Government Tender Published for SITC of 40 kVA Online UPS - Input supply - Three Phase, Output supply - Three Phase,SITC of 6 kVA O in JAIPUR, RAJASTHAN

Bid Publish Date

06-Aug-2026, 1:10 pm

Bid End Date

28-Aug-2026, 3:00 pm

EMD

₹21,518

Value

₹10,75,893

Progress

Issue06-Aug-2026, 1:10 pm
AwardPending

Public procurement opportunity for Bharat Sanchar Nigam Limited Portal(bsnl) SITC of 40 kVA Online UPS - Input supply - Three Phase, Output supply - Three Phase, SITC of 6 kVA Online UPS - Input supply - Single Phase, Output Supply - Single Phase, Dismantling of existing 40 kVA UPS - 02 Nos. and 5 kVA UPS - 01 No. including disconnection of all connections and shifting the same, Comprehensive Maintenance of UPS 2 nos 40 KVA UPS, Comprehensive Maintenance of UPS 1 nos 6 KVA UPS in JAIPUR, RAJASTHAN. Quantity: 52 issued by. Submission Deadline: 28-08-2026 15: 00: 00. View full details and respond.

Authority & Contact

Office Name

Bsnl Electrical Zone Rajasthan

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

52

Category

SITC of 40 kVA Online UPS - Input supply - Three Phase, Output supply - Three Phase

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

3

OEM Avg. Turnover

3

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

SITC of 40 kVA Online UPS - Input supply - Three Phase, Output supply - Three Phase , SITC of 6 kVA Online UPS - Input supply - Single Phase, Output Supply - Single Phase , Dismantling of existing 40 kVA UPS - 02 Nos. and 5 kVA UPS - 01 No. including disconnection of all connections and shifting the same , Comprehensive Maintenance of UPS 2 nos 40 KVA UPS , Comprehensive Maintenance of UPS 1 nos 6 KVA UPS

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

36

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Jaipur

Delivery Pincodes

302001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Satish Chand Jain302001,Q No. R2 & R4 Type 4, P & T Colony C-Scheme, JaipurJaipurRajasthan302001260-

Authority Records

MINISTRY OF COMMUNICATIONSTELECOMMUNICATIONS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9717560.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

SITC of 40 kVA Online UPS - Input supply - Three Phase, Output supply - Three Phase

Supply, installation, testing and commissioning of Following capacity, suitable for Three Phase input, Three Phase output AC Supply, Online Double Conversion UPS unit (without battery bank) , having IGBT based charger with smart battery management, DSP control Technology, 415 V, 3-phase pure sine wave output and having features of active parallel N+1 redundancy for simultaneous load sharing, including paralleling kit and signal interconnecting cable for parallel redundancy, True Inbuilt Galvanic Isolation Transformer, in-built maintenance bypass switch, audio alarms with LED indication, LCD display, DC cable from Battery bank to UPS unit, protection DC Circuit breaker, HRC fuses etc. as per attached specification complete as required.

2 each Delivery: 60 days
#2

SITC of 6 kVA Online UPS - Input supply - Single Phase, Output Supply - Single Phase

Supplying, installation, Testing & Commissioning of Following capacity ONLINE Uninterrupted Power Supply (UPS) system suitable for Single Phase input, Single Phase output AC Supply.The UPS shall include a Rectifier, inverter and Static Bypass switch alongwith provision for manual bypass, suitable isolation transformer for additional protection against neutral faults etc. audio alarms with LED indication, LCD display, DC cable from Battery bank to UPS unit, protection DC Circuit breaker, HRC fuses etc. as per attached specification complete as required. Supply.The UPS shall include a Rectifier, inverter and Static Bypass switch alongwith provision for manual bypass, suitable isolation transformer for additional protection against neutral faults etc.

1 each Delivery: 60 days
#3

Dismantling of existing 40 kVA UPS - 02 Nos. and 5 kVA UPS - 01 No. including disconnection of all connections and shifting the same

Dismantling of existing 40 kVA UPS - 02 Nos. and 5 kVA UPS - 01 No. i/c disconnection of all connections and shifting the same in same campus as directed by E-in-C etc. complete as required.

1 job Delivery: 60 days
#4

Comprehensive Maintenance of UPS 2 nos 40 KVA UPS

Comprehensive Maintenance of UPS 2 nos 40 KVA UPS (Details of UPS as in item 1 A)

24 month Delivery: 730 days
#5

Comprehensive Maintenance of UPS 1 nos 6 KVA UPS

Comprehensive Maintenance of UPS 1 nos 6 KVA UPS (Details of UPS as in item 2 A)

24 month Delivery: 730 days

Categories 48

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer