Indian Army Department Of Military Affairs MT Spare Tender 2026 - On-site Service Centers, Pre-dispatch Inspection, Turnover Criteria
Indian Army
TIRUVALLUR, TAMIL NADU
Bid Publish Date
02-Feb-2026, 10:42 pm
Bid End Date
13-Feb-2026, 9:00 am
Location
Progress
RAQuantity
135
Category
MT Spare 1
Bid Type
Two Packet Bid
Indian Army through the Department of Military Affairs invites bids for MT Spare 1-11 categories in Tiruvallur, Tamil Nadu. The tender scope covers multiple MT spare items (11 total) with no explicit quantities in the BOQ. Key conditions include the establishment of a Functional Service Centre in the state within 30 days of award, and turnover verification via audited statements or CA certificate for the last three years. The process emphasizes pre-dispatch or post-receipt inspection by a nominated agency, and advance sample approval within 5 days of award, with a 7-day response for modifications. Delays in sample approval may extend delivery without LD. A bidder must supply samples gratis for testing and adhere to contract specifications if approved.
MT Spare categories 1-11 referenced; exact item specifications not provided
Mandatory service centre presence in Tamil Nadu or plan to establish within 30 days
Advance sample process: 5-day submission, 7-day modification window
Post-acceptance inspection by Board of Officers or nominated agency
Turnover verification for last 3 years via audited statements or CA certificate
Functional Service Centre in each consignee state or establishment within 30 days
Advance sample approval: 5 days submission, 7 days for modifications
Inspection by Board of Officers or nominated agency; post-receipt/ pre-dispatch as required
Payment release is contingent on documentary evidence of having a functional Service Centre; exact % and timing not specified in available data
Delivery period may be refixed if buyer delays in approval of advance sample; LD not specified in the available data
Potential termination for non-conforming samples or failure to meet approved specifications; details depend on contract framework
Demonstrated turnover in last 3 years with supporting audited statements or CA certificate
Ability to establish or already have a Functional Service Centre in Tamil Nadu
Compliance with advance sample submission and inspection requirements
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
TIRUVALLUR, TAMIL NADU
Indian Army
TIRUVALLUR, TAMIL NADU
Indian Army
TIRUVALLUR, TAMIL NADU
Indian Army
TIRUVALLUR, TAMIL NADU
Indian Army
TIRUVALLUR, TAMIL NADU
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | MT Spare 1 | LV7/MARUTI/5340-135146 Lock Assy Gate Side LH | 12 | nos | dycomdt@124 | 30 |
| 2 | MT Spare 2 | LV7/MARUTI/51810M80900 Piston Kit Master Cylinder | 5 | nos | dycomdt@124 | 30 |
| 3 | MT Spare 3 | LV7/MARUTI/69320M80110 Hinge Door Lower RH | 12 | nos | dycomdt@124 | 30 |
| 4 | MT Spare 4 | LV7/MARUTI/37200M83200-23H Switch Assy Change Over | 18 | nos | dycomdt@124 | 30 |
| 5 | MT Spare 5 | LV7/MARUTI/53401M83311 Cylinder Assy Rear Wheel RH | 17 | nos | dycomdt@124 | 30 |
| 6 | MT Spare 6 | LV7/MARUTI/15100M830A1 Pump Assy Fuel | 13 | nos | dycomdt@124 | 30 |
| 7 | MT Spare 7 | LV7/MARUTI/55100 M 78812 Piston/Cup Set | 14 | nos | dycomdt@124 | 30 |
| 8 | MT Spare 8 | LV7/MARUTI/84681M80011 Weather Strip Back Door Opening | 9 | nos | dycomdt@124 | 30 |
| 9 | MT Spare 9 | LV7/MARUTI/36610M830M0 Harness Assy Wiring No.1 | 11 | nos | dycomdt@124 | 30 |
| 10 | MT Spare 10 | LV7/MG/CVD-09824M-99332 Jack with Handle | 5 | nos | dycomdt@124 | 30 |
| 11 | MT Spare 11 | LV7/MARUTI/82280M84010 Cylinder Assy Rear Gate | 19 | nos | dycomdt@124 | 30 |
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA certificate indicating turnover for last 3 years
Experience certificates demonstrating similar procurements (if available)
OEM authorization or manufacturer credentials (if applicable)
Proof of service centre capabilities in Tamil Nadu (or plan to establish within 30 days)
Technical bid documents demonstrating compliance with contract terms
Any other documents specified in ATC or terms and conditions
Start
17-Feb-2026, 2:00 pm
End
18-Feb-2026, 2:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | KALYANI ENTERPRISES(MII) Under PMA Winner | ₹2,34,742 | Item Categories : MT Spare 1,MT Spare 2,MT Spare 3,MT Spare 4,MT Spare 5,MT Spare 6,MT Spare 7,MT Spare 8,MT Spare 9, |
| L2 | ROYAL ENTERPRISES (MII) Under PMA | ₹2,88,174 | Item Categories : MT Spare 1,MT Spare 2,MT Spare 3,MT Spare 4,MT Spare 5,MT Spare 6,MT Spare 7,MT Spare 8,MT Spare 9, |
| L3 | SABARI ASSOCIATES (MII) Under PMA | ₹2,89,622 | Item Categories : MT Spare 1,MT Spare 2,MT Spare 3,MT Spare 4,MT Spare 5,MT Spare 6,MT Spare 7,MT Spare 8,MT Spare 9, |
🎉 L1 Winner
KALYANI ENTERPRISES(MII) Under PMA
Final Price: ₹2,34,742
Key insights about TAMIL NADU tender market
To bid on the Indian Army MT spare tender in Tiruvallur, bidders must provide turnover evidence for the last three years, establish or show a functional service centre in Tamil Nadu, and be prepared for advance sample submission within 5 days of award. Ensure compliance with inspection and delivery terms outlined in the ATC.
Required documents include GST registration, PAN card, 3-year turnover evidence (audited or CA certificate), experience certificates, OEM authorizations (if applicable), proof of service centre capability in Tamil Nadu, and technical bid documents showing compliance with contract terms.
Inspection may be pre-dispatch at seller premises or post-receipt at the consignee site, conducted by a Board of Officers or a nominated inspection agency as per ATC. Advance sample approval must be secured before bulk manufacturing.
Submit 1 advance sample within 5 days of award; buyer to approve or request modifications within 7 days. If delayed by the buyer, the delivery period may be refixed without LD. Unapproved samples may lead to contract modification or termination.
Bidders must show the minimum average annual turnover for the last three years as specified in the bid document, supported by audited balance sheets or CA certificates indicating turnover for the relevant period.
Yes. A Functional Service Centre must exist in the state of each consignee location, or the bidder must establish one within 30 days of contract award; payments depend on documentary evidence of this capability.
The tender references MT Spare 1 through MT Spare 11, but no explicit item quantities are provided in the available data. Bidders should prepare to address 11 categories as part of the procurement scope.
Post-acceptance inspections occur at the consignee site before formal acceptance, as part of the inspection regime outlined by the buyer. Ensure readiness to support verification and any corrective actions requested.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS