TenderDekho Logo
Active GEM

Indian Army LED Lamp Assembly Tender Dimapur Nagaland 25% Qty Clause 2026

Bid Publish Date

10-Aug-2026, 9:28 pm

Bid End Date

31-Aug-2026, 10:00 am

Progress

Issue10-Aug-2026, 9:28 pm
AwardPending

Key Highlights

  • Clinical focus on LED Lamp Assembly with holder and PVC insulated copper wire
  • No explicit technical standards listed; propose ISI/IEC-compliant components as best practice
  • Quantity variance clause enabling 25% up-sell during and after contract
  • Delivery-time extension method tied to quantity changes with minimum 30-day baseline

Tender Overview

The Indian Army (Department Of Military Affairs) invites bids for a LED Lamp Assembly complete with holder and associated PVC insulated flexible copper wire procurement at Dimapur, Nagaland 797103. The expected quantity is flexible with an option to increase by up to 25% of bid quantity. The tender emphasises contract continuity with extended delivery periods tied to scaled quantities, starting from the last date of the original delivery order. This opportunity targets suppliers experienced in secure, field-grade lighting hardware and wiring assemblies, with a focus on timely delivery and compliance with the purchaser’s option clause. The contract includes delivery timing considerations and ensures alignment with orders placed under fluctuating demand, making reliability and scalability key differentiators for bidders.

Key Specifications

  • Product: LED Lamp Assembly with holder

  • Cable: PVC insulated flexible copper wire

  • Quantity: Flexible per option clause up to 25% increase

  • Delivery: As per original delivery order with extended period rules

  • Standards/Certifications: Not specified; propose ISI/IEC-compliant components

Terms & Conditions

  • Delivery clause allows 25% quantity variation at contracted rates

  • Minimum delivery extension period 30 days due to option clause

  • No explicit technical standards provided; bidders must propose compliant specs

Important Clauses

Payment Terms

Not specified in the tender data; bidders should request standard government payment terms and ensure documentation covers delivery milestones

Delivery Schedule

Delivery period governs from last date of original order; extended periods apply depending on quantity changes with minimum 30 days

Penalties/Liquidated Damages

Not specified; bidders should seek clarity on LDs or performance guarantees in final contract

Bidder Eligibility

  • Experience in supplying LED lighting assemblies or electrical wiring for defense or government projects

  • Demonstrated financial capability to handle variable quantities

  • Compliance with standard procurement documentation (GST, PAN, EMD)

Tender Data

Bid Details

Quantity

9

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Led Lamp Assembly Complere with holder and PVC Insulated Flexible Copper Wire

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

DIMAPUR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-DIMAPURDIMAPUR--915-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9736729.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates related to LED lighting or electrical assemblies

4

Financial statements or bank statement showing financial stability

5

EMD/Security deposit documents (as applicable by procurement rules)

6

Technical bid documents and product specifications

7

OEM authorizations or approvals for LED lamp assemblies and copper wire components

Frequently Asked Questions

Key insights about NAGALAND tender market

How to bid for the LED lamp assembly tender in Dimapur Nagaland 2026?

Bidders must submit GST registration, PAN, experience certificates, financial documents, EMD, and technical compliance materials. Provide OEM authorizations if required and ensure the LED lamp assembly and PVC insulated copper wire meet field-use durability expectations. Prepare for a 25% quantity variation and schedule delivery accordingly.

What documents are required for the Indian Army lighting tender in Dimapur?

Required documents include GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD documents, technical bid and product specifications, and OEM authorizations for LED lamp assemblies and copper wires.

What are the delivery terms for quantity variation in this tender?

The purchaser may increase or decrease quantity by up to 25% at contract placement and during currency at contracted rates. Delivery time extends using a formula based on quantity change, with a minimum extension of 30 days.

What standards or certifications are expected for the LED components?

The tender does not specify standards; bidders should propose IS I/IEC-compliant components and provide conformity certificates or test reports to support reliability for defense use.

What is the significance of the option clause for bidders?

The option clause allows quantity fluctuations up to 25%, enabling winners to secure larger orders if demand rises while maintaining bid prices, but requiring flexible production planning and timely delivery.

When is delivery expected after the original order date?

Delivery should start after the last date of the original delivery order, with extended delivery periods calculated for additional quantity per the tender terms, minimum 30 days extension where applicable.

What are the essential eligibility criteria for the Dimapur LED bid?

Eligibility includes prior experience in LED lighting or electrical assemblies, valid GST and PAN, financial stability evidence, and readiness to submit EMD and OEM authorizations as required by the procurement terms.

How to verify OEM authorization for LED lamp components?

Obtain official OEM authorization letters, match part numbers for LED lamp assemblies and PVC copper wire, and attach certificates of conformity or supplier approvals. This strengthens technical bid compliance for defense procurement.