Progress
Product categories: ironpipe, pillarpipe, sheet, angles, screws, paint
BOQ items: 7 total items (specific quantities not provided in data)
Estimated value: Not disclosed; EMD amount: Not disclosed
Delivery: governed by original and extended delivery periods; minimum 30 days extension
Standards: Not specified in available data; ATC document to define compliance
Warranty/AMC: Not specified in available data; refer ATC for terms
Key Term 1: Quantity may be increased up to 25% during contract at contracted rates
Key Term 2: Delivery period extends from last date of original order; minimum 30 days
Key Term 3: ATC document governs bid-specific conditions and submission requirements
Details not disclosed in available data; payment terms to be as per ATC and purchaser's standard conditions.
Delivery period to commence from last date of original delivery order; extended delivery time computed as (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days.
Not specified in provided tender data; refer to ATC for LD clauses and performance penalties.
Eligibility criteria aligned with ATC terms and Indian Army procurement requirements
Capability to supply ironpipes, pillarpipes, sheets, angles, screws, paints, and provide labour charges
Compliance with standard corporate documentation (GST, PAN, financials) and bid-specific ATC submissions
Quantity
125
Category
Ironpipe
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
10 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Ironpipe , Pillarpipe , Sheet , Angles , Screw , Paint , Labourcharges
Pre-Bid Date
07-10-2026 13:00:00
Pre-Bid Venue
HQ 38 Inf Bde
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Ambala
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Ambala | Ambala | - | - | 30 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Ironpipe
Iron Pipe 2.5 inch
Pillarpipe
Pillar Pipe 3 inch (Iron)
Sheet
Powder Coated Sheet
Angles
Angles 2.5 inch
Screw
Screw and Bolt
Paint
Paint
Labourcharges
Labour Charges
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Ironpipe | Iron Pipe 2.5 inch | 30 | nos | aag26@38infbde | 30 | |
| 2 | Pillarpipe | Pillar Pipe 3 inch (Iron) | 10 | nos | aag26@38infbde | 30 | |
| 3 | Sheet | Powder Coated Sheet | 40 | nos | aag26@38infbde | 30 | |
| 4 | Angles | Angles 2.5 inch | 25 | nos | aag26@38infbde | 30 | |
| 5 | Screw | Screw and Bolt | 2 | box | aag26@38infbde | 30 | |
| 6 | Paint | Paint | 16 | ltr | aag26@38infbde | 30 | |
| 7 | Labourcharges | Labour Charges | 2 | worker | aag26@38infbde | 30 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply of metal/industrial materials and labour
Financial statements (latest annual report or equivalent)
EMD/Security deposit payment proof (as per ATC guidance)
Technical bid documents conforming to ATC requirements
OEM authorizations or supplier declarations (if applicable)
Key insights about HARYANA tender market
Bidders must review the uploaded ATC document, submit GST, PAN, and experience certificates, and ensure compliance with the option clause allowing up to 25% quantity variation. Prepare technical bid with labour charges and confirm delivery timing per original and extended periods. The exact EMD and value details will be per ATC.
Required documents include GST registration, PAN, financial statements, experience certificates for similar supply, EMD proof, technical compliance certificates, and OEM authorizations if applicable. ATC may add specific forms; bidders must follow those exact submission formats to participate.
Delivery starts from the last date of the original delivery order. If quantities increase, the extension is calculated as (Increased quantity/Original quantity) × Original delivery period, with a minimum extension of 30 days, and may extend up to the original delivery period as per option clause.
The option clause permits a 25% increase in contracted quantity at the same contracted rates during the currency of the contract. Bidders should plan capacity and logistics to accommodate possible volume changes without price adjustments.
ATC defines bid-specific terms, submission formats, and any exemptions or special clauses. Bidders must view and comply with all provisions in the ATC uploaded by the buyer to avoid disqualification.
Categories include ironpipe, pillarpipe, sheet, angles, screws, paint, and Labourcharges. The BOQ lists 7 items, but itemwise quantities are not disclosed publicly; bidders should rely on ATC for exact specifications.
Delivery timing references the original delivery order date; extended timelines are computed as per the option clause formula with a 30-day minimum, ensuring continuity of supply even with quantity fluctuations.
The tender data does not specify standards; bidders must consult the ATC document for any required certifications or quality standards and ensure compliance for bid submission.