Progress
Quantity
10
Bid Type
Single Packet Bid
South Central Railway invites bids for a Line Interactive UPS with AVR (V2), targeting railway electrical stability and reliability. Scope indicates Only supply of Goods with potential quantity adjustments up to 25%. Key technical themes include UPS rating in KVA, inverter technology and efficiency, minimum guaranteed battery backup, enclosure, IP rating, and input/output voltage specs. The contract requires a comprehensive warranty beyond standard terms and a warranty certificate uploaded with the material. Location details are not specified in the data, but the tender sits within the Indian Railways network and aligns with GeM-style ATC terms. Unique factors include option clauses on quantity and a delivery timeframe tied to original and extended orders, plus OEM/comprehensive warranty undertakings. This tender emphasizes robust after-sales support and compliance with standard railway procurement expectations.
Product category: Line Interactive UPS with AVR (V2)
UPS rating required: specified in KVA (exact value not provided)
Inverter technology: standard line interactive with AVR
Inverter efficiency: specified as a percentage (not disclosed)
Minimum battery backup time: provided as minutes at full load
Battery location: internal/external as per model
Enclosure material: must meet railway requirements
IP rating: ingress protection rating specified (not disclosed)
Rated output voltage with THD: voltage and % THD (not disclosed)
Input voltage range: specified in volts
EMD amount not disclosed; bidders should prepare as per GeM terms.
Quantity variation up to 25% during contract with calculated delivery time.
Comprehensive warranty beyond standard terms; warranty certificate is mandatory.
Scope limited to supply of goods; no installation scope described.
OEM undertakings required for warranty and compliance with standards.
Not explicitly provided; bidders should align with standard GeM/T&C practices and contract-specific arrangements.
Delivery starts from the last date of original delivery order; extended period follows option clause with time calculation (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Not specified in data; anticipate standard LD clauses aligned with railway procurement practices.
Experience in supplying UPS systems with AVR to large-scale clients
Financial stability evidenced by last 2 years' statements
OEM authorization if not the sole bidder
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Line Interactive UPS with AVR (V2) (Q2)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Hanumakonda
Delivery Pincodes
506003
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Peruri Amala Rao | 506003,GSTIN Number: 36AAAGM0289C1ZK, Office of the Sr. DME/DSL/KZJ, DIESEL LOCO SHED, KAZIPET. mail: [email protected], Ph. No. 97013 71487 | Hanumakonda | Telangana | 506003 | 10 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | UPS Rating (in KVA) | 1.5, 2.0, 3 Or higher |
| GENERIC | Inverter Technology | MOSFET-PWM |
| GENERIC | Inverter Efficiency (in %) | 70% or better Or higher |
| GENERIC | Minimum Guaranteed Battery Backup Time (in Minutes) at Full Load | 15, 30, 60, 90, 120, 180, 240 Or higher |
| Battery/Backup Bank | Battery Location | Inside the Enclosure of UPS |
| CONSTRUCTION | Enclosure Material | ABS |
| CONSTRUCTION | Degree of Protection (Ingress Protection) | IP21, IP 20 Or higher |
| FEATURES | Rated Output (in volt) with Total Harmonic Distortion (in %) | Single Phase Sinewave 230v AC 50Hz with Total Harmonic Distortion as <3% Or higher |
| FEATURES | Input Voltage Range (in volt) | Single Phase AC (160-280V) |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar UPS supply projects
Financial statements (last 2 years)
EMD/Security deposit proof
Technical bid documents showing specifications compliance
OEM authorization/authorizations (if bidder is not OEM)
Warranty compliance certificate draft or undertaking
Any other documents specified in T&C (ATC) and GeM terms
Key insights about TELANGANA tender market
Bidders should prepare GST, PAN, financials, and experience certificates, plus OEM authorizations. Submit EMD proof and technical compliance documents showing UPS rating, inverter technology, efficiency, backup time, battery location, enclosure material, IP rating, THD and input voltage range. Ensure comprehensive warranty undertakings and delivery terms aligned with option clauses.
Required documents include GST certificate, PAN, last 2 years' financial statements, experience certificates for similar UPS supply, EMD proof, OEM authorization if applicable, technical bid with specifications, and a warranty certificate undertaking. Upload warranty compliance certificate with bid as per ATC terms.
Expect UPS rating in KVA, inverter technology with AVR, inverter efficiency percentage, minimum battery backup time, battery location, enclosure material, IP rating, rated output voltage with THD, and input voltage range. Provide exact values from model datasheet and ensure compliance with railway-grade standards.
Delivery commences from the last date of the original delivery order. If quantity is increased, additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extended time may apply up to the original period.
Scope of supply is strictly the delivery of goods (Line Interactive UPS with AVR) with comprehensive warranty. Installation and commissioning are not described in the terms; bidders should clarify any installation support separately if required by the purchaser.
Bidder must provide comprehensive warranty for the entire contract term, with a warranty certificate or undertaking uploaded. If OEM takes responsibility, an OEM undertaking must be submitted along with bidder undertakings, covering the complete warranty scope.
The tender references generic category standards and railway procurement expectations. Bidders should ensure ISI/ISO certifications where applicable, IS 550 compliance, and any OEM-specific quality certifications. Ensure THD specifications and protection levels meet railway environmental requirements.
Purchaser reserves the right to modify quantity by ±25% at contract placement and during currency. Delivery timelines adjust based on the original delivery period and extended periods; minimum 30 days applies for additional time calculations. Plan buffer stock and flexible supply chain accordingly.
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS