SITC of Main Switch Assembly for Machine
Security Printing And Minting Corporation Of India Limited (spmcil)
NASHIK, MAHARASHTRA
Bid Publish Date
06-Jan-2026, 3:55 pm
Bid End Date
16-Jan-2026, 4:00 pm
Location
Progress
Quantity
50
Bid Type
Two Packet Bid
Yantra India Limited invites bids for the FOOT SWITCH ASSEMBLY CH SINGLE WA under the Department of Defence Production framework. The tender references quantity variation up to 25% and extended delivery time rules; Bidders must ensure OEM authorization in India for imported components and adhere to the 100% NEFT/RTGS payment within 30 days clause post material receipt or bill submission. Key differentiators include the option clause on quantities and strict document compliance tied to OFBH terms. The procurement targets defense-related equipment supply with a clear emphasis on post-award servicing compliance and legible documentation. This tender emphasizes supplier readiness for rapid volume adjustments and rigorous commercial discipline.
FOOT SWITCH ASSEMBLY CH SINGLE WA
Quantity: up to 25% variation on bid quantity
Delivery timeline tied to last delivery order date; minimum 30 days extension
100% payment through NEFT/RTGS within 30 days of material receipt or bill submission
Imported items require Indian-registered OEM/authorized seller for after-sales support
25% quantity variation right during contract and currency
100% NEFT/RTGS payment within 30 days post receipt/bill
OEM/Authorized Seller with India office required for imported items
100% payment against seller’s bill via NEFT/RTGS within 30 days from receipt of material or submission of documents, whichever is later.
Delivery period commences from the last date of original delivery order; extended time due to option clause requires (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Not explicitly stated; adherence to delivery schedules implied; ATC terms require compliance with bid conditions to avoid rejection.
Not under liquidation, court receivership, or similar proceedings
Demonstrated capability to supply defense-grade foot switch assemblies
Authorized OEM certificate or dealer authorization for imported components
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Security Printing And Minting Corporation Of India Limited (spmcil)
NASHIK, MAHARASHTRA
Bharat Electronics Limited (bel)
Armoured Vehicles Nigam Limited
THANE, MAHARASHTRA
Armoured Vehicles Nigam Limited
THANE, MAHARASHTRA
Indian Army
AGRA, UTTAR PRADESH
Tender Results
Loading results...
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates showing defense-grade supply capability
Financial statements / undertakings indicating financial standing
EMD submission proof (as per tender terms) and security deposit if applicable
OEM authorization certificates or authorized dealer certificates
Catalog of the specific FOOT SWITCH ASSEMBLY CH SINGLE WA to be supplied
ATC compliance document signed/stamped per OFBH format
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | JAI SHREE GANESH AUTOMATION Under PMA | Make : BCH ELECTRIC LIMITED Model : FSGY2 Title : FOOT SWITCH ASSEMBLY CH SINGLE WA | 16-01-2026 15:49:43 | Qualified |
| 2 | MUNDHRA TRADING AGENCY Under PMA | Make : BCH Model : FOOT SWITCH Title : FOOT SWITCH ASSEMBLY CH SINGLE WA | 14-01-2026 14:32:29 | Qualified |
| 3 | PACIFIC ENGINEERS Under PMA | Make : Unbrand Model : FOOT SWITCH ASSEMBLY Title : FOOT SWITCH ASSEMBLY CH SINGLE WA | 16-01-2026 15:52:35 | Qualified |
| 4 | SURYA NDUSTRIES Under PMA | Make : OEM Model : FOOT SWITCH ASSEMBLY CH SINGLE WA Title : FOOT SWITCH ASSEMBLY CH SINGLE WA | 16-01-2026 09:01:41 | Qualified |
| 5 | UNIQUE ENTERPRISES Under PMA | Make : BCH ELECTRIC INDIA Model : FSGY 2 Title : FOOT SWITCH ASSEMBLY CH SINGLE WA | 15-01-2026 22:25:56 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SURYA NDUSTRIES Under PMA | ₹76,271 | Item Categories : FOOT SWITCH ASSEMBLY CH SINGLE WA |
| L2 | MUNDHRA TRADING AGENCY Under PMA | ₹1,62,500 | Item Categories : FOOT SWITCH ASSEMBLY CH SINGLE WA |
| L3 | PACIFIC ENGINEERS Under PMA | ₹1,87,076 | Item Categories : FOOT SWITCH ASSEMBLY CH SINGLE WA |
| L4 | JAI SHREE GANESH AUTOMATION Under PMA | ₹2,83,263 | Item Categories : FOOT SWITCH ASSEMBLY CH SINGLE WA |
| L5 | UNIQUE ENTERPRISES Under PMA | ₹3,42,598 | Item Categories : FOOT SWITCH ASSEMBLY CH SINGLE WA |
Key insights about MAHARASHTRA tender market
To bid, submit cataloged FOOT SWITCH ASSEMBLY CH SINGLE WA with OEM/dealer authorization, provide ATC-compliant documents, and ensure 100% NEFT/RTGS payment terms within 30 days of material receipt. Include mandatory certificates and financial undertakings; comply with the 25% quantity option clause.
Required documents include GST certificate, PAN, OEM/dealer authorization, defense-grade experience certificates, financial statements, catalog of the product, and ATC-compliant documentation. Ensure legible uploads and OFBH-compliant submissions as specified in ATC terms.
Delivery time follows the last date of the original delivery order; if quantity increases by up to 25%, extended time is calculated as (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days extension.
Payment terms specify 100% payment against the seller’s bill via NEFT/RTGS within 30 days of receipt of material or submission of documents, whichever is later. Ensure invoicing is aligned with delivered goods and proper documentation.
Yes. Imported items require an OEM or authorized seller with a registered Indian office for after-sales support; submit the certificate to confirm compliance and service readiness in India.
The procurement targets a FOOT SWITCH ASSEMBLY CH SINGLE WA for deployment under the Defence Production department. While BOQ items are not listed, bidders must provide cataloged product details, certifications, and OEM authorization to demonstrate scope readiness.
Prepare ATC-compliant bid submissions, sign and stamp per OFBH format, ensure legible documents, and upload required product catalogs and OEM certificates. Non-compliance risks bid rejection under buyer-added terms.
The tender requires OFBH-compliant documentation and OEM authorization; while explicit ISI/ISO standards are not stated, bidders should provide standard-compliant catalog data and service capabilities for defense-grade electrical assemblies.
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS