements cover timer switches, ML contactors, and AC dismantling/install tasks; on-site testing/commissioning is included. All work must be performed per ATC and within the 0–200 KM service bands with prior ATC directives.

Which standards and certifications are expected for electrical components in this bid?

No explicit standard numbers are listed; bidders should ensure parts are not obsolete, backed by OEM support, and align with general govt procurement quality expectations; verify item-level warranties and compatibility with govt infrastructure at Jagdalpur.

Advertisement