Quantity

196

Category

STABILIZER

Bid Type

Two Packet Bid

Categories 44

Tender Overview

The procuring organization is the Indian Army, Department of Military Affairs. The tender covers a broad mix of household and kitchen items (e.g., stabilizers, fridges, washing machines, mixers, cookware, utensils, bedsheets, curtains, and related accessories) across 43 BOQ items. No explicit location or end-user site is disclosed. Estimated value and EMD are not stated. A key differentiator is the Purchaser’s option to adjust quantities by up to 50% during contract performance, with a formula-driven delivery extension. This signals flexible procurement for bulk needs across multiple product categories.

Technical Specifications & Requirements

  • No technical specifications are provided in the tender snippet beyond item names; 43 items in the BOQ are listed with no quantities.
  • Mandatory bid documents include: PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank.
  • The bid includes an option clause: up to 50% quantity increase at contracted rates; delivery period adjusts via formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Bidders must ensure upload of all required certificates; failure to attach any specified document may lead to rejection.
  • The BOQ items are not numerically defined, signaling a need for bidder clarity on item-wise scope during bid submission.

Terms, Conditions & Eligibility

  • EMD details are not disclosed in the excerpt; bidders must rely on terms in the full bid document.
  • Option Clause permits 50% quantity variation during and after contract, with corresponding delivery time adjustments.
  • Mandatory documents: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate; missing certificates may trigger rejection per ATC.
  • The terms require compliant uploads with any bid document, ATC, or corrigendum; non-compliance risks disqualification.
  • 43 BOQ items indicate a wide product mix, suggesting broad supplier capability is advantageous.

Key Specifications

  • Product/service names: stabilizers, fridge, washing machine 7 kg, curtains, cooler, inverter, inverter battery, setup box, Kirana items, kitchenware, textiles, cookware, glassware, utensils, and miscellaneous household goods

  • BOQ: 43 total items, no predefined quantities in excerpt

  • Delivery extension formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

  • Standards/certifications: Not specified in excerpt

  • Warranty/AMC: Not specified in excerpt

Terms & Conditions

  • Option Clause enables up to 50% quantity variation at contracted rates

  • Delivery time scales with a formula-based extension and minimum 30 days

  • Mandatory submission of PAN, GSTIN,Cancelled Cheque, EFT Mandate

  • Rejection if any required document or certificate is not uploaded

Important Clauses

Payment Terms

Not specified in excerpt; full terms to be confirmed in bid document

Delivery Schedule

Delivery period can extend per option clause formula; minimum 30 days applicable

Penalties/Liquidated Damages

Not specified in excerpt; check ATC for LD provisions

Bidder Eligibility

  • Must upload PAN, GSTIN, Cancelled Cheque, EFT Mandate

  • Capability to supply 43 diverse household/kitchen items

  • Compliance with full bid documentation per ATC and Corrigendum

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

STABILIZER , FRIDGE , WASHING MACHINE 7 KG , CURTAINS , COOLER , INVERTER , INVERTER BATTERY , SETUP BOX , GAMLA TREE PLANTS , MATTRESS , RO KENT , KADAI WITH LID , MIXER GRINDER , INDUCTION COOKTOP , PRESSURE COOKER , GAS CHULA 3 BURNER , FRYPAN , ELECTRIC KETTLE , DINNER SET , BOROSIL GLASS , BUCKETS , PLASTIC MUGS , BATH STOOL , CUTLERY SETS , NAME PLATES , BOWL SET , BATH TOWEL , TABLE CLOTH , PILLOW , CUSHION COVER , CARPET , BEDSHEET , MILTON BOTTLE , BASKET FRUIT , WATER BOTTLE , STEEL CONTAINER , SPOON , DUSTBIN , WATER CAMPER STEEL , TAWA , SAUCE PAN , KITCHEN SERVING SET , CARAFE BOROSIL 1 LTR

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8573472.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 43 Items Sign in for GEM prices

#1

STABILIZER

STABILIZER AS PER SPECIFICATION

4 nos Delivery: 15 days
#2

FRIDGE

FRIDGE AS PER SPECIFICATION

2 nos Delivery: 15 days
#3

WASHING MACHINE 7 KG

WASHING MACHINE 7 KG

1 nos Delivery: 15 days
#4

CURTAINS

CURTAINS

44 nos Delivery: 15 days
#5

COOLER

COOLER

2 nos Delivery: 15 days
#6

INVERTER

INVERTER AS PER SPECIFICATION

2 nos Delivery: 15 days
#7

INVERTER BATTERY

INVERTER BATTERY

2 nos Delivery: 15 days
#8

SETUP BOX

SETUP BOX

1 nos Delivery: 15 days
#9

GAMLA TREE PLANTS

GAMLA TREE PLANTS

20 nos Delivery: 15 days
#10

MATTRESS

MATTRESS

12 nos Delivery: 15 days
#11

RO KENT

RO KENT

2 nos Delivery: 15 days
#12

KADAI WITH LID

KADAI WITH LID

3 nos Delivery: 15 days
#13

MIXER GRINDER

MIXER GRINDER

1 nos Delivery: 15 days
#14

INDUCTION COOKTOP

INDUCTION COOKTOP

1 nos Delivery: 15 days
#15

PRESSURE COOKER

PRESSURE COOKER

2 nos Delivery: 15 days
#16

GAS CHULA 3 BURNER

GAS CHULA 3 BURNER

1 nos Delivery: 15 days
#17

FRYPAN

FRYPAN

2 nos Delivery: 15 days
#18

ELECTRIC KETTLE

ELECTRIC KETTLE

2 nos Delivery: 15 days
#19

DINNER SET

DINNER SET

1 nos Delivery: 15 days
#20

BOROSIL GLASS

BOROSIL GLASS

8 set Delivery: 15 days
#21

BUCKETS

BUCKETS

3 nos Delivery: 15 days
#22

PLASTIC MUGS

PLASTIC MUGS

2 nos Delivery: 15 days
#23

BATH STOOL

BATH STOOL

2 nos Delivery: 15 days
#24

CUTLERY SETS

CUTLERY SETS

3 nos Delivery: 15 days
#25

NAME PLATES

NAME PLATES

2 nos Delivery: 15 days
#26

BOWL SET

BOWL SET

2 nos Delivery: 15 days
#27

BATH TOWEL

BATH TOWEL

4 nos Delivery: 15 days
#28

TABLE CLOTH

TABLE CLOTH

10 mtr Delivery: 15 days
#29

PILLOW

PILLOW

7 nos Delivery: 15 days
#30

CUSHION COVER

CUSHION COVER

12 nos Delivery: 15 days
#31

CARPET

CARPET

1 nos Delivery: 15 days
#32

BEDSHEET

BEDSHEET

8 nos Delivery: 15 days
#33

MILTON BOTTLE

MILTON BOTTLE

2 nos Delivery: 15 days
#34

BASKET FRUIT

BASKET FRUIT

2 nos Delivery: 15 days
#35

WATER BOTTLE

WATER BOTTLE

1 nos Delivery: 15 days
#36

STEEL CONTAINER

STEEL CONTAINER

4 nos Delivery: 15 days
#37

SPOON

SPOON

3 set Delivery: 15 days
#38

DUSTBIN

DUSTBIN

4 nos Delivery: 15 days
#39

WATER CAMPER STEEL

WATER CAMPER STEEL

2 nos Delivery: 15 days
#40

TAWA

TAWA

2 nos Delivery: 15 days
#41

SAUCE PAN

SAUCE PAN

2 nos Delivery: 15 days
#42

KITCHEN SERVING SET

KITCHEN SERVING SET

3 nos Delivery: 15 days
#43

CARAFE BOROSIL 1 LTR

CARAFE BOROSIL 1 LTR

2 nos Delivery: 15 days

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled Cheque copy

4

EFT Mandate copy certified by Bank

5

Certificates uploaded as per Bid Document/ATC/Corrigendum

Reverse Auction Schedule

Completed

Start

10-Dec-2025, 2:00 pm

End

11-Dec-2025, 2:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
BALAJI MARKETING   Under PMA
-26-11-2025 12:18:13
2
DEOKALI ENGINEERING WORKS   Under PMA
-26-11-2025 12:21:20
3
MAHADEV ELECTRICAL ENTERPRISES   Under PMA
-26-11-2025 11:37:14
4
SHREYA ENTERPRISES   Under PMA
-22-11-2025 14:57:13
5
SURESH TRADERS   Under PMA
-18-11-2025 12:39:52
6
TECHLINE ENTERPRISES   Under PMA
-26-11-2025 10:59:08
7
VIMLA ENTERPRISES   Under PMA
-18-11-2025 13:14:54

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1SHREYA ENTERPRISES(MSE,MII)   Under PMA Winner ₹5,09,700Item Categories : STABILIZER,FRIDGE,WASHING MACHINE 7 KG,CURTAINS,COOLER,INVERTER,INVERTER BATTERY,SETUP BOX,GAMLA TR
L2BALAJI MARKETING (MSE,MII)   Under PMA₹5,35,984Item Categories : STABILIZER,FRIDGE,WASHING MACHINE 7 KG,CURTAINS,COOLER,INVERTER,INVERTER BATTERY,SETUP BOX,GAMLA TR
L3TECHLINE ENTERPRISES (MSE,MII)   Under PMA₹5,65,954Item Categories : STABILIZER,FRIDGE,WASHING MACHINE 7 KG,CURTAINS,COOLER,INVERTER,INVERTER BATTERY,SETUP BOX,GAMLA TR

🎉 L1 Winner

SHREYA ENTERPRISES(MSE,MII)   Under PMA

Final Price: ₹5,09,700

Frequently Asked Questions

Key insights about RAJASTHAN tender market

How to bid for Indian Army household items tender 2025

Bidders must submit PAN, GSTIN, cancelled cheque and EFT mandate along with the bid. Ensure all 43 BOQ items are covered, and upload required certificates per ATC. The tender allows up to 50% quantity variation at contracted rates with a formula-based delivery extension; comply with all terms to avoid rejection.

What documents are required for Indian Army procurement bid 2025

Required documents include PAN Card, GSTIN, cancelled cheque, and EFT Mandate certified by a bank. Also upload any certificates specified in the Bid Document or Corrigendum. Missing documentation may lead to bid rejection; ensure all documents are legible and properly scanned.

What is the option clause for quantity variation in Army tender

The purchaser may increase or decrease quantity by up to 50% at contracted rates. Delivery extensions are calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extension can apply within the original delivery window.

What are the delivery terms for Army 2025 procurement

Delivery timing follows the option clause formula, ensuring time extensions scale with quantity changes. The minimum extension is 30 days if original delivery period is short. Verify exact delivery windows in the final contract and ensure capability to scale for 43 item categories.

Which standards or certifications are required for Army tender

The excerpt does not specify ISI/ISO standards; bidders should confirm in the full bid document. Prepare to provide product compliance certificates and any organization-specific qualifications listed in ATC or Corrigendum.

How to verify eligibility criteria for Army 2025 tender in India

Verify eligibility by ensuring submission of PAN, GSTIN, EFT Mandate, and Cancelled Cheque, plus any required experience or financial documents per the ATC. Confirm the 43-item scope and demonstrate capability to supply diverse household and kitchen goods within contract terms.

What is the EMD requirement for Indian Army procurement

The excerpt does not disclose EMD amount; bidders should consult the full bid document. Prepare to attach EMD via the required mode in the tender portal; verify timing, validity, and payment method in the ATC.

When is the submission deadline for Army 2025 tender

Deadline details are not provided in the excerpt. Bidders should refer to the official tender notice and GEM portal for exact submission dates, ensuring documents and certificates are uploaded before the closing time.