Online Ups Modular Type
Panchayat Raj Commissionerate Karnataka
CHICKMAGALUR, KARNATAKA
Progress
Quantity
2
Bid Type
Two Packet Bid
Bharat Sanchar Nigam Limited Portal(bsnl) announces a tender for Online Ups Modular Type (Q3) in BANGALORE, KARNATAKA. Quantity: 2. Submission Deadline: 08-06-2026 11: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Online Ups Modular Type (Q3)
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Panchayat Raj Commissionerate Karnataka
CHICKMAGALUR, KARNATAKA
Indian Air Force
JAMNAGAR, GUJARAT
Indian Air Force
JAMNAGAR, GUJARAT
State Bank Of India (sbi)
Rangareddi, TELANGANA
Office Of Dg (ace)
PUNE, MAHARASHTRA
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Output power capacity including redundancy/Expandable (Rack facility) upto/Minimum backuptime (including redundancy) /Minimum VAH (VAH shall be calculated Battery voltage x Battery Ah x No. of batteries = Total VAH) | 120 KVA / 125 KVA / 30 Minutes / 76800 VAH |
| GENERIC | Noise level | |
| INPUT | In put Voltage Range | 320 V to AC to 470 V AC 3 Phase |
| INPUT | Input frequency range | 50 +/-6% Hz, 50 +/-10% Hz |
| INPUT | Distortion (current) | < / = 3% |
| OUTPUT | Output powr factor | >/=0.99 |
| CONSTRUCTION | Minimum thickness (in mm) of Rack Enclosure for Modular UPS duly powder coated | 2.0, 1.2, others |
| CONSTRUCTION | UPS enclosure's degree of protection as per IS:13947 (Part 1)/1993 latest | IP21, IP20 |
| CONSTRUCTION | Total Harmonic Distrotion (THD) for 100% linear load | < 3%, < 2% |
| CONSTRUCTION | Total Harmonic Distrotion (THD) for 100% non-linear load | < 5%, < 4% |
| CONSTRUCTION | Over all efficiency on rated full load of 0.8 PF (min.) AC output | >/=96% |
| CONSTRUCTION | Inverter efficiency on rated full load of 0.8 PF (min.) AC output | >/=95% |
| CONSTRUCTION | UPS shall withstand Over load capacity - 125% (Output with mains AC-AC) | for 5 Minutes (Minimum), for 10 Minutes (Minimum) |
| CONSTRUCTION | UPS shall withstand Over load capacity - 125% (Output in battery run DC-AC) | for 2 Minutes (Minimum) |
| BATTERY | Battery type | SMF VRLA, SMF VRLA, Modular Hot swappable Battery modules, Lithium Ion Battery [ as per IS 16046 (part 2)/ IEC 62133-2 and as per IEC 62485-5] |
| BATTERY | Battery recharge time (after complete discharge to 90% charge) and charge rating: Battery recharge time to 90% charge after 100% DoD | 8 to 10 hours, 4 to 8 hours |
| BATTERY | Batteries shall supply with | With metal rack, With Modular cabinet having hot swappable battery |
| WARRANTY AND SERVICES | Warranty for Modular UPS (on site comprehensive warranty) (in years) | 3, 5, others |
| WARRANTY AND SERVICES | Warranty for battery (replacement warranty) (in years) | 2, 3, 5, others |
| WARRANTY AND SERVICES | After sales and complaint service | within 24 hours |
| WARRANTY AND SERVICES | PAN India service support on 24 x 7 basis | Yes |
| WARRANTY AND SERVICES | AMC support available after 3 year warranty | Yes |
| WARRANTY AND SERVICES | Quarterly preventive maintenance | Yes |
| WARRANTY AND SERVICES | Manufacturer shall provide and support for installation, commissioning, spares, technical support all over India | Yes |
| WARRANTY AND SERVICES | Availability of spares in close proximity (Spares should be easily available close to the site) | Yes |
| CERTIFICATIONS | CE Certification and marking | Yes |
| CERTIFICATIONS | Damp Heat Test : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C,two cycles of (12+12) hours each 2007) | Yes |
| CERTIFICATIONS | Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs | Yes |
| CERTIFICATIONS | Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. | Yes |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
08-Jun-2026, 11:00 am
Opening Date
08-Jun-2026, 11:30 am
Extended Deadline
01-Jun-2026, 11:00 am
Opening Date
01-Jun-2026, 11:30 am
Indian Air Force
📍 BANGALORE, KARNATAKA
Indian Army
📍 CENTRAL DELHI, DELHI
North Eastern Indira Gandhi Regional Institute Of Health And Medical Sciences (neigrihms)
Oriental Insurance Company Ltd
📍 FARIDABAD, HARYANA
Jilla Sahakari Kendriya Bank Maryadit, Bilaspur
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS