Hindustan Copper Limited Tile Flooring Work Tender MCP D-Type Bungalows 2026

Bid Publish Date

04-Sep-2026, 11:07 am

Bid End Date

14-Sep-2026, 3:00 pm

Value

₹1,44,646

Progress

Issue04-Sep-2026, 11:07 am
AwardPending

Tender Overview

Organization: Hindustan Copper Limited; Product/Service: Providing and laying vitrified tiles and ceramic glazed tiles flooring, skirting, including dismantling mosaic work and disposal of rubble. Location: MCP, D-Type Bungalows (UP due to MCP context within HCL facilities); Estimated Value: ₹144,645.58; Delivery Timeline: 4 months from award/handing over. Scope highlights CPWD-based guidelines and Engineer-in-Charge directions; 25% value variation allowed; no material issue by HCL. The contract accommodates variation up to 25% in quantity or value, with owner discretion. Unique clause includes water charge at 1% of bill value for construction water from company sources; DLP of 12 months post-completion; insurance compliance under employees’ compensation. This tender requires on-site execution, Contractor-owned tools, and adherence to CPWD standards.

Technical Specifications & Requirements

  • Scope includes: tiling installation (vinyl/ceramic glazed), skirting, dismantling existing tile/mosaic, demolition of cement concrete, and rubbish disposal per schedule of quantity.
  • Standards/Guidance: CPWD specifications serve as guideline; no materials issued by HCL; quantity variation allowed per schedule.
  • Materials/Equipment: Contractor to supply all tools and tackle; construction water charged at 1% of bill value.
  • Quality/Compliance: Insurance coverage for workers as per Employee’s Compensation Act-1923; compliance verified before bill processing.
  • DLP: 12 months post-completion.

Terms, Conditions & Eligibility

  • EMD: Not specified in data; bidders must align with standard GeM AtC terms (ensure clarity in submission).
  • Delivery: 4 months from award/date of handing over.
  • Price Variation: Up to 25% (positive/negative) in overall value; subject to Owner’s discretion.
  • Payment/Insurance: Contractor must furnish insurance proof prior to commencement; RA bills depend on compliance; 1% water charge recovery from bills.
  • L1 Criteria: Based on overall L1; contract awarded to L1 bidder.
  • Documents: Contractor to provide standard GST, PAN, experience, financials, and insurance proof as part of bid submission.
  • ATC/ATD Clauses: ATC documents applicable; scope of work defined by Schedule of Quantity and Engineer-in-Charge directions.

Key Specifications

  • Tile types: Vitreous tiles and Ceramic glazed tiles

  • Work scope: flooring, skirting, dismantling existing tiles, cement demolition, rubble disposal

  • Standards: CPWD guidelines referenced

  • Delivery: 4 months from award

  • Water charge: 1% of bill value for construction water

  • DLP: 12 months from completion

  • Insurance: Employer’s compensation coverage required

  • Material provisioning: No materials issued by HCL; contractor provides all tools

  • Variation: Value may vary up to 25% from awarded value

Terms & Conditions

  • 25% quantity/value variation permitted by the owner

  • 4-month completion timeline from award or site handover

  • 1% construction water charge recovered from bills

  • DLP of 12 months and mandatory workers’ insurance

  • L1-based award with no material issuance by HCL

Important Clauses

Payment Terms

Payment linked to compliance with insurance proof; 1% water charge recovered; RA bill processed only after submission of insurance and CPWD-aligned technical compliance

Delivery Schedule

Completion within 4 months from award/handing over; schedule of quantity governs actual quantities with possible variation up to 25%

Penalties/Liquidated Damages

Not explicitly detailed; implied through DLP and timely completion requirements; variations may affect final settlement

Bidder Eligibility

  • Evidence of previous tile flooring works and CPWD-standard projects

  • GST registration and financial solvency documentation

  • Insurance coverage for workers per Employee’s Compensation Act-1923

Tender Data

Bid Details

Quantity

1

Similar Category

Backup as a Service

Bid Type

Single Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Compliance

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Experience Required

7 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

No

Item Category

Custom Bid for Services - Tile Flooring Work in D-Type Bungalows at MCP

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Delivery Locations

1

Delivery Cities

Balaghat

Delivery Pincodes

481116

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ambarish Kumar481116,Malanjkhand Copper Project, Dist- Balaghat, Madhya Pradesh- 481116BalaghatMadhya Pradesh481116Project / Lumpsum Based--

Authority Records

MINISTRY OF MINESHINDUSTAN COPPER LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 9

GeM-Bidding-9831803.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Kolkata Corporate Office

Grievance Contact

[email protected]

Categories 3

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration Certificate

2

PAN Card

3

Experience Certificates for tile flooring work

4

Financial Statements/Turnover proof

5

Insurance Certificate (Workers' Compensation)

6

OEM Authorizations (if OEM-specific tiles are used)

7

Technical Compliance Documents (CPWD-aligned)

8

Any prior project completion certificates relevant to flooring

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

How to bid for tile flooring tender in MCP Hindustan Copper Limited 2026

Bidders should submit GST and PAN, show prior tile flooring experience, supply financial statements, and provide insurance proof before commencement. The contract allows up to 25% variation in value; completion target is 4 months, with 12-month defects liability. Ensure CPWD guidelines apply and water charges are 1% of bill value.

What documents are required for Hindustan Copper flooring tender submission

Required documents include GST certificate, PAN, experience certificates for tiles, financial statements, insurance proof, and any OEM authorizations if using specific tile brands. Technical compliance documents and CPWD-aligned details must accompany submission for eligibility.

What are the technical specifications for tile flooring at MCP bungalow project

Project specifies vitreous and ceramic glazed tiles with skirting, dismantling old tiles, and cement demolition. CPWD standards guide quality; no material issuance by HCL; contractor provides tools. Target completion in 4 months; 12-month DLP post-completion.

When is the delivery deadline for Hindustan Copper Limited tile work

Delivery must be completed within 4 months from the date of award or site handover, whichever is later. Ensure alignment with Schedule of Quantity and Engineer-in-Charge directions to avoid penalties or scope disputes.

What is the 25% variation clause for this flooring contract

Owner may increase or decrease contract quantity or duration up to 25%; value variation applies to the overall contract. Post-award, scope adjustments require bidder consent; variance accommodated within the stated limit to reflect actual site requirements.

What insurance is required for workers under the Hindustan Copper tender

Contractor must secure workers’ compensation insurance per the Employees’ Compensation Act-1923 and furnish copy before commencement; without it, RA bills will not be processed and payment may be delayed.

Which standards govern the tile installation work for this tender

CPWD specifications guide the work as a reference framework; no explicit IS or BIS codes listed. Contractors must comply with CPWD guidelines and verify site-specific Engineer-in-Charge directives for quality and inspection practices.

What is the scope of dismantling and disposal in this tile project

Scope includes dismantling existing tile/mosaic, demolition of cement concrete, and disposal of construction rubble as per the schedule of quantity. Ensure proper waste handling and permits as directed by the Engineer-in-Charge.