Indian Coast Guard Air Compressor Unit with Digital Control Monitoring Panel Tender 2026 – Defence Sector

Bid Publish Date

31-Aug-2026, 9:29 am

Bid End Date

10-Sep-2026, 10:00 am

Progress

Issue31-Aug-2026, 9:29 am
Technical09-Aug-2026, 8:56 am
Financial
AwardCompleted

Key Highlights

  • • Indian Coast Guard procurement for air compressor unit with Digital Control Monitoring Panel
  • • Defence sector installation requiring DCMP integration
  • • 25% quantity variation with defined extended delivery rules
  • • Need for OEM authorizations and technical compliance certificates

Tender Overview

The opportunity is issued by the Indian Coast Guard under the Department of Defence for the procurement/installation of an air compressor unit with a Digital Control Monitoring Panel (DCMP). The exact location is not specified, and the BOQ contains no listed quantities. The project scope centers on setting up the compressor unit and the accompanying DCMP as per specification. The lack of detailed dates or value requires bidders to seek clarifications and prepare a technically compliant proposal that demonstrates capability to deliver a complete installation package, including control monitoring integration. The key differentiator is the integration of a DCMP with industrial air compression equipment under defence procurement rules, with potential for quantity adjustment under the option clause.

Technical Specifications & Requirements

  • Product/service: Air compressor unit installation with Digital Control Monitoring Panel (DCMP) for Coast Guard use
  • Status: No explicit technical specs provided in the tender data; bidders must rely on standard air compressor installation practices and any Coast Guard/defence electrical panel integration requirements
  • Scope indicators: Installation, commissioning, and DCMP integration; no BOQ items or estimated value listed
  • Compliance expectations: Prepared to demonstrate capability for marine/defence environment installations; ensure electrical safety and panel interoperability with existing systems
  • Documentation readiness: Submit technical compliance certificates and OEM authorizations as applicable; seek clarification on location, capacity, and standards
  • Unspecified elements: Delivery timeline and payment terms require firm clarification from issuing authority

Terms, Conditions & Eligibility

  • Quantity adjustment: Purchaser may increase/decrease order up to 25% of bid quantity; extended delivery periods calculated with a minimum of 30 days
  • Delivery timing: From last date of original delivery order; extended period rules apply if option exercised
  • Compliance: Bidders must adhere to option clause and amendment procedures
  • Documentation: Prepare standard tender documents and be ready for defence procurement norms; verify GSTIN and PAN requirements
  • EMD/Payments: Specific amounts and terms not provided; assume standard government EMD and staged payments per contract
  • Warranty/Guarantees: Not specified; bidders should seek explicit terms during clarification

Key Specifications

    • Product: Air compressor unit with Digital Control Monitoring Panel (DCMP)
    • Environment: Defence/Coast Guard operational setting; integration with existing control systems
    • Documentation: OEM authorization and technical compliance certificates
    • Delivery/Installation: Complete setup, commissioning, and handover
    • Standards: To be confirmed; bidders should propose IS/IEC electrical safety and control standards

Terms & Conditions

  • Option clause allows ±25% quantity variation and extended delivery periods with minimum 30 days

  • Delivery starts from the last date of the original delivery order; extensions follow calculated formula

  • Submit standard bid documents and OEM authorizations; seek explicit EMD and payment terms during clarification

Important Clauses

Payment Terms

Not specified in provided data; bidders must obtain exact terms during clarification and ensure EMD compliance as per defence procurement norms

Delivery Schedule

Delivery begins after original delivery order date; option-based additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified; bidders should confirm LD terms during clarification and align with standard govt procurement penalties

Bidder Eligibility

  • Experience in air compressor installation and DCMP integration for defence/marine environments

  • Demonstrated financial stability with requisite turnover and liquidity

  • Compliance with GST, PAN, and OEM authorization requirements

Advertisement

Authority & Contact

Organization

Indian Coast Guard

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
AIR TECH ENGINEERS   Under PMA
Make : PARTH TECH Model : PT 75 T Title : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION08-09-2026 14:26:41
2
ANGEL INDUSTRIAL INSTRUMENTATION   Under PMA
Make : Angel Model : AII-7 Title : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION10-09-2026 09:54:21
3
JAAN ENTERPRISES   Under PMA
Make : Other Model : UNBRANDED Title : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION09-09-2026 23:16:21
4
Jet Age Garage Equipments   Under PMA
Make : jetage Model : JAC 250 Title : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION09-09-2026 18:21:22
5
MARINETECH SHIP MANAGERS & SURVEYORS   Under PMA
Make : TOYO Model : SLDTY-6 Title : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION09-09-2026 14:23:44
6
SHRI MAHALAXMI TRADERS   Under PMA
Make : UNIVERSAL Model : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL Title : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION09-09-2026 18:59:05
7
ZARIVINAYAK ENTERPRISES   Under PMA
Make : Other Model : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL C Title : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION10-09-2026 00:04:41

Financial Results

Rank Seller Price Item
L1
Jet Age Garage Equipments(MSE)( MSE Social Category:General )    Under PMA
Item Categories : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION
L2
AIR TECH ENGINEERS (MSE)( MSE Social Category:General )    Under PMA
Item Categories : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION
L3
ZARIVINAYAK ENTERPRISES   Under PMA
Item Categories : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION
L4
JAAN ENTERPRISES   Under PMA
Item Categories : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION
L5
SHRI MAHALAXMI TRADERS   Under PMA
Item Categories : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION
L6
MARINETECH SHIP MANAGERS & SURVEYORS   Under PMA
Item Categories : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION
L7
ANGEL INDUSTRIAL INSTRUMENTATION (MSE)( MSE Social Category:General )    Under PMA
Item Categories : SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

40 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SETTING UP AIR COMPRESSOR UNIT ALONGWITH DIGITAL CONTROL MOINTORING PANEL AS PER SPECIFICATION

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Ratnagiri

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-RatnagiriRatnagiri--130-

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9823450.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 15

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar air compressor/DCMP installations

4

Financial statements demonstrating financial capability

5

EMD submission documents (as specified by buyer) and payment method

6

Technical bid documents demonstrating compliance with DCMP integration

7

OEM authorization or manufacturer support letters for air compressor & DCMP

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for the Coast Guard air compressor DCMP tender in 2026?

Bidders should prepare OEM authorizations, GST and PAN, experience certificates for similar installations, and financial statements. The tender requires technical compliance for a DCMP-integrated air compressor, with EMD submission and standard defence procurement documents. Clarifications will define exact EMD and delivery terms.

What documents are required for the air compressor tender in India coast guard?

Required documents include GST certificate, PAN, company financials, experience certificates for similar projects, OEM authorization letters for air compressor and DCMP, and technical bid documents showing compliance with integration standards and safety norms.

What are the delivery terms for the 2026 coast guard compressor project?

Delivery begins from the last date of the original delivery order; option quantities can extend total delivery time. The exact schedule will be clarified; ensure readiness to adjust up to 25% quantity and compute time extensions per the formula with a minimum of 30 days.

What standards and certifications apply to the DCMP integration?

Bidders should propose IS/IEC electrical safety and control standards for the DCMP integration with the air compressor. OEM certifications and product compliance certificates must be provided to verify suitability for defence/marine environments.

What is the EMD requirement for the defence air compressor tender?

The EMD amount is not specified in the data provided; bidders must obtain exact EMD details during the clarification phase and submit as per defence procurement norms along with bid security.

How to prepare for the option clause quantity variations?

Prepare to supply up to 25% more or fewer units than bid quantity. The adjusted delivery period uses (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days, ensuring compliance with extended timelines.