BHEL Bhopal Cable Routing Underframe Tender 2025: IS0 IFC Drawings Al Conduit 30M Warranty
N/A
BHOPAL, MADHYA PRADESH
Bid Publish Date
31-Oct-2025, 9:26 am
Bid End Date
15-Nov-2025, 3:00 pm
Location
Progress
Quantity
5
Bharat Heavy Electricals Limited (BHEL) Bhopal invites bids for the procurement and installation of UNDERFRAME CABLE ROUTING AND ITS DUCT/TRAY ARRANGEMENT (ALONG WITH AL CONDUIT) as per IFC drawings SPICAC-7-1-001-COL-I and SPICAC-7-1-002. The scope covers 5 units in Lot 1 with a delivery window of 84 days (approximately 12 weeks). The award includes a 30-month warranty from the date of supply and requires compliant OEM certificates, MSE/UDYAM declarations, and Make in India documentation. Delivery is subject to inspection at BHEL Bhopal; early delivery is allowed with BHEL confirmation. The quoted price must include GST and applicable charges. Inspectable materials must be packed to prevent transit damage and payment terms grant 100% payment within 90 days (or 45 days for MSE, 60 days for certain enterprises).
Product/Service: UNDERFRAME CABLE ROUTING AND ITS DUCT/TRAY ARRANGEMENT with AL conduit
Drawing reference: IFC SPICAC-7-1-001-COL-I and SPICAC-7-1-002
Quantity: Lot 1 = 5 units
Delivery: 84 days from award
Warranty: 30 months from supply
Payment: 100% within 90 days (45 days for MSE, 60 days for certain entities)
Inspection: BHEL Bhopal
Packaging: transit-damage protection
Delivery window fixed at 84 days with potential early delivery by confirmation
100% payment term within 90 days; modified terms for MSEs per policy
30-month warranty from date of supply; GST and other charges included
100% payment within 90 days, 45 days for MSE, 60 days for medium enterprises as per inclusion of Udyam status, on receipt/acceptance per BHEL terms
Lot 1 quantity 5 units to be delivered within 84 days; early delivery allowed subject to BHEL confirmation
Warranty period of 30 months from supply; penalties or LD to be as per contract terms (not specified here)
OEM certificate for supplied item
MSE (UDYAM) certification (if applicable)
Make in India declaration
Conflict of interest disclosure as per tender terms
Tender Category
Goods
Bid To RA
No
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
N/A
BHOPAL, MADHYA PRADESH
Indian Air Force
JALANDHAR, PUNJAB
Bharat Heavy Electricals Limited
BENGALURU URBAN, KARNATAKA
N/A
CHENNAI, TAMIL NADU
N/A
BEGUSARAI, BIHAR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
OEM/commercially signed OEM Authorization (if applicable)
MSE/UDYAM Certificate (if applicable)
Make in India Declaration (signed & sealed)
Duly filled, signed & sealed compliance to technical specifications
Duly filled, signed & sealed compliance to drawings
Compliance to Commercial Terms & ATC (signed & sealed)
Technical bid documents and EMD (if required in ATC)
Extended Deadline
15-Nov-2025, 3:00 pm
Opening Date
15-Nov-2025, 3:30 pm
Key insights about MADHYA PRADESH tender market
Bidders should submit OEM certificates, MSE/UDYAM if applicable, Make in India declaration, signed compliance to technical specs and drawings, and ATC documents. Ensure GST/PAN, and packaging requirements are met. Delivery is 84 days, with 30-month warranty and 100% payment within 90 days after inspection acceptance.
Required documents include GST certificate, PAN, OEM authorization, MSE/UDYAM certificate if applicable, Make in India declaration, signed technical and drawing compliance, and ATC/commercial compliance. Also provide inspection readiness for BHEL Bhopal and proper packaging details to prevent transit damage.
Specifications reference IFC drawings SPICAC-7-1-001-COL-I and SPICAC-7-1-002. Scope includes underframe cable routing and duct/tray arrangement with aluminum conduit. Delivery quantity is 5 units in Lot 1; confirm compliance with drawings and provide OEM certificate with drawings.
Payment is 100% within 90 days from receipt on acceptance of material per BHEL standard terms; for MSE applicants, timeline is reduced to 45 days, and 60 days for certain medium enterprises per policy.
Inspection is conducted at BHEL Bhopal site. Bidder must arrange for inspection of delivered items at the customer site prior to acceptance and payment release as per terms.
Submit a signed Make in India Declaration and an active MSE (UDYAM) Certificate if applicable; ensure declarations are included in the bid packet and sealed per submission guidelines.
The contract requires a 30-month warranty from the date of supply, covering material and workmanship; failures within this period may necessitate replacement or repair under terms specified in the agreement.
Early delivery is permissible if BHEL provides confirmation; bidders should plan for 84-day standard delivery and prepare for potential expedited processing upon approval.
PHE
📍 JAMMU, JAMMU AND KASHMIR
Mishra Dhatu Nigam Limited (midhani)
📍 HYDERABAD, TELANGANA
Haryana Board Corporation
📍 PANCHKULA, HARYANA
TNEB Limited
📍 CHENNAI, TAMIL NADU
Sign up now to access all documents
Main Document
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS