TenderDekho Logo
GEM

Bharat Petroleum Corporation Ltd MR Item Procurement SAGAR Madhya Pradesh 2026 - 25% Quantity Variation & Delivery Terms

Bid Publish Date

16-Jan-2026, 6:31 pm

Bid End Date

16-Feb-2026, 12:00 pm

Generate Docs

Progress

Issue16-Jan-2026, 6:31 pm
Corrigendum10-Feb-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

15

Category

MR ITEM SR NO 01.001

Bid Type

Two Packet Bid

Categories 5

Tender Overview

Bharat Petroleum Corporation Ltd invites bids on GeM for MR ITEM procurement in SAGAR, Madhya Pradesh (470001). The scope covers 15 MR items across multiple SR numbers, with no explicit unit quantities disclosed in the BOQ. The tender emphasizes a flexible quantity clause allowing up to 25% increase/decrease at contract award and during the currency of the contract, at contracted rates. Delivery windows are calculated from the last date of the original delivery order, with a minimum extension period of 30 days. Prevalent GeM portal terms prevail in case of conflicts. This tender requires bidders to comply with option-based delivery and contract-extension terms.

Technical Specifications & Requirements

  • No itemized technical specifications are published in the tender text.
  • Key contractual mechanics include an option clause: quantity may vary by up to 25% of bid/contract quantity.
  • Additional delivery time is computed as (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
  • If the original delivery period is under 30 days, the extension equals the original period; extensions may proceed within the same contract rate.
  • Delivery commencement is tied to the last date of the initial delivery order; all terms align with GeM/Geature terms and conditions.

Terms & Eligibility

  • The bidder must adhere to the quantity variation option clause (up to 25% change).
  • The extension calculation for additional quantity has a defined formula and a minimum 30-day period.
  • In case of conflict, GeM portal terms take precedence over other documents.
  • No specific EMD amount, payment terms, or detailed eligibility criteria are published in the provided data; bidders should prepare to meet standard GeM submission norms and BPCL/GeM policies.
  • Ensure compliance with the latest GeM terms and the BPCL procurement framework for MR items.

Key Specifications

  • 15 MR items listed in BoQ; quantities not disclosed

  • Delivery flexibility up to 25% quantity variation

  • Extension time formula with 30-day minimum

  • GeM terms prevail in conflicts

Terms & Conditions

  • Option clause allows ±25% quantity variation

  • Delivery extension uses specific formula with minimum 30 days

  • GeM terms are final in case of discrepancy

Important Clauses

Delivery Terms

Delivery period commences from the last date of the original delivery order; option-based extensions apply

Option Clause

Quantity may be increased/decreased by up to 25% during contract and currency at contracted rates

Conflict Resolution

GeM portal terms prevail over other documents

Bidder Eligibility

  • Ability to manage MR item supply across 15 items

  • Compliance with GeM portal submission requirements

  • Capacity to absorb 25% quantity variation without price changes

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

MR ITEM SR NO 01.001 , MR ITEM SR NO 03.001 , MR ITEM SR NO 04.001 , MR ITEM SR NO 01.002 , MR ITEM SR NO 03.002 , MR ITEM SR NO 04.002 , MR ITEM SR NO 01.003 , MR ITEM SR NO 03.003 , MR ITEM SR NO 04.003 , MR ITEM SR NO 01.004 , MR ITEM SR NO 03.004 , MR ITEM SR NO 04.004 , MR ITEM SR NO 01.005 , MR ITEM SR NO 03.005 , MR ITEM SR NO 04.005

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8849339.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Bharat Petroleum Corporation Ltd MR Items Tender SAGAR Madhya Pradesh 2026 - GeM MR Item Specifications and ATC 2026

Bharat Petroleum Corporation Ltd

SAGAR, MADHYA PRADESH

Posted: 23 January 2026
Closed: 26 February 2026
GEM

MR ITEM SR.NO. 01.001,MR ITEM SR.NO. 01.002,MR ITEM SR.NO. 01.003,MR ITEM SR.NO. 01.004,MR ITEM SR.

Engineers India Limited

SURAT, GUJARAT

Posted: 8 May 2025
Closed: 29 May 2025
GEM

MR ITEM NO 01.001,MR ITEM NO 01.002,MR ITEM NO 01.003,MR ITEM NO 01.004,MR ITEM NO 01.005,MR ITEM N

Engineers India Limited

Posted: 3 September 2024
Closed: 18 November 2024
GEM

MR ITEM SR. NO. 01.001,MR ITEM SR. NO. 01.002,MR ITEM SR. NO. 01.003,MR ITEM SR. NO. 01.004,MR ITEM

Engineers India Limited

DAKSHINA KANNADA, KARNATAKA

Posted: 15 April 2025
Closed: 13 May 2025
GEM

MR Item Sr. No 01.001,MR Item Sr. No 01.002,MR Item Sr. No 01.003,MR Item Sr. No 01.004,MR Item Sr.

Engineers India Limited

SURAT, GUJARAT

Posted: 12 September 2025
Closed: 7 October 2025
GEM

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

MR ITEM SR NO 01.001

SUPPLY OF QUENCH OIL DRAIN DRUM for 300-VV-HW-1201

1 nos Delivery: 270 days
#2

MR ITEM SR NO 03.001

TRANSPORTATION FOR MR ITEM SR NO 01.001

1 nos Delivery: 270 days
#3

MR ITEM SR NO 04.001

MANDATORY SPARES INCL TRANSPORTATION FOR MR ITEM SR NO 01.001

1 lot Delivery: 270 days
#4

MR ITEM SR NO 01.002

SUPPLY OF MEA DRAIN DRUM for 300-VV-HW-2505

1 nos Delivery: 270 days
#5

MR ITEM SR NO 03.002

TRANSPORTATION FOR MR ITEM SR NO 01.002

1 nos Delivery: 270 days
#6

MR ITEM SR NO 04.002

MANDATORY SPARES INCL TRANSPORTATION FOR MR ITEM SR NO 01.002

1 lot Delivery: 270 days
#7

MR ITEM SR NO 01.003

SUPPLY OF SOLVENT SUMP for 303-VV-HW-3511

1 nos Delivery: 270 days
#8

MR ITEM SR NO 03.003

TRANSPORTATION FOR MR ITEM SR NO 01.003

1 nos Delivery: 270 days
#9

MR ITEM SR NO 04.003

MANDATORY SPARES INCL TRANSPORTATION FOR MR ITEM SR NO 01.003

1 lot Delivery: 270 days
#10

MR ITEM SR NO 01.004

SUPPLY OF AROMATIC SUMP for 303-VV-HW-3512

1 nos Delivery: 270 days
#11

MR ITEM SR NO 03.004

TRANSPORTATION FOR MR ITEM SR NO 01.004

1 nos Delivery: 270 days
#12

MR ITEM SR NO 04.004

MANDATORY SPARES INCL TRANSPORTATION FOR MR ITEM SR NO 01.004

1 lot Delivery: 270 days
#13

MR ITEM SR NO 01.005

SUPPLY OF WAO ACID SUMP for 304-VV-HI-4504

1 nos Delivery: 270 days
#14

MR ITEM SR NO 03.005

TRANSPORTATION FOR MR ITEM SR NO 01.005

1 nos Delivery: 270 days
#15

MR ITEM SR NO 04.005

MANDATORY SPARES INCL TRANSPORTATION FOR MR ITEM SR NO 01.005

1 lot Delivery: 270 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates (if applicable to MR items)

4

Financial statements or bank statements (as per GeM norms)

5

EMD/Security deposit documents (as per GeM/BPCL norms)

6

Technical compliance certificates (if available)

7

OEM authorizations or distributorship letters (if applicable)

Corrigendum Updates

4 Updates
#1

Update

10-Feb-2026

Extended Deadline

16-Feb-2026, 12:00 pm

Opening Date

16-Feb-2026, 12:30 pm

#2

Update

02-Feb-2026
#3

Update

30-Jan-2026
#4

Update

30-Jan-2026

Extended Deadline

10-Feb-2026, 12:00 pm

Opening Date

10-Feb-2026, 12:30 pm

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

How to bid on BPCL MR item tender in SAGAR MP 2026?

Bidders must register on GeM, follow BPCL MR item submission guidelines, and prepare for a 25% quantity variation. Ensure compliance with GeM terms, provide any standard documents, and align delivery schedules with the last date of the original order. Verify that the 15 MR-item scope is included in the bid response.

What documents are required for BPCL MR items GeM bid in SAGAR?

Submit GeM-compliant bid documents, company GST registration, PAN, and any existing OEM authorizations if applicable. Although the tender text lacks explicit EMD details, prepare to provide security as per GeM norms and BPCL policy, plus delivery timelines and proof of capacity to handle 25% quantity variations.

What are the delivery terms for BPCL MR item procurement in SAGAR?

Delivery starts from the last date of the original delivery order. If the option clause is exercised, extended delivery time is calculated as (additional quantity ÷ original quantity) × original period, with a mandatory minimum of 30 days. BPCL may adjust schedules within the contract rate.

What is the scope of MR items in BPCL SAGAR tender 2026?

The BoQ lists 15 MR items across SR numbers, but specific quantities and units are not disclosed. The scope covers MR items under BPCL procurement, with no additional technical specs published in the tender text.

What standards or certifications are required for BPCL GeM MR items?

No explicit technical standards or certifications are published in the tender text. Bidders should adhere to GeM portal guidelines and BPCL procurement practices, and prepare to demonstrate capability for MR item supply under normal GeM compliance requirements.

When is the BPCL SAGAR MR items bid deadline or timeline?

The tender text does not provide explicit start/end dates. Bidders should monitor GeM portal updates for BPCL MR item procurement in SAGAR, MP, and prepare bid documentation aligned to GeM submission windows and BPCL policy.

How does the 25% quantity variation affect BPCL MR item bids?

The purchaser may increase or decrease the contracted quantity by up to 25% at contract placement and during the currency. Bids must reflect agreed unit rates for potential quantity changes and ensure delivery readiness for both excess and reduced orders.

What is the priority document rule if conflicts arise in BPCL GeM terms?

In case of conflict, terms on the GeM portal take precedence over other documents. Bidders should align submissions with GeM terms and BPCL ATC to avoid bid rejection due to inconsistencies.

Similar Tenders

5 found

Item No 1a,Item No 1b,Item No 1c,Item No 1d,Item No 1e,Item No 1f,Item No 1g,Item No 1h,Item No 1i,

Airports Authority Of India

📍 CHENNAI, TAMIL NADU

EMD: ₹1.6 L
Est: ₹52.2 L
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

Indian Oil Corporation Limited Goods Supply Tender 2026 in India with 25% Quantity Flexibility and MSE Preference

Indian Oil Corporation Limited

📍 MATHURA, UTTAR PRADESH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Item No.1,Item No.2,Item No.3,Item No.4,Item No.5,Item No.6,Item No.7,Item No.8,Item No.9,Item No.1

Gail India Limited

📍 AGRA, UTTAR PRADESH

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

Item No. 1,Item No. 2,Item No. 3,Item No. 4,Item No. 5,Item No. 6,Item No. 7,Item No. 8,Item No. 9,

Nuclear Power Corporation Of India Limited

📍 CHITTORGARH, RAJASTHAN

EMD: ₹7,804
⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM

Item no.1,Item no.2,Item no.3,Item no.4,Item no.5,Item no.6,Item no.7,Item no.8,Item no.9,Item no.1

Damodar Valley Corporation

📍 KODERMA, JHARKHAND

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM