Bid Publish Date
30-May-2026, 12:37 pm
Bid End Date
10-Jun-2026, 1:00 pm
EMD
₹20,000
Value
₹19,41,100
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: Uttar Pradesh Power Corporation Limited (UPPCL) – Energy Department Uttar Pradesh. Product/Service: Operation and Maintenance of Substation with SCADA integration and associated works at the 132KV Sub Station Aligarh (v) under ETD-I, Aligarh. Estimated value: ₹1,941,100 with an EMD of ₹20,000. Location: Aligarh, Uttar Pradesh 202001. Tender covers SCADA integration and related substation O&M tasks; BOQ lists 0 items, indicating a possibly services-based package with flexible deliverables. Notable: ATC clause enabling up to 25% scope/duration modification, subject to contract issuance and provider consent.
Product/Service: Operation and Maintenance of 132KV Sub Station Aligarh with SCADA integration
Estimated value: ₹1,941,100
EMD: ₹20,000
Location: Aligarh, Uttar Pradesh
Scope: O&M and SCADA integration as per BOQ/ATC; no explicit itemized BOQ in data
Contract flexibility: up to 25% increase/decrease in quantity or duration
Documentation: ATC document and pdf BOQ attached by buyer
EMD must be submitted as ₹20,000 per tender terms
Contract scope may be adjusted up to 25% at contract issue or during execution
Refer to uploaded ATC and BOQ PDF for detailed technical/commercial terms
No explicit delivery timeline provided in data; confirm via ATC/BOQ
ATC references standard payment terms in the BOQ; ensure alignment with vendor contract after award
No fixed date provided; scope allows 25% variation in duration at contract issue and during execution
No explicit LD details in provided data; verify via ATC/BOQ in the attached documents
Experience in SCADA integration and substation O&M projects
Financial capability to undertake a project around ₹1.94 million
Compliance with GST, PAN, and relevant electrical sector standards
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Operation And Maintenance Of Substation - SCADA integration work and all other Associated work at 132KV Sub Station Aligarh- (v) under ETD-I, Aligarh
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
SCOPE_OF_WORK
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates in similar SCADA integration and O&M projects
Financial statements / balance sheets for past 2-3 years
EMD deposit proof (online/DD) of ₹20,000
Technical bid documents confirming capability to perform SCADA integration at 132KV substations
OEM authorizations or system integrator credentials related to SCADA platforms
Any certificates referenced in the ATC/BOQ attachment
| S.No | Seller | Date | Status |
|---|---|---|---|
| 1 | AR ELECTRICALS & HARDWARE Under PMA | 09-06-2026 20:55:51 | |
| 2 | exSel Corporation Under PMA | 09-06-2026 18:01:04 | |
| 3 | M/S TECHNOCRAT ELECTRICAL Under PMA | 07-06-2026 18:03:26 | |
| 4 | SARASWAT ELECTRICALS Under PMA | 07-06-2026 19:04:05 |
Key insights about UTTAR PRADESH tender market
Bidders must meet eligibility criteria for UP power projects, submit GST, PAN, experience certificates, and financials, and provide EMD of ₹20,000. Review the ATC and BOQ PDF attached by the buyer for scope and schedule. Ensure compliance with regional electrical standards and submit OEM authorizations as applicable.
Required documents include GST registration, PAN, 2-3 years of financial statements, experience certificates in SCADA/substation work, EMD proof of ₹20,000, technical bid detailing SCADA capabilities, and OEM authorizations or SI credentials per the ATC/BOQ.
No explicit itemized specs in BOQ; refer to the PDF BOQ and ATC uploaded by the buyer for detailed scope. Focus areas include SCADA integration, substation O&M capabilities, and adherence to UP electricity department procedures and safety standards.
Payment terms are defined in the ATC/BOQ documents; typical UP bids involve milestone-based payments or lump-sum with approvals. Verify the exact terms within the ATC attachment and ensure alignment before bid submission.
EMD is ₹20,000. Submit via online payment or demand draft as specified in the bidder terms. Attach EMD receipt or payment proof with the bid and reference the ATC/BOQ for submission method.
Buyer can increase/decrease contract quantity or duration up to 25% at contract issue; during execution, scope changes up to 25% are allowed with service provider consent for lumpsum contracts, as specified in the ATC.
Eligibility requires prior SCADA/substation maintenance experience, financial stability evidenced by statements, GST/PAN compliance, and relevant OEM SI credentials. Review the ATC and BOQ for any project-specific prerequisites.
Sign up now to access all documents
Main Document
SCOPE_OF_WORK
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS