TenderDekho Logo
Active GEM

Indian Army Hose & Spare Parts Tender Pune Maharashtra 2026 – OEM Turnover, Service Support & 2+ Years Experience

Bid Publish Date

11-Aug-2026, 7:56 pm

Bid End Date

09-Sep-2026, 9:00 am

Generate Docs

Progress

Issue11-Aug-2026, 7:56 pm
Corrigendum05-Sep-2026
AwardPending

Tender Overview

Organization: Indian Army (Department Of Military Affairs) seeking procurement of a broad range of mechanical and hydraulic spare parts and accessories including hoses, seals, levers, relays, bulbs, wipers, mirrors, clamps, fittings, and related hardware for field equipment. Location: Pune, Maharashtra 410301. Product Category: 68-item catalog spanning hose assemblies, fittings, valve components, battery leads, electrical and mechanical latches, light assemblies, and related small components. Estimated Value: Not disclosed; EMD not specified in public data. Delivery/Installation: Delivery to 108 Engineer Regiment, CME Campus, Dapodi, Pune. A key differentiator is the requirement for OEM turnover alignment and formal service support escalation details. The tender emphasizes compliance with vendor financials and government procurement norms, with a focus on suppliers who have prior government supply experience.

Technical Specifications & Requirements

  • No itemized technical specs are published; bidders must interpret BOQ 68-line scope from the catalog, with emphasis on mechanical and electrical components for military equipment.
  • Requirements extracted from terms include: OEM turnover criteria (last 3 years), minimum average annual turnover, and documentary evidence via audited balance sheets or CA certificates; bidder must upload GSTIN, PAN, cancelled cheque, EFT mandate; service support escalation matrix and toll-free support number are required.
  • Delivery location and commissioning, if applicable, to 108 Engineer Regiment, Pune. Experience criteria require two years of regular manufacturing and supply to government entities for similar category products.

Terms, Conditions & Eligibility

  • EMD/Financials: Not explicitly disclosed; turnover criteria apply for bidder and OEM; provide last 3 years audited statements or CA certificate; if company <3 years, use post-constitution years for turnover.
  • Documents: PAN, GSTIN, cancelled cheque, EFT mandate; OEM authorizations and proof of existing government contracts recommended; copies of relevant turnover certificates.
  • Experience: Minimum 2 years of government sector supply of same/similar category products; prior contracts to be submitted with bid.
  • Service Support: Escalation matrix with telephone numbers; dedicated toll-free service line required; rate contract considerations apply.

Key Specifications

  • Total Items: 68

  • Categories: Hose, Seals, Handles, Light & Electrical components, Wiper systems, Relays, Pins, Nuts & Bolts, Radiator parts, Mirrors, Clamps, Petty fittings

  • Delivery location: 108 Engineer Regiment, CME Campus, Dapodi, Pune

  • Experience: 2 years of regular manufacturing/supply to Central/State Govt or PSU for similar products

  • Financials: Last 3 years' turnover evidence; OEM turnover criteria to be met

  • Service: Escalation matrix and toll-free service line required

Terms & Conditions

  • EMD details not disclosed in data; bidders must meet turnover-based eligibility

  • Bidder and OEM turnover to be supported by audited statements or CA certificate

  • Two years of government procurement experience for similar items required

  • GSTIN, PAN, cancelled cheque, EFT mandate must be submitted

Important Clauses

Payment Terms

Not explicitly stated in available data; bidders should assume standard government terms requiring invoicing with delivery verification and 30-45 day payment windows as per SCM policy.

Delivery Schedule

Delivery to 108 Engineer Regiment, Pune; commissioning if included in scope to be executed at the same address.

Penalties/Liquidated Damages

Not specified; standard L.D. norms may apply for delays in delivery or non-conformance per contracts.

Bidder Eligibility

  • Minimum average annual turnover as per bid document for last 3 years

  • 2+ years of government/PSU procurement experience for similar items

  • OEM or authorized dealer with documented turnover and service support capabilities

Tender Data

Bid Details

Quantity

381

Category

Hose

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

6

Past Performance

30 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Hose , Jack Cyl Seal Kit , Stainer , Handle RH , Handle LH , Lock Handle with Key , Locking Handle , Working Light , Wiper Motor , Wiper Arm , Wiper Blade , Battery Lead Plus , Batter Lead Minus , Warning Light , Working Light Switch , Bulb Instrument , Fuse 5 Amp , Hand Clutch , Rubber Stabilizer Pad , Loader Frame Bush , Fwd or Rev Relay , Pin Lock Nut Bolt , Accelerator Cable , Bucket Bush , Shim Plate , Grease Nipple , Grease Nipple L Type , Tie Rod , Radiator Cap , Fan Switch , Mirror Left Side , Mirror Right Side , Bucket Tooth Nut , Bucket Tooth Bolt , Side Cutter Bolt , Steering Hyd Pipe , Bearing , Hose Clamp , Water Separator , Relay 12 V , Fuel Pipe , Operation Lever Knob , Pre-cleaner Jar , Cabin Light , Indicator Light , Solenoid Switch , Oil Seal Kit , Stud Nut Bolt , Benjo Washer 19 , Puncture Patch Small , Puncture Patch Medium , Tube Valve , DC Wire , Radiator Hose , Washer Rebound , Pin Pivot , Relay Flasher , Gaiter Lever , Clip Worm Drive , Cap Fuel Tank , Bolt 31 , Knob Assy with Switch , Strut Gas Door , Fuel Pump Lift , Adaptor , Tooth Bucket , Tooth Nut and Bolt , Bonnet Lock Assy

Pre-Bid & Qualification

Pre-Bid Date

17-08-2026 09:00:00

Pre-Bid Venue

108 Engineer Regiment, CME Campus, Dapodi, Pune, Maharashtra-411031

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Pune

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PunePune--815-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9742331.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

3 Updates
#1

Update

05-Sep-2026

Extended Deadline

09-Sep-2026, 3:30 am

Opening Date

10-Sep-2026, 3:30 am

#2

Update

22-Aug-2026

Extended Deadline

26-Aug-2026, 6:30 am

Opening Date

26-Aug-2026, 7:00 am

#3

Update

22-Aug-2026

Extended Deadline

25-Aug-2026, 3:30 am

Opening Date

25-Aug-2026, 4:00 am

Bill of Quantities (BOQ) 68 Items Sign in for GEM prices

#1

Hose

Hose

8 nos Delivery: 15 days
#2

Jack Cyl Seal Kit

Jack Cyl Seal Kit

4 nos Delivery: 15 days
#3

Stainer

Stainer

3 nos Delivery: 15 days
#4

Handle RH

Handle RH

3 nos Delivery: 15 days
#5

Handle LH

Handle LH

3 nos Delivery: 15 days
#6

Lock Handle with Key

Lock Handle with Key

3 nos Delivery: 15 days
#7

Locking Handle

Locking Handle

3 nos Delivery: 15 days
#8

Working Light

Working Light

4 nos Delivery: 15 days
#9

Wiper Motor

Wiper Motor

3 nos Delivery: 15 days
#10

Wiper Arm

Wiper Arm

3 nos Delivery: 15 days
#11

Wiper Blade

Wiper Blade

3 nos Delivery: 15 days
#12

Battery Lead Plus

Battery Lead Plus

3 nos Delivery: 15 days
#13

Batter Lead Minus

Batter Lead Minus

3 nos Delivery: 15 days
#14

Warning Light

Warning Light

3 nos Delivery: 15 days
#15

Working Light Switch

Working Light Switch

4 nos Delivery: 15 days
#16

Bulb Instrument

Bulb Instrument

4 nos Delivery: 15 days
#17

Fuse 5 Amp

Fuse 5 Amp

8 nos Delivery: 15 days
#18

Hand Clutch

Hand Clutch

2 nos Delivery: 15 days
#19

Rubber Stabilizer Pad

Rubber Stabilizer Pad

4 nos Delivery: 15 days
#20

Loader Frame Bush

Loader Frame Bush

6 nos Delivery: 15 days
#21

Fwd or Rev Relay

Fwd or Rev Relay

6 nos Delivery: 15 days
#22

Pin Lock Nut Bolt

Pin Lock Nut Bolt

8 nos Delivery: 15 days
#23

Accelerator Cable

Accelerator Cable

3 nos Delivery: 15 days
#24

Bucket Bush

Bucket Bush

3 nos Delivery: 15 days
#25

Shim Plate

Shim Plate

8 nos Delivery: 15 days
#26

Grease Nipple

Grease Nipple

15 nos Delivery: 15 days
#27

Grease Nipple L Type

Grease Nipple L Type

15 nos Delivery: 15 days
#28

Tie Rod

Tie Rod

3 nos Delivery: 15 days
#29

Radiator Cap

Radiator Cap

2 nos Delivery: 15 days
#30

Fan Switch

Fan Switch

3 nos Delivery: 15 days
#31

Mirror Left Side

Mirror Left Side

3 nos Delivery: 15 days
#32

Mirror Right Side

Mirror Right Side

3 nos Delivery: 15 days
#33

Bucket Tooth Nut

Bucket Tooth Nut

15 nos Delivery: 15 days
#34

Bucket Tooth Bolt

Bucket Tooth Bolt

14 nos Delivery: 15 days
#35

Side Cutter Bolt

Side Cutter Bolt

5 nos Delivery: 15 days
#36

Steering Hyd Pipe

Steering Hyd Pipe

2 nos Delivery: 15 days
#37

Bearing

Bearing

6 nos Delivery: 15 days
#38

Hose Clamp

Hose Clamp

14 nos Delivery: 15 days
#39

Water Separator

Water Separator

2 nos Delivery: 15 days
#40

Relay 12 V

Relay 12 V

4 nos Delivery: 15 days
#41

Fuel Pipe

Fuel Pipe

2 nos Delivery: 15 days
#42

Operation Lever Knob

Operation Lever Knob

4 nos Delivery: 15 days
#43

Pre-cleaner Jar

Pre-cleaner Jar

2 nos Delivery: 15 days
#44

Cabin Light

Cabin Light

3 nos Delivery: 15 days
#45

Indicator Light

Indicator Light

4 nos Delivery: 15 days
#46

Solenoid Switch

Solenoid Switch

2 nos Delivery: 15 days
#47

Oil Seal Kit

Oil Seal Kit

3 nos Delivery: 15 days
#48

Stud Nut Bolt

Stud Nut Bolt

16 nos Delivery: 15 days
#49

Benjo Washer 19

Benjo Washer 19

10 nos Delivery: 15 days
#50

Puncture Patch Small

Puncture Patch Small

5 nos Delivery: 15 days
#51

Puncture Patch Medium

Puncture Patch Medium

5 nos Delivery: 15 days
#52

Tube Valve

Tube Valve

6 nos Delivery: 15 days
#53

DC Wire

DC Wire

3 nos Delivery: 15 days
#54

Radiator Hose

Radiator Hose

3 nos Delivery: 15 days
#55

Washer Rebound

Washer Rebound

10 nos Delivery: 15 days
#56

Pin Pivot

Pin Pivot

6 nos Delivery: 15 days
#57

Relay Flasher

Relay Flasher

6 nos Delivery: 15 days
#58

Gaiter Lever

Gaiter Lever

6 nos Delivery: 15 days
#59

Clip Worm Drive

Clip Worm Drive

10 nos Delivery: 15 days
#60

Cap Fuel Tank

Cap Fuel Tank

3 nos Delivery: 15 days
#61

Bolt 31

Bolt 31

10 nos Delivery: 15 days
#62

Knob Assy with Switch

Knob Assy with Switch

3 nos Delivery: 15 days
#63

Strut Gas Door

Strut Gas Door

6 nos Delivery: 15 days
#64

Fuel Pump Lift

Fuel Pump Lift

3 nos Delivery: 15 days
#65

Adaptor

Adaptor

6 nos Delivery: 15 days
#66

Tooth Bucket

Tooth Bucket

10 nos Delivery: 15 days
#67

Tooth Nut and Bolt

Tooth Nut and Bolt

20 nos Delivery: 15 days
#68

Bonnet Lock Assy

Bonnet Lock Assy

3 nos Delivery: 15 days

Categories 53

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Cancelled cheque

4

EFT mandate (bank certified)

5

Audited balance sheets or CA certificate for turnover (last 3 years)

6

OEM authorization (if bidding as OEM or through reseller)

7

Proof of government/higher-education or PSUs contract for similar category (2+ years)

8

Escalation matrix for service support

9

Dedicated/toll-free service contact details

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for hose and spare parts tender in Pune 2026 Indian Army?

Bidders should meet the turnover criteria for last 3 years via audited balance sheets or CA certificate, provide GSTIN, PAN, cancelled cheque, EFT mandate, OEM authorization if applicable, and demonstrate at least 2 years of government/PSU supply experience for similar items. Ensure service support escalation matrix is provided.

What documents are required for Indian Army Pune procurement 2026?

Required documents include GST certificate, PAN card, cancelled cheque, EFT mandate, turnover proof for 3 years, OEM authorization (if applicable), and evidence of government/PSU contracts. Also submit Escalation Matrix and dedicated toll-free support details, along with any other certificates requested in the bid.

What are the delivery requirements for 108 Engineer Regiment Pune?

Delivery must be to 108 Engineer Regiment, CME Campus, Dapodi, Pune, Maharashtra. Installation and commissioning, if in scope, should occur at the same location, with delivery timelines aligning to the contract schedule and acceptance testing as per notified terms.

What is the experience expectation for bidders on government spares tenders in Maharashtra?

Bidders must demonstrate at least 2 years of regular manufacturing and supply experience of similar category products to Central/State Govt/PSU, with copies of relevant contracts provided with the bid. Turnover criteria apply for both bidder and OEM.

What service support requirements are specified for this Pune tender?

Bidders must provide an escalation matrix with telephone numbers for service support and a dedicated/toll-free number. This ensures responsive after-sales support and aligns with OEM/service commitments in government procurement.

Are there any standards or certifications required for components in this tender?

While specific standards like IS 550 or ISI are not listed in the published data, bidders should verify applicable standards listed in the bid document and be prepared to demonstrate conformity via certificates or test reports for mechanical and electrical components included in the 68-item BOQ.

How is the OEM turnover criterion applied in case of bunch bids?

For bunch bids, the OEM of the primary product category with the highest bid value must meet the OEM turnover criterion as stated in the bid document, with turnover evidence provided via audited statements or CA certificates.

What happens if a bidder lacks 3-year turnover data at bid time?

If the bidder is less than 3 years old, the average turnover should be calculated from completed financial years after incorporation, and must be supported by CA/certified statements. Lack of turnover documentation may disqualify the bid.