Molded Case Circuit Breakers (MCCB) as per IS / IEC 60947,Molded Case Circuit Breakers (MCCB) as pe
Southern Railway
Bid Publish Date
05-Nov-2025, 6:44 pm
Bid End Date
03-Dec-2025, 7:00 pm
Value
₹3,49,243
Location
Progress
Quantity
97
Category
Molded Case Circuit Breakers (MCCB) as per IS / IEC 60947
Bid Type
Two Packet Bid
The South Eastern Coalfields Limited (SECL), under Coal India Limited, invites bids for IS/IEC 60947 compliant Molded Case Circuit Breakers (MCCB) for delivery in UMARIA, MADHYA PRADESH (PIN 484551). Estimated contract value is ₹349,243.04. Bidders must comply with GST rules, PAN, and GSTIN documentation; manufacturer authorization if bidding through distributors; and standard GST invoicing with consignee GSTIN. The scope emphasizes adherence to the IS/IEC 60947 family for MCCB products and related safety data provisions. Bid terms include an option to adjust quantity up to 25% at contract rates and extended delivery windows proportional to the quantity, with a minimum extension of 30 days. Unique clauses enforce hazardous-material handling and proper labeling standards during dispatch.
Key differentiators include the need for OEM authorization, non-toxic product assurances, and proper documentation packaging for GeM portal submission. The opportunity targets suppliers with MCCB lines meeting IS/IEC 60947, along with the ability to scale delivery while maintaining compliance with government invoicing requirements.
MCCB product under IS/IEC 60947 (Q3)
Delivery scope: up to 25% quantity augmentation at contract rates
Delivery period formula: (additional quantity ÷ original quantity) × original delivery period, min 30 days
Hazardous item labeling: MSDS, Batch No., MFG date, Gross/Net weight, shelf life
Invoicing: GSTIN of consignee; upload GST invoice and GST payment screenshot on GeM
Documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate; Manufacturer Authorization if applicable
Option to increase/decrease quantity up to 25% at contract delivery rates
GST compliance and invoicing must reflect consignee GSTIN
OEM authorization required for non-manufacturer bids and mandatory cert uploads
GST-based reimbursement as actuals or as per applicable rate; invoicing must reflect consignee GSTIN; GeM portal GST invoice upload and payment screenshot required
Delivery period calculated with option clause; extended delivery period only up to original term; minimum 30 days for any additional time
Penalties/LD applicable if delivery/quality terms are not met; specific LD rate not disclosed; ensure compliance with contract terms and schedule
Bidders with MCCB lines aligned to IS/IEC 60947 requirements
Manufacturer Authorization if bidding through a distributor
GST registered vendors with PAN and GSTIN credentials
Capability to deliver within extended delivery windows per option clause
Main Document
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Southern Railway
Bharat Heavy Electricals Limited (bhel)
Southern Railway
CHENNAI, TAMIL NADU
Indian Army
UDHAMPUR, JAMMU & KASHMIR
South Eastern Coalfields Limited
KORIYA, CHHATTISGARH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by bank
OEM Manufacturer Authorization (if bid through distributor)
GST invoice corresponding to consignee GSTIN
MSDS for hazardous materials (if applicable)
All certificates/documents sought in Bid Document, ATC and Corrigendum
Extended Deadline
03-Dec-2025, 7:00 pm
Opening Date
03-Dec-2025, 7:30 pm
Key insights about MADHYA PRADESH tender market
To bid, ensure IS/IEC 60947 MCCB alignment, provide PAN and GSTIN copies, and submit OEM authorization if bidding through a distributor. Include GST invoice details, EFT mandate, and MSDS if hazardous. Upload all required certificates per ATC and Corrigendum; ensure consignee GSTIN is correct on invoice.
Required documents include PAN card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, OEM authorization if applicable, and GST-compliant invoicing with consignee GSTIN. Additional certificates per ATC/Corrigendum must be uploaded before bid submission.
The tender targets IS/IEC 60947 compliant MCCBs (Q3). Bidders should ensure product meets IS/IEC 60947 family requirements and provide associated safety data materials. OEM authorization is required for non-manufacturer bids, and MSDS must be available for toxic items.
The purchaser can increase quantity by up to 25% at contract rates and extend delivery time proportionally, with a minimum extension of 30 days. Delivery terms apply from the last date of the original delivery order and may extend within the contracted rates.
GST is to be assessed by the bidder; reimbursement will be actuals or applicable rates, whichever is lower, capped to the quoted GST %. Invoices must be GST-compliant and raised in the consignee’s name with the consignee GSTIN.
If bidding via an Authorised Distributor, an OEM Authorization certificate detailing name, designation, address, email, and phone is required. This ensures traceability and conformity with IS/IEC 60947 MCCB products supplied to SECL.
For hazardous items, ensure MSDS, batch number, manufacturing date, and weights are printed on packaging. Proper transport and storage precautions must be followed per regulatory health/environment guidelines before dispatch.
Invoices must be generated on GeM with the consignee GSTIN; upload scanned GST invoice and the GST payment screenshot. This ensures proper GST tax credit and timely processing by SECL.
Sign up now to access all documents
Main Document
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS