Progress
Public procurement opportunity for Bharat Sanchar Nigam Limited Portal(bsnl) SITC of 40 kVA Online UPS - Input supply - Three Phase, Output supply - Three Phase, SITC of 6 kVA Online UPS - Input supply - Single Phase, Output Supply - Single Phase, Dismantling of existing 40 kVA UPS - 02 Nos. and 5 kVA UPS - 01 No. including disconnection of all connections and shifting the same, Comprehensive Maintenance of UPS 2 nos 40 KVA UPS, Comprehensive Maintenance of UPS 1 nos 6 KVA UPS in JAIPUR, RAJASTHAN. Quantity: 52 issued by. Submission Deadline: 28-08-2026 15: 00: 00. View full details and respond.
Quantity
52
Category
SITC of 40 kVA Online UPS - Input supply - Three Phase, Output supply - Three Phase
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
3
OEM Avg. Turnover
3
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
SITC of 40 kVA Online UPS - Input supply - Three Phase, Output supply - Three Phase , SITC of 6 kVA Online UPS - Input supply - Single Phase, Output Supply - Single Phase , Dismantling of existing 40 kVA UPS - 02 Nos. and 5 kVA UPS - 01 No. including disconnection of all connections and shifting the same , Comprehensive Maintenance of UPS 2 nos 40 KVA UPS , Comprehensive Maintenance of UPS 1 nos 6 KVA UPS
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
36
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Jaipur
Delivery Pincodes
302001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Satish Chand Jain | 302001,Q No. R2 & R4 Type 4, P & T Colony C-Scheme, Jaipur | Jaipur | Rajasthan | 302001 | 2 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
SITC of 40 kVA Online UPS - Input supply - Three Phase, Output supply - Three Phase
Supply, installation, testing and commissioning of Following capacity, suitable for Three Phase input, Three Phase output AC Supply, Online Double Conversion UPS unit (without battery bank) , having IGBT based charger with smart battery management, DSP control Technology, 415 V, 3-phase pure sine wave output and having features of active parallel N+1 redundancy for simultaneous load sharing, including paralleling kit and signal interconnecting cable for parallel redundancy, True Inbuilt Galvanic Isolation Transformer, in-built maintenance bypass switch, audio alarms with LED indication, LCD display, DC cable from Battery bank to UPS unit, protection DC Circuit breaker, HRC fuses etc. as per attached specification complete as required.
SITC of 6 kVA Online UPS - Input supply - Single Phase, Output Supply - Single Phase
Supplying, installation, Testing & Commissioning of Following capacity ONLINE Uninterrupted Power Supply (UPS) system suitable for Single Phase input, Single Phase output AC Supply.The UPS shall include a Rectifier, inverter and Static Bypass switch alongwith provision for manual bypass, suitable isolation transformer for additional protection against neutral faults etc. audio alarms with LED indication, LCD display, DC cable from Battery bank to UPS unit, protection DC Circuit breaker, HRC fuses etc. as per attached specification complete as required. Supply.The UPS shall include a Rectifier, inverter and Static Bypass switch alongwith provision for manual bypass, suitable isolation transformer for additional protection against neutral faults etc.
Dismantling of existing 40 kVA UPS - 02 Nos. and 5 kVA UPS - 01 No. including disconnection of all connections and shifting the same
Dismantling of existing 40 kVA UPS - 02 Nos. and 5 kVA UPS - 01 No. i/c disconnection of all connections and shifting the same in same campus as directed by E-in-C etc. complete as required.
Comprehensive Maintenance of UPS 2 nos 40 KVA UPS
Comprehensive Maintenance of UPS 2 nos 40 KVA UPS (Details of UPS as in item 1 A)
Comprehensive Maintenance of UPS 1 nos 6 KVA UPS
Comprehensive Maintenance of UPS 1 nos 6 KVA UPS (Details of UPS as in item 2 A)
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SITC of 40 kVA Online UPS - Input supply - Three Phase, Output supply - Three Phase | Supply, installation, testing and commissioning of Following capacity, suitable for Three Phase input, Three Phase output AC Supply, Online Double Conversion UPS unit (without battery bank) , having IGBT based charger with smart battery management, DSP control Technology, 415 V, 3-phase pure sine wave output and having features of active parallel N+1 redundancy for simultaneous load sharing, including paralleling kit and signal interconnecting cable for parallel redundancy, True Inbuilt Galvanic Isolation Transformer, in-built maintenance bypass switch, audio alarms with LED indication, LCD display, DC cable from Battery bank to UPS unit, protection DC Circuit breaker, HRC fuses etc. as per attached specification complete as required. | 2 | each | satcj75@bsnl | 60 | |
| 2 | SITC of 6 kVA Online UPS - Input supply - Single Phase, Output Supply - Single Phase | Supplying, installation, Testing & Commissioning of Following capacity ONLINE Uninterrupted Power Supply (UPS) system suitable for Single Phase input, Single Phase output AC Supply.The UPS shall include a Rectifier, inverter and Static Bypass switch alongwith provision for manual bypass, suitable isolation transformer for additional protection against neutral faults etc. audio alarms with LED indication, LCD display, DC cable from Battery bank to UPS unit, protection DC Circuit breaker, HRC fuses etc. as per attached specification complete as required. Supply.The UPS shall include a Rectifier, inverter and Static Bypass switch alongwith provision for manual bypass, suitable isolation transformer for additional protection against neutral faults etc. | 1 | each | satcj75@bsnl | 60 | |
| 3 | Dismantling of existing 40 kVA UPS - 02 Nos. and 5 kVA UPS - 01 No. including disconnection of all connections and shifting the same | Dismantling of existing 40 kVA UPS - 02 Nos. and 5 kVA UPS - 01 No. i/c disconnection of all connections and shifting the same in same campus as directed by E-in-C etc. complete as required. | 1 | job | satcj75@bsnl | 60 | |
| 4 | Comprehensive Maintenance of UPS 2 nos 40 KVA UPS | Comprehensive Maintenance of UPS 2 nos 40 KVA UPS (Details of UPS as in item 1 A) | 24 | month | satcj75@bsnl | 730 | |
| 5 | Comprehensive Maintenance of UPS 1 nos 6 KVA UPS | Comprehensive Maintenance of UPS 1 nos 6 KVA UPS (Details of UPS as in item 2 A) | 24 | month | satcj75@bsnl | 730 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer