Tender Overview
The Indian Air Force, Gorakhpur, Uttar Pradesh, is soliciting a supply-only tender for a broad range of aircraft support components including CARBON BRUSH, SOLENOID SWITCH, PNEUMATIC CYLINDER, RADIATOR HOSE TOP, FUEL TANK UNIT, and related items. Estimated value is โน52,226.50, with a total of 18 items referenced in the BOQ. The contract emphasizes a 1-year warranty from final acceptance or post-installation, with OEM warranty documentation required at delivery. The option clause permits up to a 50% quantity increase/decrease at contracted rates, with delivery time adjustments calculated as (additional quantity/original quantity) ร original delivery period, minimum 30 days. The scope is strictly the supply of goods; installation/commissioning, if included, is part of the scope and must be documented. Unique differentiators include mandatory post-sale service capability across India and a mechanism to upload service-center details.
Technical Specifications & Requirements
No formal technical specs are published in the tender data. The available information names the following product categories: CARBON BRUSH, VALVE, FOAM TANK DRAIN SS 25MM, PNEUMATIC CYLINDER, PIANO KEY SWITCH, FLY WHEEL, BEARING, AIR TANK DRAIN PLUG, BRAKE PIPE LINE, and others. Key implicit requirements include a 1-year warranty, OEM warranty certificates at delivery, and a well-established Indian after-sales service network. The ATC/ATC-corrigendum confirms that certificates uploaded with the bid are mandatory. Service-centre location details should be provided with the bid. Delivery parameters rely on the option clause and minimum 30-day periods.
Terms & Eligibility
Bidders must submit a supply-only bid with 1-year warranty coverage from acceptance or post-installation. Mandatory documents include OEM warranties, installation/commissioning capability if applicable, and service-center details within India. The option clause allows ยฑ50% quantity adjustments at contracted rates; delivery time scales with the extended period minimum of 30 days. The bidder must comply with the ATC; non-submission of required certificates risks rejection. The bid requires readiness to support after-sales service and part availability across designated consignee locations.
