TenderDekho Logo
Active GEM

Indian Army Carburetor & Engine Spare Parts Tender Surendranagar Gujarat 2026 - ISI/AAA TRTL Related Items

Bid Publish Date

26-Sep-2026, 12:34 pm

Bid End Date

06-Oct-2026, 1:00 pm

Progress

Issue26-Sep-2026, 12:34 pm
AwardPending

Key Highlights

  • • Brand/OEM specifics: Not stated; bidders should verify OEM authorization requirements during submission
  • • Technical standards: Not specified; no IS/ISO references disclosed in data
  • • Special clauses: Quantity variation up to 25% at contract and during currency
  • • Eligibility: No explicit experience or turnover metrics provided in the tender data

Tender Overview

The procurement is issued by the Indian Army under the Department Of Military Affairs for a bundle of engine-related components located in Surendranagar, Gujarat 363001. The scope includes carburetor, bolts, piston assembly, head gasket, overhaul kit, big N bearing, and fan belt across a total of seven items. No explicit specifications or quantities are disclosed; however, a flexible option clause allows a ±25% quantity variation at contracted rates. This tender emphasises supply of multiple engine components in a single package, with delivery timelines anchored to the last delivery order date. The presence of a bulk-item list and the option clause indicates a multi-item supply contract with performance under standard military procurement terms.

Technical Specifications & Requirements

  • Organization: Indian Army (Department Of Military Affairs)
  • Location: Surendranagar, Gujarat 363001
  • Product Category: Engine-spares and overhaul components
  • Items in BOQ: 7 items including carburetor, bolt, piston assembly, head gasket, overhaul kit, big N bearing, fan belt
  • Specifications Not Provided: No technical specs or model numbers are listed in the data
  • Key Clauses: Quantity may be increased/decreased by up to 25% at contract placement and during the contract period at the same rates; delivery period linked to the last date of original DO with minimum 30 days grace
  • Implication for bidders: Prepare for multi-item sourcing with potential scope expansion and ensure capability to deliver multiple engine-spare components to a military facility

Terms, Conditions & Eligibility

  • EMD: Amount not disclosed in the tender data
  • Option Clause: Up to 25% quantity variation at contract award and during currency
  • Delivery: Commencement based on last delivery order date; extended period calculated using (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days
  • Delivery Extension: Purchaser may extend delivery duration within the original period if option is exercised
  • Submission Notes: Bidders must comply with the option clause and provide required bid documentation per terms
  • Documents to Prepare: GST certificate, PAN, experience certificates, financial statements, EMD documents, technical bid, OEM authorizations where applicable

Key Specifications

  • Product/service names: carburetor, bolt, piston assembly, head gasket, overhaul kit, big N bearing, fan belt

  • Quantities: not disclosed in BOQ (7 items total)

  • Estimated value: not disclosed

  • Experience requirements: not specified in tender data

  • Quality/standards: not specified; no IS/ISO codes listed

  • Delivery/installation: delivery period linked to last DO date; minimum 30 days

  • Warranty/AMC: not specified

Terms & Conditions

  • Key Term 1: Quantity variation up to 25% during contract execution

  • Key Term 2: Delivery period calculated from original delivery order date with a minimum 30 days

  • Key Term 3: EMD amount not disclosed in tender data

Important Clauses

Payment Terms

Not specified in tender data; bidders should await tender release for exact terms

Delivery Schedule

Delivery starts from the last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

No LD details provided in current data; bidders should verify in final bid documents

Bidder Eligibility

  • Must comply with option quantity variation clause up to 25%

  • Should be able to supply engine spare parts (carburetor, piston, bearings, gaskets, belts) to a defense facility

  • Provide standard bid documentation including GST, PAN, and OEM authorizations if required

Advertisement

Tender Data

Bid Details

Quantity

8

Category

Carburetor

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

10 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Carburetor , Bolt , Piston Assembly , Head Gasket , Overhaul Kit , Big N Bearing , Fan Belt

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Surendra Nagar

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-Surendra NagarSurendra Nagar--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9950638.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

Carburetor

Carburetor

1 pieces Delivery: 15 days
#2

Bolt

Bolt

1 pieces Delivery: 15 days
#3

Piston Assembly

Piston Assembly

1 pieces Delivery: 15 days
#4

Head Gasket

Head Gasket

1 pieces Delivery: 15 days
#5

Overhaul Kit

Overhaul Kit

1 pieces Delivery: 15 days
#6

Big N Bearing

Big N Bearing

1 pieces Delivery: 15 days
#7

Fan Belt

Fan Belt

2 pieces Delivery: 15 days

Categories 12

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar engine-spare or military-supply projects

4

Financial statements (audited, if available)

5

EMD payment receipt or declaration (as per announed method)

6

Technical bid documents demonstrating capability to supply engine components

7

OEM authorization or authorized distributor certificate (where applicable)

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid on the Indian Army carburetor & engine parts tender in Surendranagar Gujarat

Bidders should prepare mandatory documents: GST certificate, PAN, experience certificates for engine spares, financial statements, and OEM authorizations. The tender allows a ±25% quantity variation and delivery is calculated from the last DO date with a minimum 30 days. Ensure OEM alignment and readiness for multi-item supply.

What documents are required for the Indian Army engine parts tender in Gujarat

Required documents include GST registration, PAN, company financials, experience certificates for similar supply, EMD submission, technical bid detailing capabilities, and OEM authorization certificates. Ensure all documents are valid and match organization requirements; verify EMD method with the procuring authority.

What are the technical specifications for engine spare parts in this tender

No explicit technical specs are provided in the data. Bidders should rely on the BOQ items: carburetor, bolt, piston assembly, head gasket, overhaul kit, big N bearing, fan belt. Prepare to demonstrate compatibility, OEM sourcing, and quality control procedures for defense-grade components.

What is the delivery timeline for the Surendranagar engine parts procurement

Delivery begins after the last delivery order date. If quantity increases or new orders are issued, the extended period is calculated by (Increased quantity ÷ Original quantity) × Original delivery period, with a mandatory minimum of 30 days to complete fulfillment.

What are the EMD requirements for this Indian Army tender in Gujarat

EMD amount is not disclosed in the current tender data. Bidders should monitor the final tender document for the exact EMD amount, acceptable payment method, and submission format to avoid disqualification.

Are there any warranty or penalty provisions for the engine parts supply

The provided tender data does not specify warranty terms or liquidated damages. Vendors should await the final tender documents for warranty duration, AMC terms, and LD penalties, and prepare to propose standard defense-grade warranty on engine components.

Which OEM authorizations are required for the Surendranagar engine parts tender

If OEM authorization is requested, bidders must provide certificates or authorization letters from the OEM for the carburetor, bearings, and other components. Ensure the authorizations cover defense-supply compliance and reflect current product models used by the Indian Army.