TenderDekho Logo
Active GEM

Central Electronics Limited DSIR procurement Tender 2026 India ST-RDM-0061 to ST-RDM-0064

Bid Publish Date

30-Jul-2026, 11:18 am

Bid End Date

04-Aug-2026, 10:00 am

Location

GHAZIABAD , UTTAR PRADESH

Progress

Issue30-Jul-2026, 11:18 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

206

Category

ST-RDM-0064

Bid Type

Single Packet Bid

Tender Overview

Central Electronics Limited (Department of Scientific and Industrial Research) invites bids under multiple ST-RDM categories (0061 Part 1 & Part 2, 0062–0064). The tender comprises 5 BOQ items with no product specifications published in the data available. The procurement requires adherence to a Buyer Uploaded ATC, including Annexure A submission, and directs bidders to refer to the ATC document for all eligibility and documentation specifics. The option clause permits ±25% quantity changes at contract award and during execution, with delivery periods recalculated using a defined formula. Bidders should prepare to align with CEL’s bid process and the uploaded ATC terms.

Technical Specifications & Requirements

  • No technical specifications are disclosed in the provided tender data; bidders must rely on the ATC document and Annexure A for technical compliance.
  • BOQ indicates 5 items, but itemized quantities are not listed in the accessible data.
  • The ATC document governs all terms; bidder submissions must include Annexure A and other formats as specified in the ATC.
  • Delivery terms reference a quantity variation mechanism of 25% and a delivery-period extension formula: (Increase in quantity / Original quantity) × Original delivery period, minimum 30 days.
  • Contact CEL for clarifications via [email protected], [email protected], or [email protected]; actual details are in the uploaded ATC.

Terms & Eligibility

  • Quantity flexibility: Purchaser may increase/decrease ordered quantity by up to 25% at contract placement and during the contract.
  • Delivery period mechanics: extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Documentation: Annexure A must be signed and stamped; submit all formats as per ATC; terms override elsewhere if ambiguity arises.
  • Compliance: All terms must follow the BUYER UPLOADED ATC; non-conforming submissions may be disqualified; CEL reserves right to request only complete documents.

Key Specifications

  • Product/service names: Not specified in available data; refer to BOQ and ATC

  • Quantities: 5 BOQ items; exact quantities not disclosed in accessible data

  • EMD/Estimated value: Not stated in provided text

  • Standards/ Certifications: Not specified in tender data; ATC governs requirements

  • Delivery/Installation: Optional quantity variation up to 25%; delivery period calculation formula provided

Terms & Conditions

  • Option clause allows ±25% quantity changes at contract and during execution

  • Delivery period extension uses formula based on quantity change with a minimum of 30 days

  • All terms derived from BUYER UPLOADED ATC; Annexure A mandatory for bid submission

Important Clauses

Payment Terms

Payment terms are not specified in the accessible data; bidders must reference the ATC for exact terms included in the uploaded document.

Delivery Schedule

Delivery period may extend if quantity increases; new period = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days.

Penalties/Liquidated Damages

Not specified in the provided data; penalties, if any, would be defined in the ATC and contract.

Bidder Eligibility

  • Submit Annexure A signed and stamped per ATC

  • Adhere to terms in BUYER UPLOADED ATC; ensure complete documents

  • Provide all formats and compliance details as per the ATC

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

ST-RDM-0064 , ST-RDM-0063 , ST-RDM-0062 , ST-RDM-0061 Part 1 , ST-RDM-0061 Part 2

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Ghaziabad

Delivery Pincodes

201010

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajat Garg201010,CENTRAL ELECTRONICS LIMITED SAHIBABAD GHAZIABADGhaziabadUttar Pradesh201010230-

Authority Records

MINISTRY OF SCIENCE AND TECHNOLOGYSCIENTIFIC AND INDUSTRIAL RESEARCH DEPARTMENTCENTRAL ELECTRONICS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9678723.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

ST-RDM-0064

FIXTURE FOR SSTS (P N 8358 058 803 96)

2 nos Delivery: 30 days
#2

ST-RDM-0063

SHELL COVERING BAND COVER TOP

2 nos Delivery: 30 days
#3

ST-RDM-0062

SHELL COVERING BAND COVER BOTTOM

2 nos Delivery: 30 days
#4

ST-RDM-0061 Part 1

STUD-FOR MOUNTING RADOME IN VIBRATION FIXTURE Part 1

100 nos Delivery: 30 days
#5

ST-RDM-0061 Part 2

STUD-FOR MOUNTING RADOME IN VIBRATION FIXTURE Part 2

100 nos Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar procurements

4

Financial statements (last 2-3 years)

5

EMD documents as per ATC

6

Technical bid documents and Annexure A

7

OEM authorization/certifications (if applicable)

8

Any other documents specified in the ATC

Frequently Asked Questions

What documents are required for the CEL India tender submission?

Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD as per ATC, technical bid with Annexure A, and OEM authorizations if applicable. Ensure all formats and compliance documents are attached as per the BUYER UPLOADED ATC to avoid disqualification.

How does the 25% quantity variation clause work in CEL tenders?

The purchaser may increase or decrease the bid quantity by up to 25% at contract placement and during execution. The delivery period extension follows (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.

What is required to submit Annexure A for the CEL ATC tender?

Annexure A must be signed and stamped and included with the bid submission. It should align with all compliance formats specified in the ATC. Incomplete Annexure A submissions may lead to technical disqualification.

Where can bidders get clarifications for the CEL DSIR tender 2026?

Bidders should contact the CEL procurement team via [email protected], [email protected], or [email protected] for ATC-specific clarifications, as the ATC supersedes other documents.

Are there any published technical specifications for the 5 BOQ items?

No technical specifications are disclosed in the publicly available data. All technical requirements are defined in the uploaded ATC and Annexure A; bidders must rely on those documents for scope and conformity.

What determines the delivery schedule under this CEL tender?

Delivery scheduling is governed by the option clause and the ATC. If quantity increases, the new delivery period uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What are the eligibility criteria to participate in CEL tenders in 2026?

Eligibility hinges on compliance with the ATC, submission of Annexure A, and full document package including GST, PAN, experience, and financials. Ensure OEM authorizations if required and that all terms from the ATC are met to avoid disqualification.

How to ensure compliance with the BUYER UPLOADED ATC for CEL procurement?

Thoroughly review the ATC document, follow Annexure A requirements, and submit formats exactly as specified. Any deviation can render the bid non-compliant; ensure all mandatory fields and documents are included before submission.