Bid Publish Date
24-Oct-2025, 4:37 pm
Bid End Date
28-Nov-2025, 4:00 pm
EMD
₹19,00,000
Location
Progress
Quantity
2
Category
DESIGN SITC LNG STORAGE AND DISPENSING FACILITIES ON 2-YEAR ARC BASIS AND WITH 3-YEAR CAMC
Bid Type
Two Packet Bid
Organization: Gail Gas Limited, under the Contract & Procurement division, seeks design, SITC LNG storage and dispensing facilities on a 2-year ARC basis with a 3-year CAMC in the Dakshina Kannada region of Karnataka. The tender includes a dual-part structure with separate EMD: ₹19,00,000 per part and a combined EMD of ₹38,00,000 if bidding both parts. Estimated value is not disclosed. Key commercial terms include an option clause allowing ±25% quantity adjustments at contracted rates, with delivery timelines linked to the original order, and GST pre-filled at 18%. Bidders must align with the tender’s Schedule-1/ Schedule-2 formats on GeM for Bengaluru and Dakshin Kannada. This procurement emphasizes long-term service with CAMC coverage post-installation.
Project: LNG storage and dispensing facilities (DESIGN, SITC) for 2-year ARC + 3-year CAMC
EMD: ₹19,00,000 per part; ₹38,00,000 total for both parts when bidding both
GST: 18% (pre-filled; may be updated per applicability)
Delivery time: baseline per original order; extended time formula with minimum 30 days
GA references: GeM Schedule 1 (Bengaluru) and Schedule 2 (Dakshin Kannada)
No explicit technical specifications disclosed in the summary; refer to tender volumes for detailed requirements
EMD submission as per Part A/B; ₹19 Lakh per part, ₹38 Lakh if bidding both
25% quantity variation right during order and currency; extended delivery time rules
GST 18% pre-filled; adjust as applicable in price quotes
GeM Schedule alignment for Bengaluru GA and Dakshin Kannada GA
GST at 18%; payments aligned to Schedule-1/ Schedule-2 with price breakup matching GeM portal totals
Delivery period begins from last date of original delivery order; option clause may extend time; minimum 30 days extension
Not explicitly stated here; refer to tender volumes for LD applicability and CAMC terms
Demonstrated experience in LNG storage and dispensing facilities (design and SITC)
Financial capability to mobilize EMD ₹19 Lakh per part
Compliance with GeM Schedule formats and Bengaluru/Dakshin Kannada GA requirements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
DESIGN SITC LNG STORAGE AND DISPENSING FACILITIES ON 2-YEAR ARC BASIS AND WITH 3-YEAR CAMC
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates showing relevant LNG facility projects
Financial statements (as required by tender)
EMD submission proof as per Part A/B requirements
Technical bid/price bid in GeM format (as per Schedule-1 & Schedule-2)
OEM authorization if applicable for LNG storage equipment
Any other documents specified in Volume I–II of tender
Extended Deadline
28-Nov-2025, 4:00 pm
Opening Date
28-Nov-2025, 4:30 pm
Extended Deadline
25-Nov-2025, 4:00 pm
Opening Date
25-Nov-2025, 4:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | BEERENSGAS (INDIA) PRIVATE LIMITED Under PMA | Make : STRING Model : 55KL Title : DESIGN SITC LNG STORAGE AND DISPENSING FACILITIES ON 2-YEAR ARC BASIS AND WITH 3-YEAR CAMC | 28-11-2025 15:32:00 | |
| 2 | CRYOGAS EQUIPMENT PRIVATE LIMITED Under PMA | Make : NA Model : GAIL DK LNG Station Title : DESIGN SITC LNG STORAGE AND DISPENSING FACILITIES ON 2-YEAR ARC BASIS AND WITH 3-YEAR CAMC | 25-11-2025 17:05:15 | |
| 3 | INOX INDIA LIMITED Under PMA | Make : INOXCVA Model : INOX LNG/LCNG FUELING STATION Title : DESIGN SITC LNG STORAGE AND DISPENSING FACILITIES ON 2-YEAR ARC BASIS AND WITH 3-YEAR CAMC | 28-11-2025 12:03:40 | |
| 4 | M P ENGINEERING CONSTRUCTIONS (INDIA ) PRIVATE LIMITED Under PMA | Make : NA Model : LNG STORAGE AND DISPENSING AT Bengaluru GA Title : DESIGN SITC LNG STORAGE AND DISPENSING FACILITIES ON 2-YEAR ARC BASIS AND WITH 3-YEAR CAMC | 27-11-2025 15:31:59 | |
| 5 | SIDDHAYU ENGINEERING PRIVATE LIMITED Under PMA | Make : NA Model : ETMVL-56.8/12 Title : DESIGN SITC LNG STORAGE AND DISPENSING FACILITIES ON 2-YEAR ARC BASIS AND WITH 3-YEAR CAMC | 22-11-2025 14:38:28 |
Please sign in or create an account to view contract details and download result documents.
Key insights about KARNATAKA tender market
Bidders must submit EMD of ₹19 Lakh per part, align price bids with Schedule-1/ Schedule-2, and provide GST as 18% unless otherwise applicable. Include technical compliance certificates and OEM authorizations if required. Ensure all documents are uploaded to GeM and match the Excel price breakup totals.
Submit GST certificate, PAN card, experience certificates for LNG projects, financial statements, EMD proof, technical bid, OEM authorization (if applicable), and GeM price schedule. Ensure consistency between Excel price breakup and GeM portal totals; provide region-specific GA compliance data.
Delivery starts from the last date of the original delivery order; option clause allows ±25% quantity changes at contracted rates. If extended, time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days. Further extensions may be permitted within the original delivery window.
GST is pre-filled at 18% in Schedule-1/ Schedule-2. Bidders may adjust based on applicability; ensure the final quoted amount reflects the correct GST rate and that totals in the Excel price breakup match GeM portal entries.
EMD is ₹19,00,000 per part. If bidding both parts, total EMD is ₹38,00,000 as per tender guidance; submit proof of EMD along with all other bid documents per Volume I–II.
Due to limited specification data, refer to tender volumes for exact standards; bidders should be prepared with LNG project experience, design and SITC capability, and OEM authorizations if specified. Ensure compliance with GeM formats and local GA requirements.
Price bids must be submitted according to GeM Schedule-1 (Bengaluru GA) or Schedule-2 (Dakshin Kannada GA) formats; totals must match the Excel sheet. Exact deadlines are published in the tender schedule; bidders should prepare price breakup accordingly.
The procurement covers 2-year ARC plus 3-year CAMC for LNG storage and dispensing facilities. CAMC implies post-installation maintenance and service coverage for three years, with terms defined in the tender documents and corresponding GeM schedules.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS