Bid Publish Date
10-Aug-2026, 11:58 am
Bid End Date
20-Aug-2026, 12:00 pm
Location
Progress
The opportunity is issued by the Durgapur Steel Plant under the Steel Authority of India Limited for a converter/inverter frequency equipment with a nominal rating of 110KW. Located in BARDHAMAN, WEST BENGAL (PIN 713101), this procurement involves a single, high-power electrical conversion solution. While the BOQ shows zero items and the BOQ quantity remains unspecified, the contract scope centers on supply and commissioning of a 110KW converter/inverter system within the plant’s electrical infrastructure. The tender reference to the category underscores a focus on power-electronic equipment suitable for heavy industrial applications. Bidders should note the absence of detailed technical specs in the available data, which elevates the importance of compliance with IS standards and OEM authorizations if specified later. The procurement context aligns with ongoing plant reliability upgrades and equipment modernization efforts. The unique aspect is the explicit location specificity and high-power rating tied to a renowned national steel producer, signaling rigorous quality expectations and after-sales support.
Product/service names and category: 110KW converter/inverter frequency equipment
Estimated value: Not disclosed; EMD amount not provided
Delivery location: Durgapur Steel Plant, Bardhaman, West Bengal
Experience/eligibility: Not explicitly defined; likely required for heavy electrical equipment suppliers
Standards/certifications: Not specified; bidders should reference IS/IEC standards and OEM authorizations as applicable
EMD amount and payment terms to be provided in ATC
Delivery schedule to be clarified in buyer terms and ATC
Documentation: GST, PAN, experience and financials, OEM authorizations, technical bid
Not specified in current data; bidders must check ATC for advance/ milestone payments and acceptance criteria
Delivery timelines to be confirmed in official terms; bidders should prepare lead-time and installation windows
No LD details available; verify LD percentage and conditions in ATC
Experience in supplying high-power electrical converter/inverter equipment to large-scale industrial facilities
GST registration and PAN validity
OEM authorization or proven tie-up with UL/IEC/IS-standard compliant equipment
Quantity
3
Bid Type
Two Packet Bid
Bid Validity
95 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
CONVERTER/INVERTER, FREQUENCY, 110KW- 4203085625 (015)
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Paschim Bardhaman
Delivery Pincodes
713203
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| VIVEK KUMAR MAURYA | 713203,Central Stores Building, Central Stores Department, Durgapur Steel Plant, Durgapur-713203 | Paschim Bardhaman | West Bengal | 713203 | 3 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about WEST BENGAL tender market
Bidders should monitor the official ATC, prepare GST, PAN, financials, and experience certificates, and secure OEM authorizations. The 110KW converter/inverter scope requires compliance with standard electrical specifications and plant integration. Ensure delivery lead times align with steel plant project schedules and submit a complete technical bid with all required documents.
Submit GST certificate, PAN card, at least two years of financial statements, experience certificates for similar equipment, EMD documentation, technical bid, and OEM authorization or supplier commitments. Ensure all documents reflect current company details and are notarized where needed.
Specific 110KW converter/inverter details are not provided; bidders should rely on standard 110KW power electronics specs, including voltage/current ratings, cooling method, protection features, and OEM warranty terms, plus compliance with applicable IS/IEC standards and safety certifications.
Delivery timeline is not disclosed in the available data; bidders must confirm lead times, installation windows, and commissioning schedules in the ATC and respond with a feasible schedule during bid submission.
Payment terms are not specified here; bidders should verify whether payments are milestone-based or against delivery acceptance in the ATC, and prepare accordingly, including any required performance security or retention on completion.
Ensure GST and PAN validity, demonstrate prior experience with similar 110KW equipment, provide financial statements, and secure OEM authorization or strong OEM-backed supplier credentials. Compliance with IS/IEC standards and safe installation capabilities are typically required.
Bidders usually must show IS/IEC compliance, ISI/BIS markings if specified, OEM certifications, and safety/quality management accreditations (like ISO 9001). Prepare warranty terms, service commitments, and after-sales support indicators for the equipment and plant integration.
The available data indicates supply of a 110KW converter/inverter frequency unit for Durgapur Steel Plant, Bardhaman. The exact scope, installation, and commissioning responsibilities will be detailed in the ATC; bidders should plan for potential site adaptation and integration tasks.