TenderDekho Logo
Closed GEM

Indian Army Department Of Military Affairs Electrical Components Tender 2026 2-POLE ISOLATOR SWITCH & ARMATURE ASSY

Bid Publish Date

09-Aug-2026, 10:46 am

Bid End Date

22-Aug-2026, 11:00 am

Value

₹52,133

Progress

Issue09-Aug-2026, 10:46 am
AwardPending

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for an electrical components procurement package covering multiple items such as 2-POLE ISOLATOR SWITCH, ARMATURE ASSY, BRAKE PAD, CONCENTRIC SLAVE CYL, MAGNET SOLENOID SWITCH, BEARING 30219A, DRUM CLUTCH SPROCKET, BRAKE SHOE, SHOCK ABSORBER, FUEL FILTER, PAD SET BRAKE DISK and CLUTCH RELEASE BEARING. The estimated contract value is ₹52,133.0, with 12 total items referenced in the BOQ though item-level quantities are not disclosed. Location is not disclosed; supplier capabilities must align with military procurement norms and bulk supply readiness. The tender emphasizes post-award advance sample approval, conformance to buyer-specified samples, and an option clause enabling quantity adjustments up to ±25% during and after contract formation. Unique emphasis on sample conformity and potential delivery-time re-baselining if approvals lag. This tender requires formal declarations on financial health, non-liquidity, and NDA compliance, alongside mandatory bid documents.

Technical Specifications & Requirements

  • No technical specifications are provided in the public data; bidders must infer scope from listed product categories and standard procurement practices for military-grade components. Items likely demand high reliability and cross-compatibility within standard electrical/mechanical assemblies. Key terms include “advance sample approval,” “bulk manufacturing after approval,” and “delivery period adjustments” per option clause. Bidder experience in supplying defense-grade hardware and standard component certifications is implied. Mandatory documentation includes PAN, GSTIN, cancelled cheque, EFT mandate, and a non-disclosure declaration.

Terms, Conditions & Eligibility

  • EMD amount not disclosed in the data.
  • Option clause permits quantity variation up to 25% at contract placement and during currency, with schedule recalibration based on the formula (extended quantity ÷ original quantity) × original delivery period, minimum 30 days.
  • Bidders must provide PAN, GSTIN,Cancelled Cheque, EFT Mandate, and NDA; financial standing proof and no liquidation/bankruptcy required.
  • Advance sample approval within 5 days of award; modifications communicated within 5 days; bulk supply must conform to approved sample; LD/termination rights if deviations persist.

Key Specifications

  • Product categories include: 2-POLE ISOLATOR SWITCH, ARMATURE ASSY, BRAKE PAD, CONCENTRIC SLAVE CYL, MAGNET SOLENOID SWITCH, BEARING 30219A, DRUM CLUTCH SPROCKET, BRAKE SHOE, SHOCK ABSORBER, FUEL FILTER, PAD SET BRAKE DISK, CLUTCH RELEASE BEARING

  • Estimated contract value: ₹52,133

  • Delivery terms reference option clause up to 25% quantity increase during contract

  • Advance sample approval required within 5 days of award; modifications within 5 days

  • NDA and financial integrity declarations required as part of bid

  • No explicit technical standards specified in data; assume standard defense-grade specifications and OEM/brand conformance

Terms & Conditions

  • Option clause allows ±25% quantity variation at contract and during currency

  • Advance sample approval required within 5 days of contract award

  • Mandatory NDA and anti-liquidity declarations; PAN/GST/EFT documents required

Important Clauses

Payment Terms

Not explicitly stated; ensure alignment with standard government procurement terms and contract-specific payment milestones per delivery and acceptance.

Delivery Schedule

Delivery period adjusts with option clause; minimum 30 days implied for extended delivery, recalculated as (increased quantity / original quantity) × original period.

Penalties/Liquidated Damages

Not specified; bidders should anticipate standard LD clauses for delayed delivery and non-conformity to approved samples.

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Demonstrated financial stability (documented undertaking required)

  • Capability to supply 12 specified electrical/mechanical components for defense use

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

19

Category

2-POLE ISOLATOR SWITCH

Bid Type

Two Packet Bid

Bid Validity

45 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

2-POLE ISOLATOR SWITCH , ARMATURE ASSY , BRAKE PAD , CONCENTRIC SLAVE CYL , MAGNET SOLENOID SWITCH , BEARING 30219A , DRUM CLUTCH SPROCKET , BRAKE SHOE , SHOCK ABSORBER , FUEL FILTER , PAD SET BRAKE DISK , CLUTCH RELEASE BEARING

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

South West delhi

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-South West delhiSouth West delhi--215-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9730847.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 12 Items Sign in for GEM prices

#1

2-POLE ISOLATOR SWITCH

2-POLE ISOLATOR SWITCH

2 nos Delivery: 15 days
#2

ARMATURE ASSY

ARMATURE ASSY

1 nos Delivery: 15 days
#3

BRAKE PAD

BRAKE PAD

4 nos Delivery: 15 days
#4

CONCENTRIC SLAVE CYL

CONCENTRIC SLAVE CYL

1 nos Delivery: 15 days
#5

MAGNET SOLENOID SWITCH

MAGNET SOLENOID SWITCH

1 nos Delivery: 15 days
#6

BEARING 30219A

BEARING 30219A

2 nos Delivery: 15 days
#7

DRUM CLUTCH SPROCKET

DRUM CLUTCH SPROCKET

1 nos Delivery: 15 days
#8

BRAKE SHOE

BRAKE SHOE

2 nos Delivery: 15 days
#9

SHOCK ABSORBER

SHOCK ABSORBER

2 nos Delivery: 15 days
#10

FUEL FILTER

FUEL FILTER

1 nos Delivery: 15 days
#11

PAD SET BRAKE DISK

PAD SET BRAKE DISK

1 nos Delivery: 15 days
#12

CLUTCH RELEASE BEARING

CLUTCH RELEASE BEARING

1 nos Delivery: 15 days

Categories 14

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate certified by bank

5

Non-disclosure declaration on bidder letter head

6

Bidder undertaking of financial non-liquidity/provisional status

7

Advance sample approval documents (within 5 days of award)

8

Technical bid documents and OEM authorizations (as applicable)

Frequently Asked Questions

Key insights about DELHI tender market

What documents are required for tender in Indian Army electrical components?

Bidders must submit PAN Card, GSTIN, cancelled cheque, EFT Mandate certified by bank, and a Non-Disclosure Declaration. Also include NDA on bidder letterhead, financial health undertaking, and advance samples within 5 days of award. OEM authorizations may be required for specific items.

How to participate in Indian Army defense components bid 2026?

Prepare bids with mandatory documents, ensure no liquidation status, and provide advance sample within 5 days of award. Align with option clause for quantity adjustments up to 25% and be ready for delivery period recalibration if approvals lag.

What are the key technical requirements for the electrical components tender?

The tender lists categories like 2-POLE ISOLATOR SWITCH, ARMATURE ASSY, BRAKE PADS and more; exact IS/IST standards aren’t specified in the data. Ensure OEM conformity, robust defense-grade performance, and readiness for sample approval before bulk production.

When is the delivery period adjusted for option quantity changes?

Delivery time adjusts using (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If the original period is shorter, the extended period equals the original; extensions may apply during currency of contract.

What is the estimated contract value for the Army electrical components tender?

The estimated value is ₹52,133.0. This figure signals a modest-scope procurement across 12 item categories, with emphasis on sample conformity, NDA compliance, and secure payment arrangements per standard government terms.

What are the NDA and financial declarations required for bid submission?

Submit a Non-Disclosure Declaration on bidder letterhead and an Undertaking confirming no liquidation or bankruptcy. Provide PAN, GST, and EFT Mandate documentation to demonstrate financial credibility and commitment to confidential procurement processes.