Procurement of Anderson make Bellows for MSQU PSVs
Indian Oil Corporation Limited
KAMRUP, ASSAM
The procurement opportunity is issued by Instrumentation Limited under the Department Of Heavy Industry for BELLOWS FOR VA1 HAC (150-300), to be executed as per the attached drawing. The tender scope is defined around a single product category: bellows for a VA1 HAC system within the 150-300 range. The BOQ lists no line items, and the estimated value and quantity are not disclosed. The unique aspect is the explicit option clause allowing quantity fluctuations up to 25% during and after contract award, with delivery timelines tied to the original and extended periods. The tender emphasizes drawing-based compliance and procurement through a government setup, with a focus on precise fabrication as per the attached drawings. This tender requires bidders to align with the purchaser’s right to modify quantity and delivery windows, ensuring flexibility in fulfilling the contract subject to the stated rates. A drawing attachment is a critical differentiator, guiding fabrication tolerances and interface requirements. The environment appears to be a government procurement under a Heavy Industry department, targeting specialized valve-housing components with exact geometries.
Product/service name: BELLOWS FOR VA1 HAC (150-300)
Quantity/BOQ: Not specified; 0 items listed
Estimated value: Not disclosed
Delivery: Not specified; subject to option clause (25% variations)
Standards/Compliance: AS PER DRAWING ATTACHED; no additional standards stated
Manufacturer capability: Precision bellows fabrication for VA1 HAC interface
Warranty: Not specified in data
Option to vary quantity by up to 25% during/after contract with rates held
Delivery period governed by original period and extended period rules
Drawing-based fabrication only; no explicit material or finish standards provided
Not specified in data (terms not provided)
Delivery timelines linked to the last date of original delivery order; time extension formula applied with minimum 30 days
Not specified in data
Fabrication capability for precision bellows per VA1 HAC interface
Compliance with attached drawings for critical dimensions
GST and PAN validity; potential EMD compliance if required
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Oil Corporation Limited
KAMRUP, ASSAM
Bharat Heavy Electricals Limited (bhel)
Nuclear Power Corporation Of India Limited
Bharat Heavy Electricals Limited (bhel)
JHANSI, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar bellows fabrication
Financial statements or turnover evidence
Earnest Money Deposit (EMD) documentation (if applicable)
Technical bid documents aligned to the attached drawings
OEM authorizations or vendor confirmations (if required)
Key insights about KERALA tender market
Bidders must submit drawing-based fabrication documents, GST, PAN, and experience certificates. The contract includes an option to vary quantity up to 25% and delivery terms based on the original and extended periods with a minimum of 30 days added time. Ensure compliance with the attached VA1 HAC drawings and provide OEM authorizations if required.
Required submissions include GST certificate, PAN card, experience certificates for VA1 HAC fabrication, financial statements, EMD documentation if applicable, technical bid aligned to the drawings, and any OEM authorization. Prepare copies and scans for all items to attach to the bid portal.
Specifications are based on AS PER DRAWING ATTACHED; no additional standards listed in data. Fabricate bellows to match the VA1 HAC interface within the 150-300 range, adhering to tolerances defined in the drawing and ensuring fit with adjacent housings described in the attachment.
Delivery timing follows the original delivery schedule, with option-based extensions calculated as (additional quantity ÷ original quantity) × original delivery period, minimum 30 days. If original is under 30 days, the extension equals the original period; the purchaser may extend within the contracted framework.
EMD specifics are not disclosed in the data provided. Bidders should verify the portal or procurement notice for the exact EMD amount, payment method, and validity period, and prepare the deposit or online remittance as required by the issuing organization.
The purchaser reserves the right to vary quantity up to 25% of bid quantity at contract. During currency, the variation may apply at contracted rates, with delivery periods adjusted per the formula, ensuring minimum time extensions and alignment with the original delivery timeline.
Fabrication must strictly conform to the attached VA1 HAC drawings. No other standards are listed in the data, so bidders should use the drawings as the sole technical guide, ensuring dimensional accuracy, interface compatibility, and surface finish per drawing notes.
If required, provide OEM authorization or supplier authorization confirming capability to manufacture the bellows per VA1 HAC drawings. Attach the authorization letter to the technical bid and ensure it covers manufacturing scope, quality control, and warranty support per contract terms.
Sign up now to access all documents
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS