Bid Publish Date
30-Jul-2026, 11:14 am
Bid End Date
17-Aug-2026, 11:00 am
Progress
Modern Coach Factory Raebareli under Indian Railways invites bids for the supply of Solid Cushion Tyres (V3) (Q3). Key specifications include Rim, Tyre Size (Inch), and Load Capacity of Tyre (In Kg), with bidders required to furnish on-demand test reports and certificates. The contract contemplates supply-only delivery, with inspection by RITES or at the consignee site, and a possible 25% quantity variation under the option clause. The tender emphasizes OEM authorization, pre/post-dispatch inspection, and MSE purchase preference, shaping tender competitiveness for manufacturers/distributors of rail-grade tyres. Location details are implied through the Raebareli unit’s procurement footprint, aligning with Indian Railways asset maintenance. Unique aspects include the formalized inspection framework and the option to adjust quantities mid-contract at contracted rates, subject to minimum time extensions. This tender targets suppliers capable of ISO/industry-standard compliance and rapid delivery within railway operations.
Solid Cushion Tyres (V3) category for rail coaches
Dimensions: Rim, Tyre Size (Inch), Load Capacity (Kg)
Test reports and certificates to be provided on demand
Inspection by RITES (pre-dispatch) or RITES/IC (post-receipt)
OEM authorization required; supply of goods only
Option to extend/modify quantity up to 25% at contracted rates
Delivery schedule tied to original delivery period with minimum 30 days extension
Pre-dispatch and post-receipt inspection by designated agencies (RITES)
Not explicitly stated; payment terms aligned with standard IR procurement terms and ATC
Delivery period to commence from last date of original delivery order; extensions governed by option clause
Not specified here; subject to ATC and applicable IR guidelines
Manufacturer/authorized distributor of rail tyres with OEM authorization
Evidence of prior supply experience in rail or heavy-duty tyre applications
Ability to provide on-demand test reports and quality certificates (RITES-worthy)
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | RUBBER KING TYRE PRIVATE LIMITED(MII) Under PMA | Item Categories : Solid Cushion Tyres (V3) | |
| L2 | INDUSTRIAL RUBBER COMPANY (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Solid Cushion Tyres (V3) | |
| L3 | STANDARD HOME NEEDS Under PMA | Item Categories : Solid Cushion Tyres (V3) | |
| L4 | RUBBERTECH (MII) Under PMA | Item Categories : Solid Cushion Tyres (V3) | |
| L5 | SHOURYA ENTERPRISES Under PMA | Item Categories : Solid Cushion Tyres (V3) |
Please sign in or create an account to view contract details and download result documents.
Quantity
100
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Solid Cushion Tyres (V3) (Q3)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Rae Bareli
Delivery Pincodes
229120
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rajesh Kumar | 229120,Modern Coach Factory (MCF), Lalganj, Raebareli | Rae Bareli | Uttar Pradesh | 229120 | 100 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
GST certificate
PAN card
Experience certificates for similar rail tyre supply
Financial statements demonstrating capability to execute the contract
EMD/Security deposit (as applicable in tender terms)
Technical bid documents and OEM authorization/claims
Pre-dispatch inspection readiness documentation
Post-receipt inspection readiness and quality certificates (RITES/IC if applicable)
| Category | Specification | Requirement |
|---|---|---|
| Dimension and Constructions | Rim | Without Rim |
| Dimension and Constructions | Tyre Size (Inch) | 28X9-15 |
| Dimension and Constructions | Load Capacity of Tyre (In Kg) | 2001-2200 |
| Certification, Testing & Warranty | Agreed to furnish all the test reports and certificates to buyer/consignee on demand | Yes |
Bidders must submit OEM authorization, GST, PAN, experience certificates, and financials with the technical bid. The contract allows up to 25% quantity variation; ensure on-demand test reports are ready. Pre-dispatch inspection by RITES is mandatory; ensure readiness of post-delivery inspection documentation.
Submit GST certificate, PAN, experience certificates for rail tyre supply, financial statements, EMD/security deposit, OEM authorization, technical bid, and quality/test certificates. Ensure documentation proves manufacturing capability and adherence to rail-grade standards; include pre/post-dispatch inspection readiness.
Key specs cover Rim, Tyre Size (Inch), and Load Capacity of Tyre (Kg). Bidders must provide on-demand test reports and certificates; ensure tyre dimensions and load ratings match rail coach requirements and that OEM approvals are current.
Inspection can be pre-dispatch by RITES at seller premises or post-receipt at the consignee site by RITES/IC. Ensure all inspection procedures and certificates are available and align with the tender terms.
The purchaser may increase or decrease the quantity up to 25% of bid quantity at contract placement and during the currency of the contract, with extensions calculated as specified, minimum 30 days.
MSME preference permits price matching within L1+15% for 25% of the contract value, provided the bidder is an eligible MSE and the bidder is the manufacturer of the offered product; traders are excluded.
Delivery is linked to the original delivery period with potential extensions; exact payment terms are not stated in this snippet and would follow IR standard terms via ATC, requiring compliance and timely delivery.
Obtain an Authorization Form/Certificate from the OEM detailing name, designation, address, email, and phone. Include this with the bid to demonstrate authorized supply capability for rail tyres.