Bid Publish Date
04-Nov-2025, 3:40 pm
Bid End Date
25-Nov-2025, 1:00 pm
Value
₹2,50,000
Location
Progress
Kerala State Electricity Board (KSEB) invites bids for a Split Air Conditioner (Ceiling Mount Type) conforming to IS: 1391 (Part 2), Q2. The procurement is valued at approximately ₹250,000 with delivery to Deputy Chief Engineer, System Operation Circle, KSEBL, 10th Floor Vyidhuthi Bhavanam, Pattom, Thiruvananthapuram 695004. Bidders should anticipate a quantity flex to ±25% and must adhere to the option clause timing. A critical differentiator is the need to obtain Detailed Design Drawings approval within 7 days of award, with modifications issued within 7 days if required. The data sheet must accompany the bid for verification against the offered product. This tender targets suppliers of modern ceiling-mount split AC units meeting stipulated standards, with GST alignment and timely installation constraints.
Product: Split Air Conditioner, Ceiling Mount Type
Standard: IS 1391 (Part 2) Q2
Estimated value: ₹250,000
Delivery location: Deputy Chief Engineer, System Operation Circle, KSEBL, Thiruvananthapuram
Data Sheet: Required upload for verification
Design drawings: Submit within 7 days of award; approval or modification list within 7 days
Obsolescence: Minimum 5 years residual market life; not end-of-life by OEM
GST: Bidder to apply GST; reimbursement as actuals or applicable rate (whichever lower)
Quantity may increase/decrease by up to 25% at contract placement and during currency
Delivery period linked to original delivery period with extended time rules; minimum 30 days
Detailed Design Drawings must be approved within 7 days of award; lack of approval may shift delivery timeline
GST handling as actuals or applicable lower rate; payment as per standard state norms; verify in bid
Delivery period tied to original delivery; option quantity adjustments; extended time calculation with minimum 30 days
LD provisions to be clarified in bid; reference to delivery delay implications due to drawing approvals
Not under liquidation or bankruptcy; provide undertaking
Offer not obsolete in market with at least 5 years remaining OEM life
Must meet IS 1391 (Part 2) Q2 compliance for ceiling-mount split AC units
Quantity
3
Category
Split Air Conditioner (Ceiling Mount Type), as per IS: 1391 (part 2)
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
10
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner (Ceiling Mount Type), as per IS: 1391 (part 2) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
25-Nov-2025, 7:30 am
Opening Date
25-Nov-2025, 8:00 am
GST registration certificate
PAN card
Experience certificates in similar AC procurement
Financial statements (latest financial year)
Bid security/EMD documents (as per T&Cs)
Technical bid documents
OEM authorizations or dealer/distributor certificates
Data Sheet of the offered split AC unit
Detailed Design Drawings (within 7 days of award, for approval)
Key insights about KERALA tender market
Bidders must submit GST, PAN, financials, experience certificates, and the product Data Sheet for the IS 1391 (Part 2) Q2 compliant ceiling-mount AC. Include OEM authorization, detailed design drawings within 7 days of award, and ensure 25% quantity flexibility. Compliance with GST adjustments and delivery timelines is required.
Required documents include GST registration, PAN, experience certificates in similar AC supply, financial statements, EMD documentation, technical bid and Data Sheet, OEM authorizations, and Detailed Design Drawings within 7 days of award for approval.
Units must comply with IS 1391 Part 2 Q2 requirements; ensure correct capacity, electrical ratings, refrigerant type, energy efficiency, and installation criteria. Include data sheet demonstrating conformity to the standard and OEM certification as applicable.
Delivery period starts from the original delivery order date; for increased quantity, time is (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; the buyer may extend to the original period if needed.
Bidders must apply GST as per their regime; GST reimbursement to be paid at actuals or the applicable rate, whichever is lower, within the quoted GST percentage; the bidder bears the tax obligations.
Submit Detailed Design Drawings within 7 days of award; buyer will approve or list modifications within 7 days; delivery may be delayed if approvals are not completed, with no LD for buyer delays.
Upload the official data sheet detailing model, capacity, power, EER, refrigerant, dimensions, electrical connection, warranty, and OEM certs; buyer cross-checks against offered technical parameters for completeness and compliance.