Dismantalling,Dismantalling,Dismantalling,Dismantalling,Dismantalling,Dismantalling,Wiring,Switch B
Bharat Sanchar Nigam Limited Portal(bsnl)
Bid Publish Date
03-Feb-2026, 5:21 pm
Bid End Date
19-Feb-2026, 6:00 pm
Location
Progress
Quantity
79
Category
l-Fabrication Work
Bid Type
Two Packet Bid
Organization: Uttar Pradesh Power Corporation Limited (UPPCL) – Energy Department, Uttar Pradesh. Procurement scope: Erection, fabrication, supplying and fixing work at the 220 kV Sub-Station, Amethi, with 13 BOQ items spanning cable termination, jumper opening, isolator dismantling, shifting, erection, clamping, fabrication, and related wiring terminations. Location: Amethi, Uttar Pradesh. Delivery/Completion: 30 days from LOI/order availability; F.O.R. to 220 kV Sub-Station, Amethi. Payment terms: 90% on delivery/inspection, 10% as performance security; option to secure 100% payment via FDR/B.G. at recipient’s cost. Option clause: purchaser may increase quantity up to 25% during or after contract at contracted rates.
Scope includes: N/A technical items listed in BOQ
Delivery: F.O.R. to 220 kV Sub-Station, Amethi
Timeline: 30 days from LOI/order/shutdown availability
Payment: 90% on delivery/inspection; 10% as PBG or full payment with FDR/B.G
Penalties: 0.5% per week, max 10% for late delivery
Delivery window fixed at 30 days from LOI; option clause allows 25% quantity variation
Payment terms: 90% after delivery/inspection; 10% as performance security or full payment with FDR/B.G
Penalties apply for late delivery at 0.5% per week up to 10%
90% payment on satisfactory delivery and site inspection; 10% withheld as performance guarantee or facilitated via FDR/B.G to secure 100% payment
Work to be completed within 30 days from LOI/order/shutdown; quantity variations up to 25% at contracted rates
0.5% weekly penalty for late delivery, capped at 10% of the late value; deductions from firm’s bill
Experience in delivering and installing high-voltage equipment at substations
Ability to execute within 30 days from LOI and shutdown
Compliance with UPPTCL general terms and conditions and ability to provide performance security
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Sanchar Nigam Limited Portal(bsnl)
Employees State Insurance Corporation (esic)
JAMMU, JAMMU & KASHMIR
Bharat Sanchar Nigam Limited Portal(bsnl)
Uttar Pradesh Power Corporation Limited (uppcl)
AZAMGARH, UTTAR PRADESH
Indian Air Force
COIMBATORE, TAMIL NADU
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | a-Cable Termination | Disconnecting all the control cable connection of 220 kv Sultanpur(202 and 208) bay from main Switch and MOM boxes of isolators as per requinment, taking out all the control cable from MOM boxes and taping other wires safely and Safe stacking of all dismantled cable the Work also including dismantling of air pipe lines and proper stacking safely including labour and Tand P etc. required for proper completion of work (one job for each isolator) | 3 | jobs | ae@slt2 | 30 |
| 2 | b-Jumper Opening | Openning Jumper of 220 kv Sultanpur (202 and 208) bay isolator both side (one side at the hieght of 11 meter and other side 03 mtr.),220 kv B-bus and Line Isolator and other associated work including labour and Tand P etc.required for proper completion of work.(one job for each isolator) | 3 | jobs | ae@slt2 | 30 |
| 3 | c-Isolator Dismantling | Dismantling of following 220 kv KPM make Isolator at Sultanpur(202 and 208) bay with post insulator safely to avoid any damage as per isnstruction of Engineer In-charge and all other associated work for proper completion of work carefully in 220 kv switchyard 220 kv Standard isolator without Earth switch (89B) of 220 kv Sultanpur bays | 2 | nos | ae@slt2 | 30 |
| 4 | d-Isolator Dismantling | Dismantling of following 220 kv KPM make Isolator at Sultanpur(202 and 208) bay with post insulator safely to avoid any damage as per isnstruction of Engineer In-charge and all other associated work for proper completion of work carefully in 220 kv switchyard 220 kv Standard isolator without Earth switch (89L) of 220 kv Sultanpur bays | 1 | nos | ae@slt2 | 30 |
| 5 | e-Shifting of Isolator | Shifting of new 220 kv GPRS-SAS make Standard/tendom Isolator from Store to Switch yard. Inculding post Insulator and other Associcated accessories including labour and T and P etc. requred for proper completion of work (one job for each isolator) | 3 | nos | ae@slt2 | 30 |
| 6 | f-Erection Work | Erection of following new 220 kv standard-tendem isolator with earh switch with opating mechanism and post insulator as per instruction manual and technical specification including alignment of isolator for smooth local and remote opration and all other associated work including labour and Tand P etc required for proper completion of work(one job for each isolator) 220 kv Standard isolator without Earth switch (89B) of 220 kv Sultanpur bays | 3 | nos | ae@slt2 | 30 |
| 7 | g-Erection Work | Erection of following new 220 kv standard tendem isolator with earh switch with opating mechanism and post insulator as per instruction manual and technical specification including alignment of isolator for smooth local and remote opration and all other associated work including labour and T and P etc required for proper completion of work (one job for each isolator) 220 kv Standard isolator without Earth switch (89B) of 220 kv Sultanpur bays | 2 | nos | ae@slt2 | 30 |
| 8 | h-Erection Work | Erection of following new 220 kv standard tendem isolator with earh switch with opating mechanism and post insulator as per instruction manual and technical specification including alignment of isolator for smooth local and remote opration and all other associated work including labour and T&P etc required for proper completion of work (one job for each isolator) 220 kv Standard isolator with Earth switch (89L) of 220 kv Sultanpur bays | 1 | nos | ae@slt2 | 30 |
| 9 | i-Jumpering Work | Jumpering replacment of Zebra conductor of 220 kv Sultanpur bay (202) Line isolator both side.220 kv Bus couplor Bay (208) A-bus, B-bus and post insulator with help of ACSR Zebra Conductor With Sutable clamps (to be Provided by the department) including labour and Tand P etc required for proper completion of work.(one job for each isolator) | 3 | nos | ae@slt2 | 30 |
| 10 | j-Termintion of wiring | Termination of all cables as per drawing of man switch MOM boxes according to Proper matching of old and new isolator drawing and cheking of proper remote and local operation .This work also including laying of 4 core cable from AC cubuical to MOM boxes(aprox.150 meter)including labour and Tand P etc required for proper completion of work(One job for each isolator) | 3 | nos | ae@slt2 | 30 |
| 11 | k-Clamp Tightening | Cheking and tighting of PG clamp.CT Clamp PT Clamp and Breaker clamp in 220 KV TBC bays this work also included replacement of above clamps (if found Damaged) including labpur and Tand P etc. | 40 | nos | ae@slt2 | 30 |
| 12 | l-Fabrication Work | Modification of Channel and welding of earthing Strip on channel foe new 220 kv bays isolator and MOM boxes Painting of earth strip with green colour and other associted work including labour and T and P etc required for proper completion of work (one Job Each isolator) | 3 | nos | ae@slt2 | 30 |
| 13 | m-Supplying and Fixing work | Supply and fixing of 132KV isolator Terminal connector duly made of Aluminium Alloy (LM6) suitable for Zebra -Panther Conductor as per sample. | 12 | nos | ae@slt2 | 30 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar Erection/Fabrication work at substations
Financial statements or turnover evidence
EMD/Security deposit documentation (as applicable via terms)
Technical bid documents and compliance certificates
OEM authorizations (if applicable) and site clearance documents
Non-judicial stamp paper for agreement (₹100)
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | R. K. ASSOCIATES Under PMA | - | 17-02-2026 19:40:45 | Qualified |
| 2 | UNIQUE ENTERPRISES Under PMA | - | 18-02-2026 14:29:06 | Qualified |
| 3 | URJA ELECTRICALS Under PMA | - | 17-02-2026 22:20:43 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | R. K. ASSOCIATES Under PMA | ₹1,85,095 | Item Categories : a-Cable Termination,b-Jumper Opening,c-Isolator Dismantling,d-Isolator Dismantling,e-Shifting of Is |
| L2 | URJA ELECTRICALS Under PMA | ₹1,89,075 | Item Categories : a-Cable Termination,b-Jumper Opening,c-Isolator Dismantling,d-Isolator Dismantling,e-Shifting of Is |
| L3 | UNIQUE ENTERPRISES Under PMA | ₹1,99,263 | Item Categories : a-Cable Termination,b-Jumper Opening,c-Isolator Dismantling,d-Isolator Dismantling,e-Shifting of Is |
Please sign in or create an account to view contract details and download result documents.
Key insights about UTTAR PRADESH tender market
This tender requires registration with UPPTCL BTS portal, submission of GST, PAN, experience certificates, financials, EMD/PG or FDR option, OEM authorizations if needed, and technical bid with compliance certificates. Ensure readiness for 30-day completion and adherence to 0.5% weekly penalty caps.
Bidders must submit GST certificate, PAN card, experience certificates for substations, financial statements, EMD/PG details, technical bid documents, OEM authorizations if applicable, and stamp-paper agreement (₹100). Ensure all documents are uploaded on the BTS portal.
Delivery is F.O.R. to 220 kV Sub-Station, Amethi, with a completion target of 30 days from LOI. In case of quantity variation, the delivery period scales according to (Increased quantity ÷ Original quantity) × Original period, minimum 30 days.
Up to 90% payment is released after successful delivery and site inspection; 10% is retained as performance guarantee or paid via FDR/B.G; full 100% payment may be released with FDR/B.G pledged to the Executive Engineer.
Late delivery incurs a penalty of 0.5% per week, up to a maximum of 10% of the late value, deducted from the contractor’s bill; timely compliance is essential to avoid penalties.
Yes, the purchaser may increase or decrease quantity up to 25% of bid/contracted quantity at the same contracted rates; delivery timing adjusts with the calculated additional time rule.