Tender Notice for Supply of Copper Plate Earth Electrode,Supply of Copper Strip,Supply of Equipotential Copper Earth in KACHCHH, GUJARAT

Bid Publish Date

07-Aug-2026, 3:37 pm

Bid End Date

28-Aug-2026, 3:00 pm

EMD

₹23,793

Value

₹14,03,790

Progress

Issue07-Aug-2026, 3:37 pm
AwardPending

A tender has been published for Ans, finance, hr, engineering, tech, ops, commercial, general Store, it Supply of Copper Plate Earth Electrode, Supply of Copper Strip, Supply of Equipotential Copper Earth Bus Bar, Supply of PVC pipe for earth pits, Supply of Salt, Supply of Charcoal, Brazing of interconnection, Construction of Earthing system Earth Pit, Construction of Inspection Chamber for Earth pits, Soil Treatment, Hard Excavation Work, Soft Excavation Work, Supply and Installation of Battery Charger, Supply and Installation of 12V 65 AH Battery, Supply of XLR Connector 3-Pin Female, Supply of terminal blocks for DC Connection, Supply of Rf Coaxial Surge Protectors, Supply of 4 sqmm DC power cable, Supply of 10 sqmm earthing copper cable, Supply of Adhesive Anti-Static ESD Mat and Wrist Strap, SITC of the complete Earthing System in KACHCHH, GUJARAT. Quantity: 1476 by. Submission Deadline: 28-08-2026 15: 00: 00. Check eligibility and apply.

Authority & Contact

Organization

Ans,finance,hr,engineering,tech,ops,commercial,general Store,it

Office Name

Bhuj Airport Bhuj

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1476

Category

SITC of the complete Earthing System

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

5

OEM Avg. Turnover

5

Past Performance

80 %

Warranty Period

3 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of Copper Plate Earth Electrode , Supply of Copper Strip , Supply of Equipotential Copper Earth Bus Bar , Supply of PVC pipe for earth pits , Supply of Salt , Supply of Charcoal , Brazing of interconnection , Construction of Earthing system Earth Pit , Construction of Inspection Chamber for Earth pits , Soil Treatment , Hard Excavation Work , Soft Excavation Work , Supply and Installation of Battery Charger , Supply and Installation of 12V 65 AH Battery , Supply of XLR Connector 3-Pin Female , Supply of terminal blocks for DC Connection , Supply of Rf Coaxial Surge Protectors , Supply of 4 sqmm DC power cable , Supply of 10 sqmm earthing copper cable , Supply of Adhesive Anti-Static ESD Mat and Wrist Strap , SITC of the complete Earthing System

Advisory Bank

ICICI

ePBG Percentage

3%

ePBG Duration (Months)

39

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Kachchh

Delivery Pincodes

370001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mahendra Godara370001,bhuj airport ring road bhujKachchhGujarat370001360-

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9714728.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 21 Items Sign in for GEM prices

#1

Supply of Copper Plate Earth Electrode

Supply of Copper Plate Earth Electrode

3 numbers Delivery: 60 days
#2

Supply of Copper Strip

Supply of Copper Strip

400 meters Delivery: 60 days
#3

Supply of Equipotential Copper Earth Bus Bar

Supply of Equipotential Copper Earth Bus Bar

2 numbers Delivery: 60 days
#4

Supply of PVC pipe for earth pits

Supply of PVC pipe for earth pits

3 numbers Delivery: 60 days
#5

Supply of Salt

Supply of Salt

360 kg Delivery: 60 days
#6

Supply of Charcoal

Supply of Charcoal

360 kg Delivery: 60 days
#7

Brazing of interconnection

Brazing of interconnection

1 job Delivery: 60 days
#8

Construction of Earthing system Earth Pit

Construction of Earthing system Earth Pit

3 job Delivery: 60 days
#9

Construction of Inspection Chamber for Earth pits

Construction of Inspection Chamber for Earth pits

3 job Delivery: 60 days
#10

Soil Treatment

Soil Treatment

3 job Delivery: 60 days
#11

Hard Excavation Work

Hard Excavation Work

37 cu m Delivery: 60 days
#12

Soft Excavation Work

Soft Excavation Work

37 cu m Delivery: 60 days
#13

Supply and Installation of Battery Charger

Supply and Installation of Battery Charger

1 numbers Delivery: 60 days
#14

Supply and Installation of 12V 65 AH Battery

Supply and Installation of 12V 65 AH Battery

2 numbers Delivery: 60 days
#15

Supply of XLR Connector 3-Pin Female

Supply of XLR Connector 3-Pin Female

14 numbers Delivery: 60 days
#16

Supply of terminal blocks for DC Connection

Supply of terminal blocks for DC Connection

30 numbers Delivery: 60 days
#17

Supply of Rf Coaxial Surge Protectors

Supply of Rf Coaxial Surge Protectors

14 numbers Delivery: 60 days
#18

Supply of 4 sqmm DC power cable

Supply of 4 sqmm DC power cable

100 meters Delivery: 60 days
#19

Supply of 10 sqmm earthing copper cable

Supply of 10 sqmm earthing copper cable

100 meters Delivery: 60 days
#20

Supply of Adhesive Anti-Static ESD Mat and Wrist Strap

Supply of Adhesive Anti-Static ESD Mat and Wrist Strap

2 numbers Delivery: 60 days
#21

SITC of the complete Earthing System

SITC of the complete Earthing System

1 job Delivery: 60 days

Categories 55

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer