Bid Publish Date
07-Mar-2026, 2:39 pm
Bid End Date
17-Mar-2026, 3:00 pm
Location
Progress
Quantity
3
Bid Type
Two Packet Bid
Organization: Upid Web Portal - Irrigation Department, Uttar Pradesh. Procured Wall Mount Split Air Conditioners (V3 ISI Marked to IS 1391 Part 2, Q2). No listed BOQ items or estimated value. The tender includes an option clause allowing up to 25% quantity variation at contracted rates and a calculated delivery extension mechanism with minimum 30 days. ATC file exists for conditions. No start/end dates disclosed. This procurement targets compliant, ISI-marked HVAC units suitable for government irrigation facilities within UP.
Product: Wall mount split air conditioner, ISI marked
Standards: IS 1391 (Part 2) for V3 capacity devices
Certifications: ISI certification; OEM authorization
Quality: Government procurement compliant test/inspection as per ATC
Quantities: Flexible up to 25% increase/decrease at contracted rates
Option clause allows ±25% quantity variation
Delivery period adjusts with minimum 30 days extension
ATC terms govern any additional conditions
Option clause permits up to 25% quantity change at contracted rates; delivery extension with a minimum 30 days, calculated as (Increased quantity ÷ Original quantity) × Original delivery period
Products must be ISI marked and conform to IS 1391 Part 2 for wall mount split ACs; OEM authorizations required
Bid terms include an uploaded ATC document; bidders must review and adhere to specified terms
Proven capability to supply ISI marked wall mount split ACs
Valid ISI certification for IS 1391 Part 2
Experience in government HVAC tenders and compliance with ATC terms
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates for similar HVAC procurements
Financial statements (last 2 years)
EMD/Security deposit submission proof
Technical bid documents showing ISI marking and IS 1391 compliance
OEM authorization letter (if applicable)
Any ATC-specific submission requirements from the uploaded ATC
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | AEVITAS PROCUREMENT SERVICE PRIVATE LIMITED Under PMA | Make : LLOYD Model : GLS18I3AGCSR | 17-03-2026 12:57:56 | |
| 2 | Digitek Computer Associate Under PMA | Make : LG Model : AS-Q18KTXE | 16-03-2026 17:25:15 | |
| 3 | Sakchhi India Enterprises Under PMA | Make : BLUE STAR Model : IA318DXU | 17-03-2026 00:48:57 | |
| 4 | SHEELA SHREE TRADERS AND SERVICES Under PMA | Make : LG Model : AS-Q18KTXE | 16-03-2026 23:20:31 | |
| 5 | TATER INTERNATIONAL IMPEX Under PMA | Make : Voltas Model : 183INV VECTRA ZEN SILVER | 16-03-2026 16:22:23 | |
| 6 | TECHNO SERVA Under PMA | Make : LG Model : AS-Q18KTXE | 17-03-2026 09:08:37 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SHEELA SHREE TRADERS AND SERVICES Under PMA | Item Categories : Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) | |
| L2 | TECHNO SERVA Under PMA | Item Categories : Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) | |
| L3 | Digitek Computer Associate Under PMA | Item Categories : Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) |
Please sign in or create an account to view contract details and download result documents.
Key insights about UTTAR PRADESH tender market
Bidders must provide ISI certification for IS 1391 Part 2, OEM authorizations, GST, PAN, and experience certificates. Include EMD as per local rules, and review the uploaded ATC for any additional submission requirements. Ensure delivery capability within 30+ days and readiness for quantity variations up to 25%.
Submit GST registration, PAN, company financials, past project experience, ISI/IS 1391 compliance certificates, OEM authorization, and the EMD receipt. Include technical bid demonstrating ISI marking and ATC adherence, plus any ATC-specified annexures.
Only ISI marked wall mount split ACs conforming to IS 1391 Part 2 are required. Look for V3 class capacity labeling, energy efficiency metrics in product data sheets, and OEM warranty terms. Ensure compliant with government testing and inspection requirements in the ATC.
The delivery period can extend with a 30-day minimum, computed if quantity increases. Original delivery schedule remains the baseline; extended period is proportionally calculated per the option clause, requiring coordination with the Irrigation Department.
Eligibility requires demonstrated experience in supplying ISI-marked HVAC equipment, valid GST/PAN, financial stability documentation, and IS 1391 compliance. OEM authorization strengthens bid; bidders should review ATC terms for additional criteria.
Quantity can vary by up to 25% of the bid quantity at contracted rates. The extended delivery period uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.
Required standards include IS 1391 Part 2 for wall mount split ACs and ISI certification. OEM authorization is preferred, and the ATC document outlines any additional compliance, testing, or acceptance criteria invoked by the Irrigation Department.
Submit GST, PAN, experience certificates for similar HVAC work, financials, EMD proof, ISI and IS 1391 compliance certificates, OEM authorizations, and the ATC-compliant technical bid; ensure bid formatting aligns with UP procurement guidelines.
Sign up now to access all documents
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS