TenderDekho Logo
GEM

Open Tender for SCREW COMPRESSOR FLUID. 20 LTR.,OIL FILTER,AIR FILTER,OIL SEPARATOR,AIR INTAKE VALVE RH38E,SCAVANGE in KANPUR NAGAR, UTTAR PRADESH

Bid Publish Date

17-Apr-2025, 4:03 pm

Bid End Date

08-May-2025, 5:00 pm

Progress

Issue17-Apr-2025, 4:03 pm
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

45

Bid Type

Single Packet Bid

Categories 36

Uttar Pradesh Metro Rail Corporation Limited has released a public tender for SCREW COMPRESSOR FLUID. 20 LTR. , OIL FILTER, AIR FILTER, OIL SEPARATOR, AIR INTAKE VALVE RH38E, SCAVANGE PIPE, MPVL KIT, SERVICE KIT THERMOSTATIC VALVE, O RING, COMBINATION BLOCK-BASE FLANGE, O RING FOR AIREND MOUNTING, BANDED BELTS 2H3VX490, AIREND OIL SEAL REFER-271. 03. 170. 50 271. 02. 032. 50, CONTACTOR, Oil Filter Element R2 and R3, AIR FILTER R3, OIL SEPARATOR R3, GASKET OIL SEPERATOR, SERVICE KIT FOR THERMOSTATIC VALVE, INTAKE VALVE KIT, AUTO DRAIN ASSEMBLY, O RING OF MOISTURE SEPARATOR, GASKET KIT 141 AIR END R3, COUPLING ELEMENT, KIT COMPLETE OVERHAUL 2545, VALVE CHECK 1 BSPTx3 by 4 NPT, Oil Container 5 LTR T30 Distinct, Lubricant Oil 20 Can LTR, Service charge, Packaging and Freight in KANPUR NAGAR, UTTAR PRADESH. Quantity: 45. Submission Deadline: 08-05-2025 17: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SCREW COMPRESSOR FLUID. 20 LTR. , OIL FILTER , AIR FILTER , OIL SEPARATOR , AIR INTAKE VALVE RH38E , SCAVANGE PIPE , MPVL KIT , SERVICE KIT THERMOSTATIC VALVE , O RING, COMBINATION BLOCK-BASE FLANGE , O RING FOR AIREND MOUNTING , BANDED BELTS 2H3VX490 , AIREND OIL SEAL REFER-271.03.170.50 271.02.032.50 , CONTACTOR , Oil Filter Element R2 and R3 , AIR FILTER R3 , OIL SEPARATOR R3 , GASKET OIL SEPERATOR , SERVICE KIT FOR THERMOSTATIC VALVE , INTAKE VALVE KIT , AUTO DRAIN ASSEMBLY , O RING OF MOISTURE SEPARATOR , GASKET KIT 141 AIR END R3 , COUPLING ELEMENT , KIT COMPLETE OVERHAUL 2545 , VALVE CHECK 1 BSPTx3 by 4 NPT , Oil Container 5 LTR T30 Distinct , Lubricant Oil 20 Can LTR , Service charge , Packaging and Freight

Authority Records

MINISTRY OF HOUSING AND URBAN AFFAIRS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7747346.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 30 Items Sign in for GEM prices

#1

SCREW COMPRESSOR FLUID. 20 LTR.

As per attached specification document

1 pack Delivery: 60 days
#2

OIL FILTER

As per attached specification document

1 number Delivery: 60 days
#3

AIR FILTER

As per attached specification document

1 number Delivery: 60 days
#4

OIL SEPARATOR

As per attached specification document

1 number Delivery: 60 days
#5

AIR INTAKE VALVE RH38E

As per attached specification document

1 number Delivery: 60 days
#6

SCAVANGE PIPE

As per attached specification document

1 number Delivery: 60 days
#7

MPVL KIT

As per attached specification document

1 number Delivery: 60 days
#8

SERVICE KIT THERMOSTATIC VALVE

As per attached specification document

1 number Delivery: 60 days
#9

O RING, COMBINATION BLOCK-BASE FLANGE

As per attached specification document

1 number Delivery: 60 days
#10

O RING FOR AIREND MOUNTING

As per attached specification document

1 number Delivery: 60 days
#11

BANDED BELTS 2H3VX490

As per attached specification document

1 number Delivery: 60 days
#12

AIREND OIL SEAL REFER-271.03.170.50 271.02.032.50

As per attached specification document

1 number Delivery: 60 days
#13

CONTACTOR

As per attached specification document

1 number Delivery: 60 days
#14

Oil Filter Element R2 and R3

As per attached specification document

4 number Delivery: 60 days
#15

AIR FILTER R3

As per attached specification document

2 number Delivery: 60 days
#16

OIL SEPARATOR R3

As per attached specification document

2 number Delivery: 60 days
#17

GASKET OIL SEPERATOR

As per attached specification document

4 number Delivery: 60 days
#18

SERVICE KIT FOR THERMOSTATIC VALVE

As per attached specification document

2 number Delivery: 60 days
#19

MPVL KIT

As per attached specification document

2 number Delivery: 60 days
#20

INTAKE VALVE KIT

As per attached specification document

2 number Delivery: 60 days
#21

AUTO DRAIN ASSEMBLY

As per attached specification document

2 number Delivery: 60 days
#22

O RING OF MOISTURE SEPARATOR

As per attached specification document

2 number Delivery: 60 days
#23

GASKET KIT 141 AIR END R3

As per attached specification document

2 number Delivery: 60 days
#24

COUPLING ELEMENT

As per attached specification document

2 number Delivery: 60 days
#25

KIT COMPLETE OVERHAUL 2545

As per attached specification document

1 number Delivery: 60 days
#26

VALVE CHECK 1 BSPTx3 by 4 NPT

As per attached specification document

1 number Delivery: 60 days
#27

Oil Container 5 LTR T30 Distinct

As per attached specification document

1 number Delivery: 60 days
#28

Lubricant Oil 20 Can LTR

As per attached specification document

1 number Delivery: 60 days
#29

Service charge

As per attached specification document

1 number Delivery: 60 days
#30

Packaging and Freight

As per attached specification document

1 number Delivery: 60 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What are the eligibility requirements for participation in the tender?

The eligibility requirements include being a registered entity, possessing relevant experience in supplying similar consumables, and compliance with local business operation regulations. Bidders should demonstrate operational capacity and compliance with quality standards.

What technical specifications must the consumables meet?

The technical specifications for the consumables must align with the manufacturer’s guidelines and relevant quality standards. Each item in the Bill of Quantities (BOQ) is designed to ensure optimal performance and safety in the operational environment of air compressors.

What is the process for submitting documents for the tender?

Documents should be submitted electronically in formats specified by the issuing authority. Bidders are encouraged to adhere strictly to the submission guidelines and ensure all required documents are included to facilitate a smooth evaluation process.

Can MSEs or startups expect any benefits when participating in this tender?

Yes, there are special provisions designed to support Micro, Small, and Medium Enterprises (MSEs) as well as startups. These may include reduced requirements for bid submissions and access to financial assistance to promote participation and inclusivity.

How is the evaluation of bids conducted for this tender?

The evaluation process will include assessing all bids against a standard set of criteria which includes technical compliance, financial capacity, and prior experience with similar supplies. Ensuring compliance with specified requirements is key to successful bid evaluation and selection.