Progress
Organization: Indian Army (Department Of Military Affairs) conducting a procurement for MS ROUND PIPE, BEARING BRACKET, BUSH, BEARING, and MS FLAT PATTI. Location: FARIDKOT, PUNJAB - 151202. BoQ lists 5 items, though specific quantities are not disclosed. The tender uses a flexible quantity approach with up to 25% increase/decrease at contract award and during currency, at contracted rates. Delivery timelines reference a calculated extension based on the original delivery period, with a minimum of 30 days. This tender emphasizes standard compliance and delivery adaptability to meet military needs.
Key Term 1: Quantity variation up to 25% during contract at contracted rates
Key Term 2: Delivery period extension formula with minimum 30 days
Key Term 3: Delivery starts from last date of original delivery order; option timing adjustments allowed
Not specified in data; bidders should confirm payment schedule in tender documents
Delivery commencement from last date of original order; extended period allowed via option clause with calculated additional time
Not specified in data; verify in detailed terms
Experience supplying MS structural components or related bearing assemblies
Ability to meet defense procurement documentation and compliance
Valid GST registration and financial stability documentation
Quantity
15
Category
MS ROUND PIPE
Bid Type
Single Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
7 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
60 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
MS ROUND PIPE , BEARING BRACKET , BUSH , BEARING , MS FLAT PATTI
Pre-Bid Date
18-10-2026 09:00:00
Pre-Bid Venue
Pre Bid meet held at consignee location. All bidder are requested to attend the pre bid meet and produce the original sample of bid item. Otherwise they will be disqualify.
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Faridkot
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Faridkot | Faridkot | - | - | 10 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
MS ROUND PIPE
IRON METAL
BEARING BRACKET
IRON METAL
BUSH
IRON METAL
BEARING
IRON METAL
MS FLAT PATTI
IRON METAL
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | MS ROUND PIPE | IRON METAL | 10 | nos | subrata@818 | 15 | |
| 2 | BEARING BRACKET | IRON METAL | 1 | nos | subrata@818 | 15 | |
| 3 | BUSH | IRON METAL | 2 | nos | subrata@818 | 15 | |
| 4 | BEARING | IRON METAL | 1 | nos | subrata@818 | 15 | |
| 5 | MS FLAT PATTI | IRON METAL | 1 | nos | subrata@818 | 15 |
Discover companies most likely to bid on this tender
GST registration
Permanent Account Number (PAN) card
Experience certificates for similar supply
Financial statements / turnover data
EMD/Security deposit documentation
Technical bid / compliance certificates
OEM authorizations or approvals (if applicable)
Any organization-specific bid submission certificates
Key insights about PUNJAB tender market
Bidders should register on the government portal, upload GST and PAN, provide experience certificates for similar supply, submit technical compliance documents, and furnish EMD as required. The tender specifies 25% quantity variation and a variable delivery timeline based on the original order period.
Required documents include GST registration, PAN, experience certificates for related supply, latest financial statements, EMD documentation, technical bid, and OEM authorizations if applicable. Ensure submission aligns with portal format and category of MS ROUND PIPE and BEARING components.
Delivery starts from the last date of the original delivery order. If quantity increases, additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend delivery up to the original delivery period.
EMD details are not specified in the basic data and must be verified in the tender documents on the portal. Prepare the standard EMD deposit via online payment or bank demand draft as per portal guidance.
No specific standards are listed in the provided data; bidders should anticipate defense-grade material quality and compliance with internal Army procurement standards and OEM certifications where applicable, and verify on the portal for exact IS/IS standards.
BoQ lists 5 items total, including MS ROUND PIPE, BEARING BRACKET, BUSH, BEARING, and MS FLAT PATTI. However, individual item quantities are not disclosed in the provided data; bidders should await detailed BoQ for exact scope.
Payment terms are not specified in the available data. Bidders must consult the tender terms to confirm whether payment is milestone-based, against delivery, or upon acceptance, and ensure alignment with delivery milestones.
Ensure eligibility by submitting GST, PAN, experience certificates for similar defense packaging, financial statements demonstrating stability, and EMD as required. Also confirm OEM authorizations and compliance with option-clause delivery terms prior to submission.