Central Electronics Limited invites bids under the DSIR framework for a multi-part ST-ECD procurement covering ST-ECD-302 Part 1, Part 2, ST-ECD-303, ST-ECD-304 Part 1, and ST-ECD-304 Part 2, located in Ghaziabad, Uttar Pradesh. The tender comprises 5 BOQ items with details consolidated in the ATC Annexure A. Key terms include an option to vary quantity by up to 25%, and delivery windows aligned to the purchase order. The contract emphasizes adherence to ATC-dictated technical specifications and the need for sign-off copies of Annexure A. Estimated value and exact item descriptions remain pending in the standard GeM BOQ. This procurement is positioned to ensure DSIR-related equipment or services meet the attached ATC standards.
Annexure A governs all technical specs; exact items and performance metrics reside there
Delivery schedule: 60 days from PO; payment: 45 days post-delivery and documents
5 BOQ items; detailed descriptions are in ATC due to GeM BOQ limitations
No explicit standard list publicly; bidders must follow ATC-clause requirements
Sign and stamp required on ATC document copy for compliance
Delivery within 60 days from PO; payment within 45 days
ATC Annexure A governs all technical specs
Quantity may vary by ±25% during and after contract
60 days from PO; extended time cannot exceed original delivery period unless option clause is exercised.
Payment within 45 days of receipt of material and required documents; no advance payment specified in public data.
Purchaser may modify quantity by ±25% during contract at contracted rates.
Proven ability to meet Annexure A technical specifications
Compliance with 60-day delivery and 45-day payment terms
Financial capacity to handle ±25% quantity variations
Quantity
40
Category
ST-ECD-302 Part 1
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
ST-ECD-302 Part 1 , ST-ECD-302 Part 2 , ST-ECD-303 , ST- ECD-304 part 1 , ST-ECD-304 part 2
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Ghaziabad
Delivery Pincodes
201010
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rajat Garg | 201010,CENTRAL ELECTRONICS LIMITED SAHIBABAD GHAZIABAD | Ghaziabad | Uttar Pradesh | 201010 | 10 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
ST-ECD-302 Part 1
Alumina Crucibles with Lid 99.7% or above Alumina High Form (Complete Details as per Technical Specification sheet at ATC of GeM Bid document)
ST-ECD-302 Part 2
Alumina Crucibles with Lid 99.7% or above Alumina High Form (Complete Details as per Technical Specification sheet at ATC of GeM Bid document)
ST-ECD-303
Alumina Tray with Lid 99.7% or above Alumina Crucible (Complete Details as per Technical Specification sheet at ATC of GeM Bid document)
ST-ECD-304 part 1
Alumina Tray withLid(Calcination) 99.7% or above Alumina Crucible (Complete Details as per Technical Specification sheet at ATC of GeM Bid document)
ST-ECD-304 part 2
Alumina Tray withLid (Calcination) 99.7% or above Alumina Crucible (Complete Details as per Technical Specification sheet at ATC of GeM Bid document)
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | ST-ECD-302 Part 1 | Alumina Crucibles with Lid 99.7% or above Alumina High Form (Complete Details as per Technical Specification sheet at ATC of GeM Bid document) | 10 | nos | [email protected] | 60 | |
| 2 | ST-ECD-302 Part 2 | Alumina Crucibles with Lid 99.7% or above Alumina High Form (Complete Details as per Technical Specification sheet at ATC of GeM Bid document) | 10 | nos | [email protected] | 60 | |
| 3 | ST-ECD-303 | Alumina Tray with Lid 99.7% or above Alumina Crucible (Complete Details as per Technical Specification sheet at ATC of GeM Bid document) | 10 | nos | [email protected] | 60 | |
| 4 | ST-ECD-304 part 1 | Alumina Tray withLid(Calcination) 99.7% or above Alumina Crucible (Complete Details as per Technical Specification sheet at ATC of GeM Bid document) | 5 | nos | [email protected] | 60 | |
| 5 | ST-ECD-304 part 2 | Alumina Tray withLid (Calcination) 99.7% or above Alumina Crucible (Complete Details as per Technical Specification sheet at ATC of GeM Bid document) | 5 | nos | [email protected] | 60 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates demonstrating relevant DSIR/Annexure A work
Financial statements or solvency documents
EMD/Security deposit as per ATC (if applicable)
Technical bid documents and compliance with Annexure A
OEM authorizations or confirmations if required by ATC
Sign and stamp of Annexure A copy
Key insights about UTTAR PRADESH tender market
Bidders must review Annexure A in the ATC document, ensure sign-off copies are included, and submit GST, PAN, experience credentials, and financial statements. Delivery is 60 days from PO, payment within 45 days. Ensure 25% quantity variation readiness and compliance with GeM BOQ limitations.
Required documents include GST registration, PAN, experience certificates in DSIR-related work, financial statements, EMD documentation if applicable, OEM authorizations, technical compliance with Annexure A, and a sign-stamped copy of Annexure A. Ensure all items align with ATC guidelines.
Delivery must be completed within 60 days from the purchase order date, while payment is due within 45 days of receipt of material and required documents. No separate advance payment is stated; ensure timely documentation accompanying shipments.
Complete technical specifications reside in Annexure A of the ATC document linked in the GeM tender. Bidders must sign and stamp this Annexure A copy to demonstrate compliance with exact performance, testing, and qualification criteria.
The purchaser may increase or decrease the bid quantity by up to 25% of the bid quantity at contract placement and during the currency of the contract at the contracted rates, with delivery extension rules defined in the option clause.
Annexure A contains the definitive technical specifications and terms; it supersedes elsewhere. Bidders must review, sign, and stamp Annexure A to ensure all performance, testing, and eligibility criteria are met for the DSIR procurement.
Eligibility requires adherence to Annexure A specs, ability to deliver within 60 days, payment acceptance within 45 days, and capacity to handle ±25% quantity changes. Submit GST, PAN, experience certificates, and financials, plus OEM authorizations if mandated.
Item descriptions are detailed in Annexure A; bidders should cross-check the final BOQ with Annexure A to ensure correct item codes, quantities, and technical requirements before submission.