Indian Army Baramulla wind and solar hybrid electrification tender 3.5 KVA 2026

Bid Publish Date

11-Sep-2026, 10:22 pm

Bid End Date

22-Sep-2026, 9:00 am

EMD

₹71,715

Value

₹23,90,500

Progress

RA
Issue11-Sep-2026, 10:22 pm
Reverse Auction13-Oct-2026, 3:00 pm
AwardPending

Key Highlights

  • • OEM certification requirement for installation/commissioning
  • • 3.5 KVA wind/solar hybrid electrification system scope
  • • EMD amount and estimated contract value provided
  • • Detailed Design Drawings due within 5 days of award; modification cycle within 5 days

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for supply, installation and testing & commissioning of a wind and solar hybrid electrification power plant of 3.5 KVA capacity, along with prefabricated earthing electrodes and accompanying electrical/connectivity hardware. Location: Baramulla, Jammu & Kashmir (193101). Estimated value: ₹2,390,500; EMD: ₹71,715. Scope includes GI pipes, earth pit components, aluminium strips, GI strips, copper lightning terminal, earth clamps, GI wires, earthing augur, PVC/MS piping, sand/aggregate, and related accessories. Key differentiator: integration of hybrid wind-solar system with earthing infrastructure and required user manual, tester set, and installation by OEM-certified personnel.

  • Emphasis on 3.5 KVA capacity wind/solar hybrid setup and comprehensive earthing assembly
  • Detailed design drawings to be approved by Buyer within 5 days of award; modifications cycle within 5 days; delay in approval extends delivery without LD
  • Installation at AOR of 19 Inf Div, Baramulla district; pre-approved drawings essential for supply
  • EMD and eligibility criteria enforced; OEM authorization and annual government project experience required
  • GST will be processed as actuals or applicable rates, subject to tender terms

Technical Specifications & Requirements

  • Scope items include: wind and solar hybrid electrification power plant (3.5 KVA), prefabricated earthing electrode (pipe-in-pipe), GI pipe (100 mm dia, medium grade), backfill compound, MS earth pit cover (30 cm x 30 cm), aluminium strip (25 x 3 mm, 9 m length), iron spikes (16 inch), GI strip (32 x 6 mm, 3 m), GI nipple (20 mm dia, 10 cm), GI reducer socket (40 x 20 mm), lightning terminal copper ball with five prongs (15 cm), MS clamp (25 x 3 mm) with nut and bolt, GI wire (12 gauge), earth augur, PVC pipe (3 m, 6 inch dia), user manual, tester set, GI pipe (40 mm dia, 6 m), natural sand, 20 mm aggregate, MS pipe (40 mm bore, 2 m long), 50 mm bore MS sleeve, crystalline conductive mixture, 220 V earthing insulator clamp (30 mm).
  • No explicit performance specs beyond item list; delivery/installations must align with approved drawings and buyer directions; OEM-certified installation/commissioning required

Terms, Conditions & Eligibility

  • EMD: ₹71,715; payment terms and GST handling as per tender terms
  • Experience: Bidder or OEM to demonstrate 3 years of regular supply/manufacture of similar government category products; primary product value in bunch bids must meet criterion
  • Design approval: Detailed Design Drawings due within 5 days of award; modifications list provided within 5 days; delay in approval may extend delivery window without LD
  • Installation/commissioning: To be performed by OEM-certified personnel or OEM-authorised reseller
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; End User format may be Buyer-provided; OEM authorization required for authorised distributors
  • Non-obsolescence: Offered products shall have at least 3 years of residual market life; not declared end-of-life by OEM before bid opening
  • Delivery location: AOR of 19 Inf Div, Baramulla; supply/installation as per buyer’s approved drawings
  • Warranty/maintenance terms: Not explicitly stated; implied through OEM certification and post-installation support requirements

Key Specifications

    • 3.5 KVA wind/solar hybrid electrification power plant
    • Prefabricated earthing electrode (pipe-in-pipe)
    • GI pipe 100 mm dia (medium grade)
    • MS earth pit cover 30 cm x 30 cm with handles
    • Aluminium strip 25 x 3 mm (9 m)
    • Iron spikes 16 inch long
    • GI strip 32 x 6 mm (3 m)
    • GI nipple 20 mm dia (10 cm)
    • GI reducer socket 40 x 20 mm
    • Lightning terminal copper ball (five prongs, 15 cm)
    • MS clamp 25 x 3 mm with nut & bolt
    • GI wire 12 gauge
    • Earth augur
    • PVC pipe 3 m long, 6 inch dia
    • Natural sand, aggregate 20 mm
    • MS pipe 40 mm bore, 2 m long
    • 50 mm bore MS pipe sleeve
    • Crystalline conductive mixture
    • 220 V earthing insulator clamp, 30 mm

Terms & Conditions

  • Detailed Design Drawings approval within 5 days; modifications within 5 days

  • OEM-certified installation/commissioning; authorised reseller if required

  • 3 years residual market life and non-obsolescence requirement

Important Clauses

Payment Terms

GST treatment on actuals or applicable rates; EMD refundable per terms; payment terms aligned with delivery and acceptance

Delivery Schedule

Delivery timeline tied to drawing approvals; delay in approval extends delivery window with no LD

Penalties/Liquidated Damages

LD applicability not explicitly stated; delivery extension considered without LD if approval delays occur

Bidder Eligibility

  • 3 years of government-related product supply/manufacture experience

  • OEM authorization for distributors/service providers

  • Not under liquidation or bankruptcy; financial standing intact

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Reverse Auction Schedule

Completed

Start

13-Oct-2026, 3:00 pm

End

14-Oct-2026, 3:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

87

Category

Supply installation and testing and commissioning of wind and solar hybrid electrification power plant of 3.5 KVA capacity

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

115

OEM Avg. Turnover

11

Past Performance

80 %

Warranty Period

3 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Supply installation and testing and commissioning of wind and solar hybrid electrification power plant of 3.5 KVA capacity , Prefabricated get earthing electrode of pipe in pipe technology , GI pipe 100 mm dia medium grade , Back fill compound , MS earth pit cover of size 30 cm x 30 cm with handles , Aluminium strip 25 x3 mm of length 9m , Iron spikes 16 inch long , GI Strip 32 x6mm of length 3m , GI Nipple 20 mm dia and 10 cm , GI Reducer socket 40 x20mm , Lightning terminal copper ball with five Nos prong 15 cm long , MS clamp 25 x 3mm with nut and bolt , GI wire 12 gauge , Earth Augur , PVC Pipe 3m long 6 inch dia , User manual , Tester set , GI pipe 40 mm dia 6 mtr long , Natural sand , Aggregate 20mm. , MS pipe 40 mm bore 2M long , 50 mm bore MS Pipe sleeve , Crystaline Conductive Mixture , 220 V 30mm Earthing Insulator Clamp Size 30mm

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Baramulla

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BaramullaBaramulla--160-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9884950.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 24 Items Sign in for GEM prices

#1

Supply installation and testing and commissioning of wind and solar hybrid electrification power plant of 3.5 KVA capacity

Supply installation and testing and commissioning of wind and solar hybrid electrification power plant of 3.5 KVA capacity

1 nos Delivery: 60 days
#2

Prefabricated get earthing electrode of pipe in pipe technology

Prefabricated get earthing electrode of pipe in pipe technology

1 nos Delivery: 60 days
#3

GI pipe 100 mm dia medium grade

GI pipe 100 mm dia medium grade

1 nos Delivery: 60 days
#4

Back fill compound

Back fill compound

25 kgs Delivery: 60 days
#5

MS earth pit cover of size 30 cm x 30 cm with handles

MS earth pit cover of size 30 cm x 30 cm with handles

1 nos Delivery: 60 days
#6

Aluminium strip 25 x3 mm of length 9m

Aluminium strip 25 x3 mm of length 9m

12 rm Delivery: 60 days
#7

Iron spikes 16 inch long

Iron spikes 16 inch long

3 nos Delivery: 60 days
#8

GI Strip 32 x6mm of length 3m

GI Strip 32 x6mm of length 3m

3 rm Delivery: 60 days
#9

GI Nipple 20 mm dia and 10 cm

GI Nipple 20 mm dia and 10 cm

1 nos Delivery: 60 days
#10

GI Reducer socket 40 x20mm

GI Reducer socket 40 x20mm

1 nos Delivery: 60 days
#11

Lightning terminal copper ball with five Nos prong 15 cm long

Lightning terminal copper ball with five Nos prong 15 cm long

1 nos Delivery: 60 days
#12

MS clamp 25 x 3mm with nut and bolt

MS clamp 25 x 3mm with nut and bolt

10 set Delivery: 60 days
#13

GI wire 12 gauge

GI wire 12 gauge

3 kgs Delivery: 60 days
#14

Earth Augur

Earth Augur

1 nos Delivery: 60 days
#15

PVC Pipe 3m long 6 inch dia

PVC Pipe 3m long 6 inch dia

1 nos Delivery: 60 days
#16

User manual

User manual

1 nos Delivery: 60 days
#17

Tester set

Tester set

1 nos Delivery: 60 days
#18

GI pipe 40 mm dia 6 mtr long

GI pipe 40 mm dia 6 mtr long

1 set Delivery: 60 days
#19

Natural sand

Natural sand

1 cum Delivery: 60 days
#20

Aggregate 20mm.

Aggregate 20mm.

1 cum Delivery: 60 days
#21

MS pipe 40 mm bore 2M long

MS pipe 40 mm bore 2M long

1 nos Delivery: 60 days
#22

50 mm bore MS Pipe sleeve

50 mm bore MS Pipe sleeve

2 rm Delivery: 60 days
#23

Crystaline Conductive Mixture

Crystaline Conductive Mixture

4 kgs Delivery: 60 days
#24

220 V 30mm Earthing Insulator Clamp Size 30mm

220 V 30mm Earthing Insulator Clamp Size 30mm

10 nos Delivery: 60 days

Categories 36

Required Documents

1

PAN card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT mandate certified by bank

5

OEM authorization form/certificate

6

End User Certificate in Buyer format (if requested)

7

Contracts/experience certificates showing 3 years supply of similar products to government bodies

8

Technical bid documents and drawings as per terms

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

What documents are required for this tender in Baramulla?

Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization, and End User Certificate if requested. Also provide experience contracts showing 3 years of government supply, along with technical drawings and bids aligned to approved designs.

How is EMD amount of ₹71,715 submitted for Baramulla tender?

Submit EMD of ₹71,715 using online payment or bank demand draft as specified; ensure bid package includes EMD receipt and the bidder's GST and PAN details to match records for easy verification.

What is the delivery timeline after drawing approval for Baramulla project?

Delivery schedule is governed by 5-day drawing approval window; modifications communicated within 5 days; any delay in approval extends the delivery period without LD according to buyer discretion.

Which standards or certifications are mandatory for this Indian Army tender?

OEM authorization and installation by OEM-certified personnel are required; products must have 3 years residual market life and not be end-of-life; end-user format procurement terms may apply as per buyer.

What is the scope of the wind/solar hybrid system in this tender?

The scope covers a 3.5 KVA wind/solar hybrid electrification power plant plus comprehensive earthing components, GI/MS hardware, including 100 mm GI pipe, 30x30 cm earth pit cover, crystalline conductive mixture, and 220 V earthing insulator clamp.

How to ensure installation is performed correctly for Baramulla site?

Installation must be carried out by OEM-certified resources or OEM-authorised resellers; ensure drawings are approved prior to fabrication; coordinate site access and delivery with AOR of 19 Inf Div Baramulla.

What are the key eligibility criteria for this government tender in Jammu & Kashmir?

Eligible bidders must demonstrate 3 years of government project experience, provide OEM authorization, and confirm non-liquidity status; must submit all required financial and technical documents and comply with 5-day drawing approval process.

What are the payment terms and GST handling for this procurement?

GST will be reimbursed at actuals or applicable rate (whichever is lower) subject to tender terms; payment terms align with delivery and acceptance; ensure GSTIN is registered and quoted GST% is accurate.

Advertisement