TenderDekho Logo
GEM

Indian Army Air Filter Element and Automotive Spare Parts Tender Pithoragarh Uttarakhand 2025 with 25% Quantity Option

Bid Publish Date

29-Nov-2025, 11:05 am

Bid End Date

12-Dec-2025, 12:00 pm

Generate Docs

Progress

Issue29-Nov-2025, 11:05 am
Technical12-Nov-2025, 4:00 pm
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

81

Category

AIR FILTER ELEMENT

Bid Type

Two Packet Bid

Categories 26

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids from suppliers for a broad range of automotive spare parts and air/fuel/filters, including items such as AIR FILTER ELEMENT, ASSY FUEL FILTER, CARTRIDGE FUEL FILTER, CLUTCH components, BELT, DISC PAD, and UNIVERSAL JOINT assemblies, to be supplied in PITHORAGARH, Uttarakhand. The BOQ lists 19 items across multiple categories, with no start/end dates and no specified estimated value or EMD in the provided data. A key differentiator is the Buyer’s option clause permitting up to a 25% quantity increase at contracted rates during the contract period. The clause also governs delivery timelines based on the last delivery order date, with a minimum 30-day extension rule. This tender requires careful interpretation of the option clause for scope expansion and delivery scheduling. The absence of explicit item specifications signals the need for bidders to seek clarifications on exact part numbers and compatibility.

Technical Specifications & Requirements

  • No item-level technical specifications are publicly provided in the data. The procurement category spans multiple automotive and air/engine components (e.g., AIR FILTER ELEMENT, FUEL FILTER, BRAKE SHOE ASSY, TIMING BELT, MOUNTING ENGINE FRONT, FIELD COIL ASSY, BRUSH CARRIER ASSY, REPAIR KIT PISTON ASSY AIR COMPRESSOR, PLATE CLUTCH DISC CLUTCH, CARTRIDGE FUEL FILTER).
  • The BOQ contains 19 items, but item quantities and unit measures are not disclosed. Bidders should anticipate generic military-grade components and verify compatibility with standard equipment used by the Indian Army. Given the lack of explicit standards, bidders should prepare technical dossiers showing OEM compatibility and field-proven performance.
  • The tender implies a broad supply scope, potentially requiring multiple OEM authorizations and a robust supply chain for timely delivery to Pithoragarh. Clarifications on delivery timelines, packaging, and warranty would be prudent to obtain prior to bid submission.

Terms, Conditions & Eligibility

  • A mandatory 25% quantity option may be exercised during contract execution, with extended delivery periods calculated as (Increased quantity ÷ Original quantity) × Original delivery period, subject to a minimum of 30 days.
  • The tender data does not disclose the EMD amount or the estimated contract value; bidders must confirm these figures during clarification.
  • Delivery terms reference last delivery order dates; bidders should align production and logistics to accommodate potential fluctuations in order size and delivery windows.

Key Specifications

  • Product categories: AIR FILTER ELEMENT, ASSY FUEL FILTER, FUEL FILTER, OIL FILTER, TIMING BELT, BELT, BRAKE SHOE ASSY, DISC PAD, CARTRIDGE FUEL FILTER, JOINT ASSY UNIVERSAL, MOUNTING ENGINE FRONT, FIELD COIL ASSY, BRUSH CARRIER ASSY, REPAIR KIT PISTON ASSY AIR COMPRESSOR, PLATE CLUTCH DISC CLUTCH, FUEL LIFT PUMP MICO, ASSY UNIVERSAL JOINT

  • Quantities: Not disclosed in BOQ

  • Estimated value: Not disclosed

  • EMD amount: Not disclosed

  • Delivery location: PITHORAGARH, Uttarakhand

Terms & Conditions

  • Option to increase order quantity up to 25% at contracted rates

  • Delivery period computed from last delivery order date with minimum 30 days

  • Delivery/extensions permissible within contracted terms during option exercise

Important Clauses

Payment Terms

No explicit payment terms disclosed; bidders should seek clarification on advance, milestone, and final payment flow during bid inquiry.

Delivery Schedule

Delivery period starts from last date of original delivery order; extension rules apply with minimum 30 days if quantity increases.

Penalties/Liquidated Damages

Not specified in data; bidders should verify LD/penalty provisions during clarification.

Bidder Eligibility

  • Experience in supplying automotive spare parts and filters to government or defense entities

  • Valid GST and GSTIN compliance

  • Demonstrated financial stability and ability to manage multi-item procurement

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

AIR FILTER ELEMENT , ASSY FUEL FILTER , KIT PAD ASSY , BRAKE SHOE ASSY , DISC PAD , BELT , AIR FILTER , FUEL FILTER , OIL FILTER , TIMING BELT , CARTRIDGE FUEL FILTER , JOINT ASSY UNIVERSAL , MOUNTING ENGINE FRONT , FIELD COIL ASSY , BRUSH CARRIER ASSY , REPAIR KIT PISTON ASSY AIR COMPRESSOR , PLATE CLUTCH DISC CLUTCH , FUEL LIFT PUMP MICO , ASSY UNIVERSAL JOINT

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8651572.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 19 Items Sign in for GEM prices

#1

AIR FILTER ELEMENT

AIR FILTER ELEMENT

2 nos Delivery: 15 days
#2

ASSY FUEL FILTER

ASSY FUEL FILTER

2 nos Delivery: 15 days
#3

KIT PAD ASSY

KIT PAD ASSY

1 nos Delivery: 15 days
#4

BRAKE SHOE ASSY

BRAKE SHOE ASSY

2 nos Delivery: 15 days
#5

DISC PAD

DISC PAD

4 nos Delivery: 15 days
#6

BELT

BELT

3 nos Delivery: 15 days
#7

AIR FILTER

AIR FILTER

2 nos Delivery: 15 days
#8

FUEL FILTER

FUEL FILTER

2 nos Delivery: 15 days
#9

OIL FILTER

OIL FILTER

1 nos Delivery: 15 days
#10

TIMING BELT

TIMING BELT

1 nos Delivery: 15 days
#11

CARTRIDGE FUEL FILTER

CARTRIDGE FUEL FILTER

1 nos Delivery: 15 days
#12

JOINT ASSY UNIVERSAL

JOINT ASSY UNIVERSAL

30 nos Delivery: 15 days
#13

MOUNTING ENGINE FRONT

MOUNTING ENGINE FRONT

4 nos Delivery: 15 days
#14

FIELD COIL ASSY

FIELD COIL ASSY

8 nos Delivery: 15 days
#15

BRUSH CARRIER ASSY

BRUSH CARRIER ASSY

8 nos Delivery: 15 days
#16

REPAIR KIT PISTON ASSY AIR COMPRESSOR

REPAIR KIT PISTON ASSY AIR COMPRESSOR

5 set Delivery: 15 days
#17

PLATE CLUTCH DISC CLUTCH

PLATE CLUTCH DISC CLUTCH

1 nos Delivery: 15 days
#18

FUEL LIFT PUMP MICO

FUEL LIFT PUMP MICO

1 nos Delivery: 15 days
#19

ASSY UNIVERSAL JOINT

ASSY UNIVERSAL JOINT

3 nos Delivery: 15 days

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar automotive spare parts supply

4

Financial statements demonstrating solvency

5

EMD/Security deposit documents (as applicable)

6

Technical bid documents detailing OEM authorizations

7

Authorized dealership/distributor certificates (if applicable)

Corrigendum Updates

1 Update
#1

Update

09-Dec-2025

Extended Deadline

12-Dec-2025, 12:00 pm

Opening Date

12-Dec-2025, 12:30 pm

Technical Results

S.No Seller Item Date Status
1
JINDAL INDUSTRIAL CORPORATION   Under PMA
-11-12-2025 16:00:43
2
KAVISH ENTERPRISES   Under PMA
-11-12-2025 14:58:17
3
NEHA SALES CORP   Under PMA
-11-12-2025 14:28:24

Financial Results

Rank Seller Price Item
L1
KAVISH ENTERPRISES(MSE)( MSE Social Category:General )    Under PMA
Item Categories : AIR FILTER ELEMENT,ASSY FUEL FILTER,KIT PAD ASSY,BRAKE SHOE ASSY,DISC PAD,BELT,AIR FILTER,FUEL FILT
L2
JINDAL INDUSTRIAL CORPORATION (MSE)( MSE Social Category:General )    Under PMA
Item Categories : AIR FILTER ELEMENT,ASSY FUEL FILTER,KIT PAD ASSY,BRAKE SHOE ASSY,DISC PAD,BELT,AIR FILTER,FUEL FILT
L3
NEHA SALES CORP (MSE)( MSE Social Category:General )    Under PMA
Item Categories : AIR FILTER ELEMENT,ASSY FUEL FILTER,KIT PAD ASSY,BRAKE SHOE ASSY,DISC PAD,BELT,AIR FILTER,FUEL FILT

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for the Indian Army air filter tender in Pithoragarh?

Bidders should first verify eligibility for automotive spares supply, ensure GST compliance, and prepare OEM authorizations. The tender allows up to 25% quantity increase at contracted rates; clarify EMD amount and delivery timelines during pre-bid queries. Submit technical evidence of compatibility for AIR FILTER ELEMENT and related items, plus financial statements and experience certificates.

What documents are required to participate in the Pithoragarh tender?

Required documents include GST registration, PAN, experience certificates for similar parts supply, financial statements, EMD/Security deposit proofs, and OEM authorizations. Also include technical bid documents showing product compatibility across air/fuel/filters and mounting components for army equipment.

What are the key delivery terms for this army procurement in Uttarakhand?

Delivery timelines start after the last delivery order date; if quantity increases, the extended period is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a mandatory minimum of 30 days. Ensure logistics support to Pithoragarh and readiness for potential batch deliveries.

Are there any standards or certifications specified for the parts?

No explicit standards are listed in the available data. Bidders should confirm if items require military-grade specifications, OEM certifications, or IS/ISI-type conformity during clarification. Include evidence of compatibility with army equipment and any third-party quality assurances in the technical bid.

What is the EMD amount for the army spare parts tender in Uttarakhand?

EMD amount is not disclosed in the provided tender data. Prospective bidders must request the EMD figure during pre-bid clarifications and prepare payment via online means or bank guarantee as per the issuing authority’s instruction.