Bid Publish Date
26-Sep-2026, 12:34 pm
Bid End Date
06-Oct-2026, 1:00 pm
Location
Progress
The procurement is issued by the Indian Army under the Department Of Military Affairs for a bundle of engine-related components located in Surendranagar, Gujarat 363001. The scope includes carburetor, bolts, piston assembly, head gasket, overhaul kit, big N bearing, and fan belt across a total of seven items. No explicit specifications or quantities are disclosed; however, a flexible option clause allows a ±25% quantity variation at contracted rates. This tender emphasises supply of multiple engine components in a single package, with delivery timelines anchored to the last delivery order date. The presence of a bulk-item list and the option clause indicates a multi-item supply contract with performance under standard military procurement terms.
Product/service names: carburetor, bolt, piston assembly, head gasket, overhaul kit, big N bearing, fan belt
Quantities: not disclosed in BOQ (7 items total)
Estimated value: not disclosed
Experience requirements: not specified in tender data
Quality/standards: not specified; no IS/ISO codes listed
Delivery/installation: delivery period linked to last DO date; minimum 30 days
Warranty/AMC: not specified
Key Term 1: Quantity variation up to 25% during contract execution
Key Term 2: Delivery period calculated from original delivery order date with a minimum 30 days
Key Term 3: EMD amount not disclosed in tender data
Not specified in tender data; bidders should await tender release for exact terms
Delivery starts from the last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
No LD details provided in current data; bidders should verify in final bid documents
Must comply with option quantity variation clause up to 25%
Should be able to supply engine spare parts (carburetor, piston, bearings, gaskets, belts) to a defense facility
Provide standard bid documentation including GST, PAN, and OEM authorizations if required
Quantity
8
Category
Carburetor
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
10 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Carburetor , Bolt , Piston Assembly , Head Gasket , Overhaul Kit , Big N Bearing , Fan Belt
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Surendra Nagar
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Surendra Nagar | Surendra Nagar | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Carburetor
Carburetor
Bolt
Bolt
Piston Assembly
Piston Assembly
Head Gasket
Head Gasket
Overhaul Kit
Overhaul Kit
Big N Bearing
Big N Bearing
Fan Belt
Fan Belt
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Carburetor | Carburetor | 1 | pieces | wkspoffr2@ | 15 | |
| 2 | Bolt | Bolt | 1 | pieces | wkspoffr2@ | 15 | |
| 3 | Piston Assembly | Piston Assembly | 1 | pieces | wkspoffr2@ | 15 | |
| 4 | Head Gasket | Head Gasket | 1 | pieces | wkspoffr2@ | 15 | |
| 5 | Overhaul Kit | Overhaul Kit | 1 | pieces | wkspoffr2@ | 15 | |
| 6 | Big N Bearing | Big N Bearing | 1 | pieces | wkspoffr2@ | 15 | |
| 7 | Fan Belt | Fan Belt | 2 | pieces | wkspoffr2@ | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar engine-spare or military-supply projects
Financial statements (audited, if available)
EMD payment receipt or declaration (as per announed method)
Technical bid documents demonstrating capability to supply engine components
OEM authorization or authorized distributor certificate (where applicable)
Key insights about GUJARAT tender market
Bidders should prepare mandatory documents: GST certificate, PAN, experience certificates for engine spares, financial statements, and OEM authorizations. The tender allows a ±25% quantity variation and delivery is calculated from the last DO date with a minimum 30 days. Ensure OEM alignment and readiness for multi-item supply.
Required documents include GST registration, PAN, company financials, experience certificates for similar supply, EMD submission, technical bid detailing capabilities, and OEM authorization certificates. Ensure all documents are valid and match organization requirements; verify EMD method with the procuring authority.
No explicit technical specs are provided in the data. Bidders should rely on the BOQ items: carburetor, bolt, piston assembly, head gasket, overhaul kit, big N bearing, fan belt. Prepare to demonstrate compatibility, OEM sourcing, and quality control procedures for defense-grade components.
Delivery begins after the last delivery order date. If quantity increases or new orders are issued, the extended period is calculated by (Increased quantity ÷ Original quantity) × Original delivery period, with a mandatory minimum of 30 days to complete fulfillment.
EMD amount is not disclosed in the current tender data. Bidders should monitor the final tender document for the exact EMD amount, acceptable payment method, and submission format to avoid disqualification.
The provided tender data does not specify warranty terms or liquidated damages. Vendors should await the final tender documents for warranty duration, AMC terms, and LD penalties, and prepare to propose standard defense-grade warranty on engine components.
If OEM authorization is requested, bidders must provide certificates or authorization letters from the OEM for the carburetor, bearings, and other components. Ensure the authorizations cover defense-supply compliance and reflect current product models used by the Indian Army.