TenderDekho Logo
Closed GEM

Block Development Office Baramulla IS 8448 Automatic Line Voltage Correctors Tender 2025

Bid Publish Date

22-Nov-2025, 5:59 pm

Bid End Date

12-Dec-2025, 6:00 pm

Generate Docs

Progress

Issue22-Nov-2025, 5:59 pm
Corrigendum27-Nov-2025
AwardPending

Key Highlights

  • Copper-wired stabilizer required for domestic use
  • IS 8448 standard compliance mandatory
  • Automatic operation with 1.5 ton AC suitability
  • Option clause to increase quantity up to 25% during contract

Tender Overview

The procurement is issued by the Block Development Office in Baramulla, Jammu & Kashmir for Automatic Line Voltage Correctors (Step Type) for Domestic Use under the IS 8448 standard in 2025. The tender references a flexible quantity clause up to 25% variation and a multi-period delivery framework aligned with original and extended delivery calendars. The ATC requires a copper-wired stabilizer suitable for a 1.5 ton AC. No BOQ items are listed, signaling a focused, single-product specification with scalable order potential. The key differentiator is the explicit option clause linked to contract quantity adjustments during execution.

Technical Specifications & Requirements

  • Product/category: Automatic Line Voltage Corrector (Step Type) for domestic use, IS 8448 compliant
  • Copper winding requirement: Stabilizer must use copper wire and be automatic
  • Capacity suitability: Compatible with 1.5 ton AC systems
  • Standard reference: IS 8448 compliant stabilizers
  • Delivery flexibility: Option to increase quantity up to 25% of bid/contract quantity; delivery period adjustments follow the option clause
  • No BOQ items listed; focus is on a compliant, copper-wound stabilizer meeting IS 8448 criteria

Terms, Conditions & Eligibility

  • Quantity variation: Purchaser may increase/decrease up to 25% during contract; extended delivery period calculated as (Additional quantity ÷ Original quantity) × Original delivery period, min 30 days
  • ATC clause: Stabilizer must be copper wire, automatic, suitable for 1.5 ton AC
  • Delivery start: Commences from the last date of original delivery order; extended period method as specified
  • Compliance: Bidders must comply with option clause and delivery timing terms
  • Documentation: Submit standard bid documents including GST, PAN, and any required OEM authorizations and technical compliance evidence

Key Specifications

  • Product: Automatic Line Voltage Corrector (Step Type) for domestic use

  • Standard: IS 8448 compliant stabilizer

  • Winding: Copper wire required

  • Capacity compatibility: Suitable for 1.5 ton AC

  • Control: Fully automatic operation

Terms & Conditions

  • Quantity variation: ±25% allowed at contract placement and during currency

  • Delivery period: Calculated based on original and extended delivery periods with minimum 30 days

  • Warranty/AMCs: Not specified in available data; bidders to verify

  • Payment terms: Not defined in provided terms; refer to standard government procurement terms

  • Penalties: Liquidated damages not specified in data; confirm in final tender documentation

Important Clauses

Delivery & Quantity Variation

20–25% adjustment window for order quantity; delivery schedule adjusts with extended period calculations

Copper Windings Requirement

Stabilizer must use copper windings; auto operation is mandatory

IS 8448 Compliance

Product must conform to IS 8448 domestic stabilizers standard

Bidder Eligibility

  • Experience in supplying IS 8448 compliant stabilizers or similar voltage stabilizers

  • GST registration and PAN validated for government bidding

  • Demonstrated financial capacity to support contract scaled orders

Authority & Contact

Tender Data

Bid Details

Quantity

2

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Requirements

OEM Avg. Turnover

1

Past Performance

10 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Automatic Line Voltage Correctors (Step Type) for Domestic Use - IS - 8448 (Q2)

Authority Records

MINISTRY OF PANCHAYATI RAJBLOCK DEVELOPMENT OFFICE

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-8623985.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Corrigendum Updates

1 Update
#1

Update

27-Nov-2025

Extended Deadline

12-Dec-2025, 12:30 pm

Opening Date

12-Dec-2025, 1:00 pm

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar stabilizer supply

4

Financial statements (last 2–3 years)

5

EMD/Security deposit submission proof

6

Technical bid documents demonstrating IS 8448 compliance

7

OEM authorization or dealership certificate (if applicable)

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for IS 8448 stabilizer tender in Baramulla 2025?

Bidders must submit GST, PAN, experience certificates, financial statements, and EM D documentation along with a technical bid demonstrating IS 8448 compliance and copper winding usage. Ensure OEM authorization if required, and confirm the 25% quantity variation and delivery terms before submission.

What documents are required for Baramulla stabilizer procurement bid 2025?

Required documents include GST certificate, PAN card, recent experience certificates for stabilizers, last 2–3 years’ financial statements, EMD proof, technical compliance for IS 8448, and OEM authorization or dealership certificate if applicable.

What standards must the stabilizer meet for this tender in Jammu & Kashmir?

Stabilizers must be IS 8448 compliant for domestic use, with copper winding and automatic operation, specifically suitable for 1.5 ton air conditioners in Baramulla bids.

When is quantity variation allowed in this Baramulla tender?

The purchaser reserves the right to increase or decrease the quantity by up to 25% at contract placement and during the currency of the contract, with delivery period adjustments as described in the option clause.

What are the delivery terms for the Baramulla voltage stabilizer tender 2025?

Delivery starts from the last date of the original delivery order; extended periods are calculated as (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, and may extend within contracted limits.

What evidence of technical compliance is needed for IS 8448 in this bid?

Submit technical bid documents showing IS 8448 conformity, copper-winding construction, automatic operation, and suitability for 1.5 ton AC units, along with any required OEM authorizations.

Which organization is issuing the IS 8448 stabilizer tender in 2025?

The tender is issued by the Block Development Office, Baramulla, Jammu & Kashmir, inviting suppliers to supply IS 8448 domestic stabilizers with copper windings for 1.5 ton AC units.

What is the critical requirement for copper winding in this stabilizer bid?

The stabilizer must use copper wire in its windings and be fully automatic, as stipulated by the at- specifications for IS 8448 approved domestic stabilizers.