Bid Publish Date
28-Sep-2026, 11:36 am
Bid End Date
10-Oct-2026, 9:00 am
Location
Progress
The Indian Army through the Department Of Military Affairs invites bids for a package of LV7 T-815 vehicle components, including pinion, resistor, engagement clutch bush, self lubricating bearing, rotor C W carrier, switch coil, coil system, horn valve, field coil auxiliary, relay, drive assembly, solenoid switch, tie rod steering, hydraulic hand pump, water pump, and brake shoe assembly. No explicit start/end dates are published; the procurement covers 16 distinct items across heavy-vehicle subsystems. The category emphasizes critical spares and assemblies for military wheeled platforms, with emphasis on compatibility and supplier capability to deliver complex components. A unique differentiator is the integration of varied LV7 subsystems under one combined tender package, requiring coordinated supply chain readiness and multi-item compliance.
LV7 T-815 and related LV7 series components: 16 distinct items listed
No explicit standards published in data; ensure OEM compatibility and LV7 platform fit
Warranty terms specify 7 days for defect rectification; penalties 0.5% per week, max 10% contract value
Option clause allows ±25% quantity variation at contracted rates during contract lifecycle
Delivery extension calculations: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Option for quantity variation up to 25% at contracted rates
Warranty term with 0.5% weekly penalty and 10% contract cap
Sample approval required before bid opening and defence-sector past performance data needed
Not specified; penalties may be recovered via PBG in warranty failures
Delivery period extends from last date of original order; minimum 30 days for extensions; 25% quantity variation permitted
0.5% of unit price per week for defect rectification delay; cumulative limit 10% of total contract value
Financial stability; not under liquidation or bankruptcy
Past defence sector performance in last two financial years
Ability to supply 16 LV7 components and OEM authorizations
Quantity
53
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Warranty Period
7 days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Item Category
LV7 T-815 443-937-150-130 Pinion , LV7 T-815 443-938- 412-460 Resistor , LV7 T-815 443-932-251-150 Engagement clutch bush , LV7 T-815 443-932-000-600 Self Lubricating Bearing , LV7 T-815 443-930-154-880 Rotor C W carrier , LV7 T-815 443-938-329-100 Switch Coil , LV7 T-815 443- 930-151-110 Coil System , LV7 T-815 443-319-032-000 Horn Valve , LV7 TATA 000-151-0109J Field coil auxiliary , LV7 TATA 2064-5450-4901 Relay , LV7 TATA L01402000031 Drive Assy , LV7 TATA L01402000027 Solenoid Switch , LV7 MG 48870M70A22 Tie Rod steering , LV7 STLN 4320- 004125 Pump hydraulic Ram hand driven , LV7 STLN VF B- 7016011 S A Water Pump , LV7 RE 2530-017934 144570 Brake shoe assy
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Patiala
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Patiala | Patiala | - | - | 5 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
LV7 T-815 443-937-150-130 Pinion
LV7/T-815 443-937-150-130 Pinion
LV7 T-815 443-938-412-460 Resistor
LV7/T-815 443-938-412-460 Resistor
LV7 T-815 443-932-251-150 Engagement clutch bush
LV7/T-815 443-932-251-150 Engagement clutch bush
LV7 T-815 443-932-000-600 Self Lubricating Bearing
LV7/T-815 443-932-000-600 Self Lubricating Bearing
LV7 T-815 443-930-154-880 Rotor C W carrier
LV7/T-815 443-930-154-880 Rotor C/W carrier
LV7 T-815 443-938-329-100 Switch Coil
LV7/T-815 443-938-329-100 Switch Coil
LV7 T-815 443-930-151-110 Coil System
LV7/T-815 443-930-151-110 Coil System
LV7 T-815 443-319-032-000 Horn Valve
LV7/T-815 443-319-032-000 Horn Valve
LV7 TATA 000-151-0109J Field coil auxiliary
LV7/TATA 000-151-0109J Field coil auxiliary
LV7 TATA 2064-5450-4901 Relay
LV7/TATA 2064-5450-4901 Relay
LV7 TATA L01402000031 Drive Assy
LV7/TATA L01402000031 Drive Assy
LV7 TATA L01402000027 Solenoid Switch
LV7/TATA L01402000027 Solenoid Switch
LV7 MG 48870M70A22 Tie Rod steering
LV7/MG 48870M70A22 Tie Rod steering
LV7 STLN 4320-004125 Pump hydraulic Ram hand driven
LV7/STLN 4320-004125 Pump hydraulic Ram hand driven
LV7 STLN VF B-7016011 S A Water Pump
LV7/STLN(VF) B-7016011 S/A Water Pump
LV7 RE 2530-017934 144570 Brake shoe assy
