TenderDekho Logo
Closed GEM

Invitation to Bid - Non Skid Floor Tiles 300 mm x 300 mm for bathroom,Wall Tiles 450 mm x 300 mm for bathroom,Solid PVC in LOHIT, ARUNACHAL PRADESH

Bid Publish Date

29-Aug-2025, 10:58 am

Bid End Date

13-Sep-2025, 11:00 am

EMD

₹43,000

Progress

RA
Issue29-Aug-2025, 10:58 am
Reverse Auction26-Sep-2025, 6:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

7772

Category

Non Skid Floor Tiles 300 mm x 300 mm for bathroom

Bid Type

Two Packet Bid

Categories 107

Public procurement opportunity for Border Road Organisation Non Skid Floor Tiles 300 mm x 300 mm for bathroom, Wall Tiles 450 mm x 300 mm for bathroom, Solid PVC in LOHIT, ARUNACHAL PRADESH. Quantity: 7772 issued by. Submission Deadline: 13-09-2025 11: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENTBORDER ROADS ORGANISATION

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8234249.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 143 Items Sign in for GEM prices

#1

Non Skid Floor Tiles 300 mm x 300 mm for bathroom

Non Skid Floor Tiles 300 mm x 300 mm for bathroom

20 sqm Delivery: 30 days
#2

Wall Tiles 450 mm x 300 mm for bathroom

Wall Tiles 450 mm x 300 mm for bathroom

400 sqft Delivery: 30 days
#3

Solid PVC doors for Bathrooms 32 inch with Frame and all accessories

Solid PVC doors for Bathrooms 32 inch with Frame and all accessories

5 nos Delivery: 30 days
#4

Mason Thread

Mason Thread

50 roll Delivery: 30 days
#5

Tiles Cleaner 1 Ltr

Tiles Cleaner 1 Ltr

50 pack Delivery: 30 days
#6

Toilet cleaner 1 ltr

Toilet cleaner 1 ltr

20 pack Delivery: 30 days
#7

Bear proof lock

Bear proof lock

10 nos Delivery: 30 days
#8

Hacksaw blade

Hacksaw blade

100 nos Delivery: 30 days
#9

Europian type W C with complete set with ISI mark

Europian type W C with complete set with ISI mark

5 nos Delivery: 30 days
#10

Floor trap 4 inch with hole

Floor trap 4 inch with hole

15 nos Delivery: 30 days
#11

Wall hang Cistern with long bend with gasket

Wall hang Cistern with long bend with gasket

10 nos Delivery: 30 days
#12

SS Sink 20 x 22 inch with Coupling

SS Sink 20 x 22 inch with Coupling

6 nos Delivery: 30 days
#13

SS Towel Rod 2 feet long

SS Towel Rod 2 feet long

20 nos Delivery: 30 days
#14

SS Towel Ring

SS Towel Ring

6 nos Delivery: 30 days
#15

CP Flange

CP Flange

60 nos Delivery: 30 days
#16

Wash Basain with stand

Wash Basain with stand

8 nos Delivery: 30 days
#17

CP extension nipple 2 inch

CP extension nipple 2 inch

10 nos Delivery: 30 days
#18

CP extension nipple 1 pt 5 inch

CP extension nipple 1 pt 5 inch

30 nos Delivery: 30 days
#19

CP extension nipple 1 inch

CP extension nipple 1 inch

40 nos Delivery: 30 days
#20

PVC waste pipe for wash basin

PVC waste pipe for wash basin

60 nos Delivery: 30 days
#21

PVC connection pipe 24 inch

PVC connection pipe 24 inch

30 nos Delivery: 30 days
#22

CP connection pipe 24 inch

CP connection pipe 24 inch

20 nos Delivery: 30 days
#23

CP Hex Nipple half inch

CP Hex Nipple half inch

20 nos Delivery: 30 days
#24

PVC connection pipe Male Female end for Basin Mixture

PVC connection pipe Male Female end for Basin Mixture

30 nos Delivery: 30 days
#25

PVC Elbow 50 mm

PVC Elbow 50 mm

20 nos Delivery: 30 days
#26

PVC Elbow 63 mm

PVC Elbow 63 mm

30 nos Delivery: 30 days
#27

PVC Tee 63 mm

PVC Tee 63 mm

30 nos Delivery: 30 days
#28

PVC Elbow 90 mm

PVC Elbow 90 mm

30 nos Delivery: 30 days
#29

PVC Tee 90 mm

PVC Tee 90 mm

30 nos Delivery: 30 days
#30

PVC Elbow 110 mm

PVC Elbow 110 mm

60 nos Delivery: 30 days
#31

PVC Socket 110 mm

PVC Socket 110 mm

60 nos Delivery: 30 days
#32

PVC Reducer Socket 110 oblique 75 mm

PVC Reducer Socket 110 oblique 75 mm

25 nos Delivery: 30 days
#33

Taflon tape

Taflon tape

40 roll Delivery: 30 days
#34

CP Flange 1 inch

CP Flange 1 inch

20 nos Delivery: 30 days
#35

Wall mixer 3 in 1

Wall mixer 3 in 1

3 nos Delivery: 30 days
#36

Shower 6 inch with Arm 18 inch long

Shower 6 inch with Arm 18 inch long

2 nos Delivery: 30 days
#37

Health faucet with 8 mm dia 1 pt 2 mtr long flexible tube and wall hook

Health faucet with 8 mm dia 1 pt 2 mtr long flexible tube and wall hook

15 nos Delivery: 30 days
#38

Brass Float Valve with Float

Brass Float Valve with Float

60 nos Delivery: 30 days
#39

PVC Cowl 110 mm

PVC Cowl 110 mm

20 nos Delivery: 30 days
#40

Butter fly clamp

Butter fly clamp

50 nos Delivery: 30 days
#41

Garden Pipe

Garden Pipe

120 mtr Delivery: 30 days
#42

PVC Cowl 90 mm

PVC Cowl 90 mm

20 nos Delivery: 30 days
#43

UPVC Elbow 2 inch

UPVC Elbow 2 inch

60 nos Delivery: 30 days
#44

UPVC FAPT 2 inch

UPVC FAPT 2 inch

30 nos Delivery: 30 days
#45

UPVC Tank Nipple 2 inch

UPVC Tank Nipple 2 inch

15 nos Delivery: 30 days
#46

UPVC Union 2 inch

UPVC Union 2 inch

40 nos Delivery: 30 days
#47

UPVC FABT 3 by 4 inch x half inch

UPVC FABT 3 by 4 inch x half inch

20 nos Delivery: 30 days
#48

UPVC 2 oblique 1 inch Reducer Socket

UPVC 2 oblique 1 inch Reducer Socket

40 nos Delivery: 30 days
#49

UPVC Brass Tee half inch

UPVC Brass Tee half inch

40 nos Delivery: 30 days
#50

UPVC Nail clamp 1 inch

UPVC Nail clamp 1 inch

50 nos Delivery: 30 days
#51

UPVC Elbow 3 by 4 inch

UPVC Elbow 3 by 4 inch

40 nos Delivery: 30 days
#52

UPVC Elbow half inch

UPVC Elbow half inch

50 nos Delivery: 30 days
#53

UPVC Union 1 inch

UPVC Union 1 inch

30 nos Delivery: 30 days
#54

UPVC Pipe half inch 3 Mtr long

UPVC Pipe half inch 3 Mtr long

30 nos Delivery: 30 days
#55

UPVC FABT half inch

UPVC FABT half inch

30 nos Delivery: 30 days
#56

UPVC Brass Elbow half inch

UPVC Brass Elbow half inch

30 nos Delivery: 30 days
#57

UPVC Nail clamp half inch

UPVC Nail clamp half inch

100 nos Delivery: 30 days
#58

UPVC Nail clamp 3 by 4 inch

UPVC Nail clamp 3 by 4 inch

50 nos Delivery: 30 days
#59

UPVC Bushing 2 inch x 1 and half inch

UPVC Bushing 2 inch x 1 and half inch

20 nos Delivery: 30 days
#60

UPVC MAPT 3 by 4 inch

UPVC MAPT 3 by 4 inch

20 nos Delivery: 30 days
#61

UPVC Ball Valve 3 by 4 inch

UPVC Ball Valve 3 by 4 inch

5 nos Delivery: 30 days
#62

Fastner Volt for wash basin fixing

Fastner Volt for wash basin fixing

15 set Delivery: 30 days
#63

CPVC Elbow 1 and half inch

CPVC Elbow 1 and half inch

10 nos Delivery: 30 days
#64

CPVC Tee 1 and half inch

CPVC Tee 1 and half inch

10 nos Delivery: 30 days
#65

CPVC Socket 1 and half inch

CPVC Socket 1 and half inch

10 nos Delivery: 30 days
#66

CPVC Nail clamp 3 by 4 inch

CPVC Nail clamp 3 by 4 inch

40 nos Delivery: 30 days
#67

CPVC FAPT 3 by 4 x half inch

CPVC FAPT 3 by 4 x half inch

30 nos Delivery: 30 days
#68

CPVC Nail clamp 1 inch

CPVC Nail clamp 1 inch

50 nos Delivery: 30 days
#69

CPVC Elbow 3 by 4 inch

CPVC Elbow 3 by 4 inch

200 nos Delivery: 30 days
#70

G I Socket half inch

G I Socket half inch

20 nos Delivery: 30 days
#71

G I Tee half inch

G I Tee half inch

20 nos Delivery: 30 days
#72

G I Nipple half inch x 6 inch

G I Nipple half inch x 6 inch

10 nos Delivery: 30 days
#73

G I Nipple half inch x 4 inch

G I Nipple half inch x 4 inch

10 nos Delivery: 30 days
#74

G I Nipple half inch x 2 inch

G I Nipple half inch x 2 inch

10 nos Delivery: 30 days
#75

G I Union half inch

G I Union half inch

10 nos Delivery: 30 days
#76

G I Elbow half inch

G I Elbow half inch

20 nos Delivery: 30 days
#77

Electric Wire Copper 1 Sqmm 90 Mtr with ISI mark

Electric Wire Copper 1 Sqmm 90 Mtr with ISI mark

4 roll Delivery: 30 days
#78

Led Bulb 12 Watt yellow Colour

Led Bulb 12 Watt yellow Colour

40 nos Delivery: 30 days
#79

Led Ceiling Light Pannel Type Round Shape 12 Watt yellow Colour

Led Ceiling Light Pannel Type Round Shape 12 Watt yellow Colour

20 nos Delivery: 30 days
#80

Socket 05 Amp

Socket 05 Amp

40 nos Delivery: 30 days
#81

Switch Socket Combind 16 Amp

Switch Socket Combind 16 Amp

30 nos Delivery: 30 days
#82

Call Bell

Call Bell

10 nos Delivery: 30 days
#83

Electric Fan Regulator

Electric Fan Regulator

30 nos Delivery: 30 days
#84

Batten Holder

Batten Holder

20 nos Delivery: 30 days
#85

Pendent Holder

Pendent Holder

20 nos Delivery: 30 days
#86

MCB 32 amp with ISI mark

MCB 32 amp with ISI mark

15 nos Delivery: 30 days
#87

MCB 32 amp double with ISI mark

MCB 32 amp double with ISI mark

15 nos Delivery: 30 days
#88

MCB 10 Amp with ISI mark

MCB 10 Amp with ISI mark

25 nos Delivery: 30 days
#89

PVC Switch board 6 inch x 4 inch

PVC Switch board 6 inch x 4 inch

40 nos Delivery: 30 days
#90

PVC Switch board 8 inch x 6 inch

PVC Switch board 8 inch x 6 inch

30 nos Delivery: 30 days
#91

Electric Wire Aluminium 10 Sqmm 2 Core BTC Wire 90 Mtr

Electric Wire Aluminium 10 Sqmm 2 Core BTC Wire 90 Mtr

5 roll Delivery: 30 days
#92

Electric Wire Aluminium 25 Sqmm single core BTC Wire 90 Mtr

Electric Wire Aluminium 25 Sqmm single core BTC Wire 90 Mtr

4 roll Delivery: 30 days
#93

Fan Capacitor 2 pt 5 MFD

Fan Capacitor 2 pt 5 MFD

80 nos Delivery: 30 days
#94

Changing of Current LED Driver 30 W

Changing of Current LED Driver 30 W

6 nos Delivery: 30 days
#95

Casing Caping 1 inch x 2 mtr

Casing Caping 1 inch x 2 mtr

80 nos Delivery: 30 days
#96

LED Street light 60 wt

LED Street light 60 wt

10 nos Delivery: 30 days
#97

PVC Conduit Pipe 25 mm dia 3 Mtr long

PVC Conduit Pipe 25 mm dia 3 Mtr long

80 nos Delivery: 30 days
#98

PVC Conduit Bend 25 mm

PVC Conduit Bend 25 mm

30 nos Delivery: 30 days
#99

Globe light with Holder

Globe light with Holder

20 nos Delivery: 30 days
#100

Tube Rod 4 feet Long

Tube Rod 4 feet Long

20 nos Delivery: 30 days
#101

Chena Screw 4mm or 6mm or 8mm

Chena Screw 4mm or 6mm or 8mm

10 pkt Delivery: 30 days
#102

HRC Fuse Base Plate 630 Amp

HRC Fuse Base Plate 630 Amp

3 nos Delivery: 30 days
#103

Zero power LED bulb

Zero power LED bulb

25 nos Delivery: 30 days
#104

Plywood 8 feet x 4 feet x 6 mm with ISI mark

Plywood 8 feet x 4 feet x 6 mm with ISI mark

640 sqft Delivery: 30 days
#105

Plywood 8 feet x 4 feet x12 mm with ISI mark

Plywood 8 feet x 4 feet x12 mm with ISI mark

640 sqft Delivery: 30 days
#106

Plywood 8 feet x 4 feet x 19mm with ISI mark

Plywood 8 feet x 4 feet x 19mm with ISI mark

320 sqft Delivery: 30 days
#107

Looking Mirror 1 pt 5 feet x 2 feet

Looking Mirror 1 pt 5 feet x 2 feet

15 nos Delivery: 30 days
#108

Self-drill screw 2 inch

Self-drill screw 2 inch

10 pkt Delivery: 30 days
#109

Self-drill screw 3 inch

Self-drill screw 3 inch

10 pkt Delivery: 30 days
#110

Handel Wooden Screw 1 inch full thread

Handel Wooden Screw 1 inch full thread

10 pkt Delivery: 30 days
#111

Headless pannel pin 1 inch

Headless pannel pin 1 inch

5 pkt Delivery: 30 days
#112

Hinges 3 inch SS

Hinges 3 inch SS

60 nos Delivery: 30 days
#113

Screw for Sliding bolt

Screw for Sliding bolt

10 pkt Delivery: 30 days
#114

Screw for Gypsum Board 1 inch

Screw for Gypsum Board 1 inch

5 pkt Delivery: 30 days
#115

Screw for Cabinet Handel

Screw for Cabinet Handel

2 pkt Delivery: 30 days
#116

Door Closer Hydraulic

Door Closer Hydraulic

20 nos Delivery: 30 days
#117

Cutting wheel 105 mm Norton champ

Cutting wheel 105 mm Norton champ

250 nos Delivery: 30 days
#118

Wood Cutting Blade 4 Inch

Wood Cutting Blade 4 Inch

20 nos Delivery: 30 days
#119

Tile cutter blade 4 inch

Tile cutter blade 4 inch

30 nos Delivery: 30 days
#120

Vinyl Sheet for Flooring Area 40 Sqm

Vinyl Sheet for Flooring Area 40 Sqm

430 sqft Delivery: 30 days
#121

Daimond Glass Cutter

Daimond Glass Cutter

5 nos Delivery: 30 days
#122

Hinges 4 inch

Hinges 4 inch

60 nos Delivery: 30 days
#123

Red Oxide Primer

Red Oxide Primer

40 ltr Delivery: 30 days
#124

Exterior or Interior Paint white colour

Exterior or Interior Paint white colour

100 ltr Delivery: 30 days
#125

Oil bound distemper white with ISI mark

Oil bound distemper white with ISI mark

100 lit Delivery: 30 days
#126

Paint Enamal Sky Blue with ISI mark

Paint Enamal Sky Blue with ISI mark

40 ltr Delivery: 30 days
#127

Paint Enamel White with ISI mark

Paint Enamel White with ISI mark

60 ltr Delivery: 30 days
#128

Paint Enamel PO Red 4 Ltr each drum with ISI mark

Paint Enamel PO Red 4 Ltr each drum with ISI mark

30 ltr Delivery: 30 days
#129

Paint Enamel Yellow with ISI mark

Paint Enamel Yellow with ISI mark

40 ltr Delivery: 30 days
#130

Golden Paint 200 ml Pack with ISI mark

Golden Paint 200 ml Pack with ISI mark

1 ltr Delivery: 30 days
#131

Snowcem Brick Red

Snowcem Brick Red

50 kg Delivery: 30 days
#132

POP

POP

20 kg Delivery: 30 days
#133

Wall Putty white

Wall Putty white

1,000 kg Delivery: 30 days
#134

Putty Appicator

Putty Appicator

10 nos Delivery: 30 days
#135

Painting Brush 1 inch

Painting Brush 1 inch

10 nos Delivery: 30 days
#136

Painting Brush 2 inch

Painting Brush 2 inch

10 nos Delivery: 30 days
#137

Painting Brush 3 inch

Painting Brush 3 inch

10 nos Delivery: 30 days
#138

Painting Brush 4 inch

Painting Brush 4 inch

10 nos Delivery: 30 days
#139

Painting Roller Brush

Painting Roller Brush

10 nos Delivery: 30 days
#140

Writing Brush

Writing Brush

2 set Delivery: 30 days
#141

White wash Brush

White wash Brush

50 nos Delivery: 30 days
#142

Wire Brush

Wire Brush

50 nos Delivery: 30 days
#143

Emery Paper 80 No

Emery Paper 80 No

50 mtr Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

26-Sep-2025, 6:00 pm

End

27-Sep-2025, 6:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.