TenderDekho Logo
Active GEM

Indian Army Construction and Fabrication of Semi Round Parking Shed for Four-Wheelers in Bangalore Karnataka 2026

Bid Publish Date

26-Sep-2026, 1:54 pm

Bid End Date

19-Oct-2026, 2:00 pm

Generate Docs

Progress

Issue26-Sep-2026, 1:54 pm
Corrigendum14-Oct-2026
AwardPending

Key Highlights

  • • Policy allows quantity adjustment up to 25% at contract placement and during currency
  • • Project scope includes Supply, Installation, Testing and Commissioning of semi round parking shed
  • • Delivery period adjustment uses formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • • No BOQ items provided; contract appears as a single packaged project

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for the construction and fabrication of a semi round shaped four-wheeler parking shed in BANGALORE, KARNATAKA. While start/end dates, estimated value, and EMD are not disclosed, the contract encompasses Supply, Installation, Testing and Commissioning of the parking shed under the general option clause. The scope emphasizes a modular, quickly deployable structure with a focus on secure, weather-resistant parking bays. The tender highlights flexibility on quantity and currency of the contract, with delivery timing linked to the original delivery order and extended periods as defined by the option clause.

Technical Specifications & Requirements

  • Category: Construction and fabrication of semi round shaped four wheeler parking shed
  • Location: BANGALORE, KARNATAKA - 560001
  • Scope: Supply, Installation, Testing and Commissioning of parking shed
  • Key terms: Option to increase/decrease quantity up to 25% of bid quantity at contract placement; further extension up to 25% during the contract at contracted rates
  • Delivery: Calculations anchored to the last date of the original delivery order with minimum delivery extension of 30 days; delivery period may extend with option clause
  • BOQ: No items listed; indicative of a single packaged project rather than a multiple-line schedule
  • Standards: Not specified in available data; ATC file referenced for buyer terms
  • Documentation: ATC terms to be viewed for bidder obligations and compliance requirements

Terms, Conditions & Eligibility

  • EMD: Not disclosed in provided data; bidders should review ATC for exact deposit terms
  • Quantity flexibility: Up to 25% incremental/decremental supply under option clause
  • Delivery cadence: Based on last date of original delivery order; extended duration formula provided
  • Payment terms: Not specified in the available excerpt; verify ATC terms
  • Scope: Includes supply, installation, testing and commissioning; includes all cost components within bid price
  • BOQ: No listed items; project appears to be a single-scope construction contract
  • Compliance: Bidders must adhere to buyer-added ATC terms and conditions

Key Specifications

  • Product/Service: Construction and fabrication of semi round shaped four wheeler parking shed

  • Location: Bangalore, Karnataka

  • Delivery Scope: Supply, Installation, Testing and Commissioning

  • Quantity flexibility: 25% up/down allowed

  • Delivery period: Based on last date of original delivery order; extended period as per option clause with minimum 30 days

  • No explicit technical standards listed in available data; verify ATC for required certifications

Terms & Conditions

  • Option Clause allows +/- 25% quantity change at contract and during execution

  • Delivery timeline tied to original order date; minimum 30 days extension

  • Scope includes full life-cycle from supply to commissioning; costs included in bid price

Important Clauses

Payment Terms

Payment terms to be detailed in ATC; bidders should reference ATC document for schedule and milestones

Delivery Schedule

Delivery period commences from the last date of original delivery order; option-based extensions apply with formula

Penalties/Liquidated Damages

Potential penalties or LD details to be extracted from ATC; ensure compliance with delivery and quality milestones

Bidder Eligibility

  • Experience in construction/fabrication of parking structures or similar modular shelters

  • Ability to comply with Indian Army procurement ATC terms

  • Financial capability to undertake a packaged supply, installation and commissioning contract

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

10 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Construction and fabrication of semi round shaped four wheeler parking shed

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

BANGALORE

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BANGALOREBANGALORE--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9951109.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

3 Updates
#1

Update

14-Oct-2026

Extended Deadline

19-Oct-2026, 8:30 am

Opening Date

20-Oct-2026, 8:30 am

#2

Update

10-Oct-2026

Extended Deadline

14-Oct-2026, 8:30 am

Opening Date

15-Oct-2026, 8:30 am

#3

Update

06-Oct-2026

Extended Deadline

10-Oct-2026, 8:30 am

Opening Date

11-Oct-2026, 8:30 am

Advertisement

Categories 4

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN)

3

Experience certificates for similar structural fabrication projects

4

Financial statements or turnover proof as required by ATC

5

EMD documents as specified in ATC

6

Technical bid documents and compliance certifications

7

OEM authorizations or standard fabrication certifications as applicable

8

Any site-specific safety and quality certifications referenced in ATC

Frequently Asked Questions

Key insights about KARNATAKA tender market

How to bid for the Indian Army parking shed tender in Bangalore 2026?

Bidders should review the ATC terms, submit GST, PAN, experience certificates, financials, and EMD as specified. The project covers supply, installation and commissioning of a semi round parking shed; ensure compliance with option clause for quantity adjustments and delivery formula. Prepare OEM certifications as required.

What documents are required for the Bangalore parking shed tender submission?

Required documents include GST registration, PAN, experience certificates for similar projects, financial statements, EMD documents, technical bid documents, OEM authorizations, and any safety/quality certifications referenced in the ATC. Ensure originals or certified copies as per tender instructions.

What are the key technical requirements for the semi round parking shed?

The tender specifies a parking shed with supply, installation and commissioning. No explicit IS or BIS standards are listed in the provided data; bidders must verify the ATC for required certifications and quality norms and align with Indian Army construction norms for modular shelters.

What is the delivery timeline for the Bangalore parking shed project?

Delivery begins after the original delivery order date; the option clause allows up to 25% quantity variation, with delivery extensions calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.

What are the payment terms for this Indian Army procurement?

Payment terms are defined in the ATC; bidders must review the ATC for milestone-based payment schedule, including any advance or milestone payments tied to installation and testing completion.

How is the quantity variation managed in this tender in Bangalore?

The purchaser reserves rights to increase or decrease quantity by up to 25% at contract placement and again up to 25% during the contract, at contracted rates; this requires compliant delivery planning and revised schedules.

Where can I find the bidder eligibility criteria for this tender?

Eligibility includes prior experience in similar construction/fabrication projects, capability to undertake supply-installation-commissioning work, and compliance with ATC terms; verify documentation and certifications in the ATC for final eligibility.

What standards or certifications should vendors expect to meet for this project?

While specific standards are not listed in the data, bidders should obtain OEM authorizations and any safety/quality certifications called out in the ATC; ensure alignment with Indian Army procurement norms and local regulatory requirements.

Advertisement