Aravali Power Company Private Limited valve procurement GeM 2025 - M5123026349/6347/NDL VALVE NP25
Aravali Power Company Private Limited
JHAJJAR, HARYANA
Bid Publish Date
01-Jan-2026, 12:55 pm
Bid End Date
12-Jan-2026, 9:00 am
Location
Progress
Quantity
2
Category
Indicator Unit Port(P/N-J3030-00-04)
Bid Type
Single Packet Bid
The opportunity is published by the Indian Coast Guard (Department of Defence) for procurement related to Indicator Unit Port (P/N-J3030-00-04) and Indicator Unit Stbs (P/N-J3130-00-04). Although the BOQ shows 0 items and no explicit quantities, the award will hinge on OEM/OEM Authorized/PAC certification, and the successful bidder must provide a 1-year warranty from final acceptance or after installation/completion testing. The buyer reserves a 25% quantity variation both at contract award and during the currency of the contract, with delivery extensions computed as ((additional quantity ÷ original quantity) × original delivery period) and a minimum of 30 days. This tender emphasizes compliance with OEM support and post-sale service coverage across India.
Indicator Unit Port (P/N-J3030-00-04) and Indicator Unit Stbs (P/N-J3130-00-04)
OEM/OEM Authorized/PAC certificate required
1-year warranty from final acceptance or post-installation testing
No BOQ items specified (0 items in BOQ)
No transport charges for spares
Installation, Commissioning, Training, Troubleshooting and Maintenance service capability in INDIA
Service centers near consignee destinations to be uploaded with bid
Option Clause: ±25% quantity variation; delivery during extended period governed by formula
OEM authorization and PAC certificate mandatory for bid validity
1-year warranty with OEM certificates due at delivery; after-sales coverage across India
Not specified in data; ensure compliance with standard government terms and OEM warranty support
Delivery timeline tied to original delivery period; extensions apply with minimum 30 days; quantity changes up to 25%
Not detailed in provided data; bidder should anticipate standard LDs for delays as per contract terms
Must possess OEM authorization or OEM-PAC certificate for indicated units
Demonstrate established after-sales network within INDIA
Submit service centre details near consignee locations and installation plan
Aravali Power Company Private Limited
JHAJJAR, HARYANA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
OEM authorization / PAC certificate
Experience certificates (similar procurements, if applicable)
Financial statements (as requested by terms, if any)
Warranty certificates from OEM (1-year coverage)
Service centre list with locations and contact details
Technical compliance documents related to the indicator units
Bid security or EMD documentation (if mandated by terms)
Key insights about ANDAMAN & NICOBAR tender market
Bidders must submit OEM authorization or PAC certificate, provide 1-year warranty documentation, and demonstrate India-wide service capabilities. Include service centre details, installation/commissioning plan, and ensure no spare transport charges. Comply with the 25% option clause and provide required bid security if applicable.
Required documents include GST, PAN, OEM authorization/PAC certificate, warranty certificates, service centre list, after-sales plan, installation/commissioning details, and any experience certificates for similar procurements. Ensure service coverage across India and BOM conformity where applicable.
No fixed BOQ items are listed; the tender requires OEM authorization and 1-year warranty. The emphasis is on product provenance, post-sale support capability in India, and installation/commissioning readiness rather than fixed performance numbers in the provided data.
The option clause permits a ±25% quantity change at award and during contract currency. Delivery extensions follow a formula based on additional versus original quantity with a minimum 30-day extension; exact dates depend on contract award timing.
Warranty is 1 year from final acceptance or after completion of installation/testing. OEM warranty certificates must accompany delivery, and the seller must guarantee rectification during the warranty period with India-based service capability.
Bid must prove a well-established Installation, Commissioning, Training, Troubleshooting and Maintenance service group in INDIA, with service centers near consignee destinations uploaded with the bid.
The terms specify no additional charges for transportation of spares. Bidders should include spare parts logistics within the offered price and confirm availability across India through their service network.
The purchaser may increase or decrease quantity by up to 25% at the time of placement and during currency at contracted rates; delivery timing adjusts per the defined formula, with a minimum extension of 30 days.
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS