The Centre for Development of Advanced Computing (CDAC), under the Department of Electronics and Information Technology, seeks an Online UPS 10 KVA with battery conforming to IS 16242 (Part 1). Estimated value around ₹9,73,500 with scope including Supply, Installation, Testing and Commissioning across all 33 districts of Chhattisgarh. The bid requires OEM/MANUFACTURER authority, an OEM MAF, and an UPS battery compliance list. A data sheet must accompany the bid for technical verification. The contract allows quantity variation up to 25%, and delivery timelines extendable accordingly. Unique installation locations and on-site OEM support for 3 years are mandated, with service center presence required in the state. A dedicated battery stand is also part of the scope. CDAC emphasizes strict data-sheet alignment with offered product specs to avoid rejection.
Technical Specifications & Requirements
- Product category: Online UPS with battery, 10 KVA rating, IS 16242 (Part 1) compliant
- Inbuilt isolation transformer: Availability required
- Battery: Type to be specified by bidder per data sheet; compatibility with 10 KVA UPS
- Backup time: Defined in data sheet and aligned with load profile; testers to verify under service conditions
- Quality/Certifications: IS 16242 alignment, OEM MAF, UPS compliance list, and data sheet cross-check
- Delivery/Installation: Supply, installation, testing, commissioning across 33 districts in Chhattisgarh; post-delivery support and site readiness verification
- Service: OEM onsite support for 3 years; dedicated service centers in the state; battery stand provision
Terms, Conditions & Eligibility
- Option clause: Quantity may increase/decrease by up to 25% at contract placement and during currency at contracted rates
- Data sheet: Must be uploaded; technical parameters must match offered product
- OEM authorization: Required with detailed OEM/Original Service Provider contact information
- Scope of supply: Includes supply, installation, testing, and commissioning
- Service centers: Functional in the state; establishment within 30 days of award if not present
- Documentation: OEM MAF, UPS compliance list, installation across 33 districts, 3-year onsite support, battery stand provision