Bid Publish Date
26-Sep-2026, 10:54 am
Bid End Date
17-Oct-2026, 11:00 am
Value
₹94,60,469
Location
Progress
The project is issued by the Bokaro Steel Plant under the Steel Authority of India Limited for the off-loading of construction and installation of 15 Jal Minar drinking water supply systems. Scope includes bore drilling, solar panels, and a SPV submersible DC water motor pump, executed as an item-rate contract under the Site Specific Wildlife and Biodiversity Conservation Plan in West Singhbhum, Jharkhand (831013). Estimated value is ₹9,460,469.17. Work requires pre-ground surveys, alignment with Annexure-VII Bill of Quantities, and coordination with multiple agencies per CPWD specifications. A unique wildlife-biodiversity context differentiates this procurement, demanding precise survey and installation within environmental safeguards. The tender emphasizes compliance with project-specific drawings and meticulous project execution timelines, leveraging solar-powered water supply to serve local needs. The opportunity targets suppliers capable of integrated field survey, bore planning, and turnkey Jal Minar installation under a single contract.
Quantity: 15 Jal Minar drinking water supply systems
Scope: Bore drilling, water supply through Jal Minar, SPV solar panels, DC motor pump
Standards: CPWD Specification; Annexure-VII BoQ
Environment: Site Specific Wildlife and Biodiversity Conservation Plan compliance
Delivery basis: Item-rate contract with coordination across agencies
SOW executed per CPWD and Annexure-VII BoQ
Site-specific wildlife/biodiversity safeguards with pre-ground survey
Turnkey responsibility including coordination with other agencies
Item-rate contract terms aligned with CPWD guidelines; payment milestones to be defined in the agreement based on BoQ progress
Delivery and completion timelines to be finalized per Annexure-VII drawings; coordination with multiple agencies required
Penalties to be as per CPWD standard L.D. provisions and project-specific environmental safeguards
Experience in complian t installation of solar-powered water supply systems
Proven ability to conduct ground surveys and bore drilling for water projects
Demonstrated capability to work under wildlife and biodiversity conservation plans
Quantity
1
Similar Category
Water Drilling Service
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
No
MII Compliance
Yes
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Experience Required
7 Year (s)
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Custom Bid for Services - Off-loading job of construction of 15 fifteen nos of drinking water supply system Jal Minar with boring and solar panels under Site Specific Wildlife and Biodiversity Conservation Plan of amalgamated KIOM MIOM JGOM CMLO
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
West Singhbhum
Delivery Pincodes
833223
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Karna Bahadur Thapa | 833223,Meghahatuburu Iron Ore Mines, JGOM, CMLO | West Singhbhum | Jharkhand | 833223 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar water-supply and solar projects
Financial statements or turnover proof
EMD/Security deposit (if applicable per tender terms)
Technical bid documents demonstrating CPWD-compliance experience
OEM authorizations or standard component certifications for solar equipment
Project completion certificates for bore/drilling and solar installations
Key insights about JHARKHAND tender market
Bidders should submit GST, PAN, experience certificates, financials, and EMD (if applicable) along with technical bids demonstrating CPWD-compliant solar water system installation experience. Provide OEM authorizations for solar equipment and pre-ground survey methodology aligned with Site Specific Wildlife and Biodiversity Conservation Plan.
Required documents include GST certificate, PAN card, experience certificates for bore/drilling and solar installations, financial statements, EMD/security deposit, technical compliance certificates, and OEM authorizations for solar panels and SPV equipment, plus CPWD-compliant drawings and Annexure-VII BoQ references.
Projects must adhere to CPWD specifications with reference to Annexure-VII BoQ; site implementation also requires compliance with the Site Specific Wildlife and Biodiversity Conservation Plan, ensuring environmental safeguards during drilling and installation.
Delivery timelines are defined per Annexure-VII BoQ and CPWD guidelines; the contractor must coordinate with multiple agencies to complete installation within project drawings and environmental safeguards, with milestones outlined in the contractual agreement.
Eligibility includes proven experience in solar-powered water supply projects, ability to conduct modern pre-ground surveys, CPWD-compliant execution capability, and financial stability evidenced by turnover and related certifications; compliance with wildlife-biodiversity conservation requirements is mandatory.
Provide CPWD-compliant project experience, BoQ-aligned quotations, drawings referencing Annexure-VII, OEM solar equipment certifications, and prior installations demonstrating successful integration of SPV panels with DC motor pumps in water-supply projects.
Key components include bore drilling for water supply, Jal Minar installation, Solar PV panels, SPV submersible DC motor pump, associated pumps, and complete panel set, all integrated per Annexure-VII BoQ and CPWD standards.