TenderDekho Logo
GEM

Government Tender Published for Spare Handle Kit for" existing Needle Valve (Regulating Type) , Swagelok Model No. SS12NRS12",PTFE in SURAT, GUJARAT

Bid Publish Date

08-Apr-2025, 9:54 am

Bid End Date

13-May-2025, 9:00 am

Latest Corrigendum Available

Progress

Issue08-Apr-2025, 9:54 am
Corrigendum06-May-2025
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

35

Category

Spare Handle Kit for" existing Needle Valve (Regulating Type) , Swagelok Model No. SS12NRS12"

Bid Type

Two Packet Bid

Categories 9

Nuclear Power Corporation Of India Limited invites bids for Spare Handle Kit for" existing Needle Valve (Regulating Type), Swagelok Model No. SS12NRS12", PTFE Stem Packing Kit for" existing Needle Valve (Regulating Type), Swagelok Model No. SS12NRS12", Spare Needle Valve (Regulating Type), Swagelok Model No. SS12NRS12" in SURAT, GUJARAT. Quantity: 35. Submission Deadline: 13-05-2025 09: 00: 00. Submit your proposal before the deadline.

Documents 6

GeM-Bidding-7678823.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

PROCON make Valve Actuator Model 1002WT,Spare Kit for PROCON make Valve Actuator Model1002 WT,PROCO

Neyveli Uttar Pradesh Power Limited

KANPUR DEHAT, UTTAR PRADESH

Posted: 1 January 2025
Closed: 29 January 2025
GEM

Needle Valve,Needle Valve,Needle Valve,Needle Valve,Needle Valve,Needle Valve,Needle Valve,Needle V

Nuclear Power Corporation Of India Limited

THANE, MAHARASHTRA

Posted: 4 March 2025
Closed: 10 April 2025
GEM

Needle Valve,Needle Valve

Odisha Power Generation Corporation Limited

JHARSUGUDA, ODISHA

Posted: 30 August 2025
Closed: 22 September 2025
GEM

REGULATING TYPE, TRUNION MOUNTED HYDRAULIC ACTUATOR COMPLETE WITH MANIFOLD BLOCK, VALVE STAND & NEC

Andrew Yule And Company Limited

NADIA, WEST BENGAL

Posted: 15 July 2025
Closed: 5 August 2025
GEM

Spare Parts for AODD Pump, Make: Blagdon, Model: B25KTBBTTK, Part No- 25-014, Item- Diaphragm (Buna

Directorate Of Purchase And Stores

Posted: 21 July 2025
Closed: 6 August 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Corrigendum Updates

1 Update
#1

Update

06-May-2025

Extended Deadline

13-May-2025, 9:00 am

Opening Date

13-May-2025, 9:30 am

Frequently Asked Questions

Key insights about GUJARAT tender market

What are the eligibility requirements for participation in the tender?

The eligibility requirements include being a registered entity, demonstrating prior experience in supplying similar spare parts, and compliance with relevant regulations. Bidders must also show financial capacity to fulfill the order.

What technical specifications must be adhered to for the components?

The technical specifications entail compliance with the Swagelok Model No. SS12NRS12 requirements and meeting established quality assurance standards. It is essential that all components delivered perform dependably and meet operational criteria.

How is the Earnest Money Deposit (EMD) structured for this tender?

The Earnest Money Deposit (EMD) requirements must be checked in the tender document, as bids may typically require a monetary assurance to ensure commitment to the proposal. Bidders should submit the EMD along with their proposal according to specified guidelines.

What submission methods are accepted for the tender proposals?

Only electronic submissions through the designated portal will be accepted. Bidders must ensure that all documents are compiled according to the accepted formats, which are stipulated within the tender guidelines.

What benefits are available for Micro, Small, and Medium Enterprises (MSEs)?

The tender encourages participation from Micro, Small, and Medium Enterprises (MSEs) through specific provisions which may include relaxed eligibility criteria and additional support measures. Bidders are advised to read through guidelines to understand these advantages thoroughly.