LV7/RE 2530-017934 (144570) Brake shoe assy
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | LV7 T-815 443-937-150-130 Pinion | LV7/T-815 443-937-150-130 Pinion | 5 | nos | rakesh.534 | 180 | |
| 2 | LV7 T-815 443-938-412-460 Resistor | LV7/T-815 443-938-412-460 Resistor | 5 | nos | rakesh.534 | 180 | |
| 3 | LV7 T-815 443-932-251-150 Engagement clutch bush | LV7/T-815 443-932-251-150 Engagement clutch bush | 5 | nos | rakesh.534 | 180 | |
| 4 | LV7 T-815 443-932-000-600 Self Lubricating Bearing | LV7/T-815 443-932-000-600 Self Lubricating Bearing | 5 | nos | rakesh.534 | 180 | |
| 5 | LV7 T-815 443-930-154-880 Rotor C W carrier | LV7/T-815 443-930-154-880 Rotor C/W carrier | 4 | nos | rakesh.534 | 180 | |
| 6 | LV7 T-815 443-938-329-100 Switch Coil | LV7/T-815 443-938-329-100 Switch Coil | 5 | nos | rakesh.534 | 180 | |
| 7 | LV7 T-815 443-930-151-110 Coil System | LV7/T-815 443-930-151-110 Coil System | 5 | nos | rakesh.534 | 180 | |
| 8 | LV7 T-815 443-319-032-000 Horn Valve | LV7/T-815 443-319-032-000 Horn Valve | 1 | nos | rakesh.534 | 180 | |
| 9 | LV7 TATA 000-151-0109J Field coil auxiliary | LV7/TATA 000-151-0109J Field coil auxiliary | 3 | nos | rakesh.534 | 180 | |
| 10 | LV7 TATA 2064-5450-4901 Relay | LV7/TATA 2064-5450-4901 Relay | 3 | nos | rakesh.534 | 180 | |
| 11 | LV7 TATA L01402000031 Drive Assy | LV7/TATA L01402000031 Drive Assy | 3 | nos | rakesh.534 | 180 | |
| 12 | LV7 TATA L01402000027 Solenoid Switch | LV7/TATA L01402000027 Solenoid Switch | 3 | nos | rakesh.534 | 180 | |
| 13 | LV7 MG 48870M70A22 Tie Rod steering | LV7/MG 48870M70A22 Tie Rod steering | 2 | nos | rakesh.534 | 180 | |
| 14 | LV7 STLN 4320-004125 Pump hydraulic Ram hand driven | LV7/STLN 4320-004125 Pump hydraulic Ram hand driven | 2 | nos | rakesh.534 | 180 | |
| 15 | LV7 STLN VF B-7016011 S A Water Pump | LV7/STLN(VF) B-7016011 S/A Water Pump | 1 | nos | rakesh.534 | 180 | |
| 16 | LV7 RE 2530-017934 144570 Brake shoe assy | LV7/RE 2530-017934 (144570) Brake shoe assy | 1 | nos | rakesh.534 | 180 |
GST registration certificate
PAN card
Experience certificates from defence sector (last two financial years: 2023-24, 2024-25)
Financial statements or solvency certificates
EMD/Security deposit documentation (if applicable)
Technical bid documents confirming OEM authorization for LV7 T-815 compatible parts
Sample approval documentation (pre-bid) if requested
Past performance records from defence sector bidders
Bid submission requires GST, PAN, experience certificates, financial statements, and OEM authorizations; ensure past defence sector performance for 2023-24 and 2024-25; sample approval is required before bid opening and be prepared for 16 LV7 component lines.
Submit GST certificate, PAN card, two years defence past performance proofs, financial statements, EMD documentation, OEM authorization letters, and technical compliance data showing LV7 compatibility; sample approval documents must be available prior to opening.
Delivery can extend with a minimum 30 days; quantity variation up to 25% of contracted quantity; extension time = (Increased quantity ÷ Original quantity) × Original delivery period, ensuring delivery aligns with last delivery order date.
Warranty defects must be rectified within 7 days of notification; penalties are 0.5% of unit price per week of delay; total penalties capped at 10% of contract value; penalties may be recovered via PBG or from the seller's funds.
The package covers 16 items: pinion, resistor, engagement clutch bush, self-lubricating bearing, rotor C W carrier, switch coil, coil system, horn valve, field coil auxiliary, relay, drive assembly, solenoid switch, tie rod steering, hydraulic hand pump, water pump, brake shoe assembly.
Bidders must provide approved samples of LV7 components: 16 listed items; ensure compatibility with Army LV7 platform and include OEM verification documentation prior to bid opening.
Yes; past performance in defence sector for 2023-24 and 2024-25 is required; bidders should demonstrate delivery reliability, quality compliance, and timely servicing experience for LV7 compatible parts.
The purchaser may increase or decrease by up to 25% of the bid quantity at contracted rates; the variation is permitted during contract execution and requires adherence to original pricing.